    Name of the work: Providing Bore well at Belupalli H/o Belupalli in Baireddypalli Mandal

    sno Item of work Rate per 1 Drilling of 163mm dia bore well clear in all strata including

    fixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete 141.00 Rmts 300.00 Rmts

    2 Supplying and fixing of 180mm dia PVC casing pipe ISI Mark 18.30 Rmts 491.60 Rmts

    3 Supplying and fixing of 180mm dia PVC bore cop 1 No 140.00 No

    4 Provision towards Geological survey charges for selection of borewell including cost, conveyance andtransportation charges etc., complete 1 No 750.00 No

    5 Provision for Electrification

    6 QC Charges @ 0.50%

    Assistant.Executive Engin

    RWS&S,Baireddypalli Ma

    Working Es t imate

    Quantity

  • 8/13/2019 CDP CR - BR Palli

    2/226

    Amount

    42300

    8996 0.5 291.2 145.6

    140 3 85 255

    2.4 146 350.40.8 291.2 232.96

    750 0.6 291.2 174.72

    22439

    375

    75000

    eer.

    dal

  • 8/13/2019 CDP CR - BR Palli

    3/226

    Name of the sub work: Providing New Borewell at Kaminayanipalli H/o devadoddi in Baireddypalli Mandal

    Grant:-CDP 2011-12 Estt.cost.Rs: 1.00 lakhs

    1 Drilling of 163mm dia bore well clear in all strata includingfixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    138.68 Mts 300.00 Rmt 416042 Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    17.06 Mts 503.56 Rmt 85913 Supplying and fixing of 180mm PVC Bore cap

    1 No 140.00 1no 1404 Provision towards Geological survey charges for

    selection of borewell including cost, conveyance andtransportation charges etc., complete 1 No 750.00 1No 750

    5 Earth work excavation and depositing on bank with initial lead andlift in OG soils for pipe line trench of size 0.50x0.75 including costand conveyance of all materials and labour charges and laying and

    jointing of 75 mm dia 6 Kg/Sqcm PVC pipes true to alignment andgradient including refilling the pipe line trench with excavated earthincluding cost and conveyance of all materials and labour chargesetc.,but excluding the cost of PVC pipes

    300.00 Mts. 68.02 Rmt 204066 Cost of 75 mm dia 6Kg/Sqcm PVC pipes

    300.00 Mts. 86.59 Rmt 259777 Supply and fixing of 50 mm dia GI pipes 1.50 Mts. 320.32 Mts. 480

    8 Supply and fixing of 50 mm dia GI Couplings 2.00 No 119.60 No 480

    9 Supply and fixing of 50 mm dia GI Bend 1.00 No 109.20 No 109

    10 Supply and fixing of 75X63 mm dia PVC FTA 1.00 No 30.00 No 30

    11 Supply and fixing of 63X50 mm dia PVC MTA 1.00 No 30.00 No 30

    12 Add VAT charges @ 4.00% 201313 Add QC charges @ 0.50% 49214 Provision for unforeseen items 101102.41

    100000.00Limited

    WORKING ESTIMATE

    Sl.No

    Details of work Contents Rate Per Amount

  • 8/13/2019 CDP CR - BR Palli

    4/226

    Name of the sub work:Providing New Borewell at Kaminayanipalli H/o Devadoddiin Baireddypalli Mandal

    Estt.cost.Rs:1.00 lakhs

    L B D1 Drilling of 163mm dia bore well clear in all strata including

    fixing of casing pipe and coupling plug but excluding cost of

    casing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    1x1 139.00 139.00 Mts 300.00 Rmt 417002 Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    1x1 17.50 17.50 Mts 503.56 Rmt 88123 Supplying and fixing of 180mm PVC Bore cap

    1x1 -- -- -- 1 No 140.00 1no 1404 Provision towards Geological survey charges for

    selection of borewell including cost, conveyance andtransportation charges etc., complete

    1x1 -- -- -- 1 No 750.00 1No 7505 Earth work excavation and depositing on bank with initial lead and

    lift in OG soils for pipe line trench of size 0.50x0.75 including costand conveyance of all materials and labour charges and laying and

    6 jointing of 75 mm dia 6 Kg/Sqcm PVC pipes true to alignment andgradient including refilling the pipe line trench with excavated earthincluding cost and conveyance of all materials and labour chargesetc.,but excluding the cost of PVC pipes

    1x1 290.00 -- -- 290 No 68.02 1No 197267 Cost of 75 mm dia 6Kg/Sqcm PVC pipes

    1x1 290.00 -- -- 290 No 86.59 1No 25111

    8 Supply and fixing of 50 mm dia GI pipes1X1 1.50 - - 1.50 Nos 320.32 1No

    9 Supply and fixing of 50 mm dia GI Couplings1X2 - - 2.00 Nos 119.60 1No

    10 Supply and fixing of 50 mm dia GI Bend1X1 - - 1.00 Nos 109.20 1No

    11 Supply and fixing of 75X63 mm dia PVC FTA 2.00 Nos 105.00 1No1X1 - - 1.00 Nos 30.00 1No

    12 Supply and fixing of 63X50 mm dia PVC MTA1X1 - - 1.00 Nos 30.00 1No

    Provision made for GI and PVC Specials 500

    13 Add VAT charges @ 4.00% 205614 Add QC charges @ 0.50% 494

    15 Provision for unforeseen items 711Total 100000

    DETAILED ESTIMATE

    Sl.No

    Details of work NoMeasurements

    Contents Rate Per Amount

    Assistant Executive Engineer RWS&S,Baireddypalli mandal

  • 8/13/2019 CDP CR - BR Palli

    5/226

  • 8/13/2019 CDP CR - BR Palli

    6/226

    12 Provision made for GI and PVC Specials 500

    13 Add VAT charges @ 4.00% 2056 2013.0014 Add QC charges @ 0.50% 494 492.0015 Provision for unforeseen items 711

    100000 100861.61 2434.98 15

    As per Estimate 100000.26 As per Exce 2434.98As per Excution 100862 As per Less 1573.62

    -861.36 -861.36

    Asst.Executive Engineer RWS&S, Baireddypalli Mandal

  • 8/13/2019 CDP CR - BR Palli

    7/226

    CC 1st and Part

    in Baireddypalli MandalName of the Contractor: -

    Amount of Estimate : Rs 1.00 Lakhs Voucher No:

    M Book No : Covering List No:-Schedule No:-

    Up to dateSince lastcertificate

    Drilling of 163mm dia bore well clear in all strata includingfixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    138.68 Mts 300.00 Rmt 41604.00Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    17.06 Mts 503.56 Rmt 8590.731 No Supplying and fixing of 180mm PVC Bore cap 140.00 1no 140.00

    Provision towards Geological survey charges for selection of borewell including cost, conveyance and

    1 No transportation charges etc., complete 750.00 1No 750.00

    Add VAT charges @ 4% 2043.00 Add QC charges @ 0.50% 266.00

    53393.73

    Certified that the proceeding claim is correct & that the necessarymeasurements have been made by me on 2011 and recorde onpage of measurement Book No: and the work has beensatisfactorily performed.

    Certified that the materials billed for have been received and broughtto account dated

    Asstant Executive Engineer RWS & S,Baireddypalli Mandal.

    Memorandum of Payments Made

    Total value of work done Rs Ps Rs Ps Amount of previous payments from last certificate No: of

    forward with accounts for 2011.Fines and other deductions up to date

    By cash

    Payments now made By Cheque No: ofBy value of stock supplied

    total

    CONTRACT CERTIFICATE

    Name of the sub work: Providing New Borewell at Kaminayanipalli H/o devadoddi

    Quantity Executed /Supplied

    Description of the Item Rate Per

    Amount

    RemarksUp to date

    Since lastcertificate

  • 8/13/2019 CDP CR - BR Palli

    8/226

  • 8/13/2019 CDP CR - BR Palli

    9/226

  • 8/13/2019 CDP CR - BR Palli

    10/226

  • 8/13/2019 CDP CR - BR Palli

    11/226

  • 8/13/2019 CDP CR - BR Palli

    12/226

  • 8/13/2019 CDP CR - BR Palli

    13/226

  • 8/13/2019 CDP CR - BR Palli

    14/226

  • 8/13/2019 CDP CR - BR Palli

    15/226

  • 8/13/2019 CDP CR - BR Palli

    16/226

  • 8/13/2019 CDP CR - BR Palli

    17/226

  • 8/13/2019 CDP CR - BR Palli

    18/226

  • 8/13/2019 CDP CR - BR Palli

    19/226

  • 8/13/2019 CDP CR - BR Palli

    20/226

  • 8/13/2019 CDP CR - BR Palli

    21/226

  • 8/13/2019 CDP CR - BR Palli

    22/226

  • 8/13/2019 CDP CR - BR Palli

    23/226

  • 8/13/2019 CDP CR - BR Palli

    24/226

    CC 2nd and Final

    in Baireddypalli Mandal

    Name of the Contractor: -

    Amount of Estimate : Rs 1.00 Lakhs Voucher No:

    M Book No : Covering List No:-Schedule No:-

    Up to dateSince lastcertificate

    Drilling of 163mm dia bore well clear in all strata including

    fixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    138.68 Mts 300.00 Rmt 41604.00Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    17.06 Mts 503.56 Rmt 8590.731 No Supplying and fixing of 180mm PVC Bore cap 140.00 1no 140.00

    Provision towards Geological survey charges for selection of borewell including cost, conveyance and

    1 No transportation charges etc., complete 750.00 1No 750.00

    Earth work excavation and depositing on bank with initial lead andlift in OG soils for pipe line trench of size 0.50x0.75 including costand conveyance of all materials and labour charges and laying and

    jointing of 75 mm dia 6 Kg/Sqcm PVC pipes true to alignment andgradient including refilling the pipe line trench with excavated earthincluding cost and conveyance of all materials and labour charges

    300.00 Mts. etc.,but excluding the cost of PVC pipes 68.02 Rmt 20406.00 20406.00

    300.00 Mts. Cost of 75 mm dia 6Kg/Sqcm PVC pipes 86.59 Rmt 25977.00 25977.00

    1.50 Mts. Supply and fixing of 50 mm dia GI pipes 320.32 Mts. 480.48 480.482.00 No Supply and fixing of 50 mm dia GI Couplings 119.60 No 239.20 239.20

    1.00 No Supply and fixing of 50 mm dia GI Bend 109.20 No 109.20 109.201.00 No Supply and fixing of 75X63 mm dia PVC FTA 30.00 No 30.00 30.001.00 No Supply and fixing of 63X50 mm dia PVC MTA 30.00 No 30.00 30.00

    Add VAT charges @4% 2013.00 Add QC charges @ 0.50% 492.00 237.00

    100861.61 47508.88

    Rate Per

    Amount

    RemarksUp to date

    Since lastcertificate

    Total

    CONTRACT CERTIFICATE

    Name of the sub work: Providing New Borewell at Kaminayanipalli H/o devadoddi

    Quantity Executed /Supplied

    Description of the Item

  • 8/13/2019 CDP CR - BR Palli

    25/226

    Certified that the proceeding claim is correct & that the necessarymeasurements have been made by me on 2011 and recorde onpage of measurement Book No: and the work has beensatisfactorily performed.

    Certified that the materials billed for have been received and broughtto account dated

    Asstant Executive Engineer RWS & S,Palamaner Mandal.

    Memorandum of Payments Made

    Total value of work done Rs Ps Rs Ps Amount of previous payments from last certificate No: of

    forward with accounts for 2011.Fines and other deductions up to date

    By cash

    Payments now made By Cheque No: ofBy value of stock supplied

  • 8/13/2019 CDP CR - BR Palli

    26/226

  • 8/13/2019 CDP CR - BR Palli

    27/226

  • 8/13/2019 CDP CR - BR Palli

    28/226

  • 8/13/2019 CDP CR - BR Palli

    29/226

  • 8/13/2019 CDP CR - BR Palli

    30/226

  • 8/13/2019 CDP CR - BR Palli

    31/226

  • 8/13/2019 CDP CR - BR Palli

    32/226

  • 8/13/2019 CDP CR - BR Palli

    33/226

  • 8/13/2019 CDP CR - BR Palli

    34/226

  • 8/13/2019 CDP CR - BR Palli

    35/226

  • 8/13/2019 CDP CR - BR Palli

    36/226

  • 8/13/2019 CDP CR - BR Palli

    37/226

  • 8/13/2019 CDP CR - BR Palli

    38/226

  • 8/13/2019 CDP CR - BR Palli

    39/226

  • 8/13/2019 CDP CR - BR Palli

    40/226

  • 8/13/2019 CDP CR - BR Palli

    41/226

  • 8/13/2019 CDP CR - BR Palli

    42/226

  • 8/13/2019 CDP CR - BR Palli

    43/226

  • 8/13/2019 CDP CR - BR Palli

    44/226

  • 8/13/2019 CDP CR - BR Palli

    45/226

    Name of the sub work:Drilling of Borewell and Providing New Motor to ZPHS at Lakkanapalli /o Lakkanapalli in Baireddypalli Mandal

    Estt.cost.Rs:1.50 lakhs

    L B D1 Drilling of 163mm dia bore well clear in all strata including

    fixing of casing pipe and coupling plug but excluding cost of

    casing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    1x1 173.00 173.00 Mts 300.00 Rmt 519002 Supplying and fixing of 180mm dia MS casing pipe ISI Mark

    1x1 31.00 31.00 Mts 981.00 Rmt 304113 Supplying and fixing of 180mm PVC Bore cap

    1x1 -- -- -- 1 No 140.00 1no 1404 Provision towards Geological survey charges for

    selection of borewell including cost, conveyance andtransportation charges etc., complete

    1x1 -- -- -- 1 No 750.00 1No 7505 Supply and fixing of 7.5HP/19 stages SP set

    including all charges and taxes etc., complete LS 40000.00 No 40000

    6 Supply and fixing of panel board suitable to7.5HP/23 stageSubmersible pumpset with Ammeter, Voltmeter, BCH Starter,single phase preventor and fuse units fitted in the Box andKey arrangements including cost and conveyane of allmaterials and labour charges taxes etc complete 1.00 No 6448.00 No 6448

    7 Supply and fixing of Finolex make of 4.0sqmm PVC cable wire (Finolex)90.00 Mts. 91.52 Mts. 8237

    8 Transportation, errection, and testing of new SPS includinglabour charges etc., complete 1.00 No 2600.00 No 2600

    9 Provision Made for GI and PVC specials 2000

    10 Add VAT charges @ 4% 6000

    11 Add QC charges @ 0.50% 750

    12 Provision for unforeseen items 764Total 150000

    Assistant Executive Engineer

    RWS&S,Baireddypalli mandal

    DETAILED ESTIMATE

    Sl.No

    Details of work NoMeasurements

    Contents Rate Per Amount

  • 8/13/2019 CDP CR - BR Palli

    46/226

    CC 1st and part

    H/o Lakkanapalli in Baireddypalli MandalName of the Contractor: -

    Amount of Estimate : Rs 1.50 Lakhs Voucher No:

    M Book No :2012-B Covering List No:-Schedule No:-

    Up to dateSince lastcertificate

    Drilling of 163mm dia bore well clear in all strata includingfixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    172.21 Mts 300.00 Rmt 51663.00Supplying and fixing of 180mm dia MS Casing Pipe

    30.48 Mts 981.00 Rmt 29900.881 No Supplying and fixing of 180mm PVC Bore cap 140.00 1no 140.00

    Provision towards Geological survey charges for selection of borewell including cost, conveyance and

    1 No transportation charges etc., complete 750.00 1No 750.00

    Add VAT charges @ 4% 3298.00 Add QC charges @ 0.50% 429.00

    86180.88

    Certified that the proceeding claim is correct & that the necessarymeasurements have been made by me on 2011 and recorde onpage of measurement Book No: and the work has beensatisfactorily performed.

    Certified that the materials billed for have been received and broughtto account dated

    Asstant Executive Engineer RWS & S,Baireddypalli Mandal.

    Memorandum of Payments Made

    Total value of work done Rs Ps Rs Ps Amount of previous payments from last certificate No: of

    forward with accounts for 2011.Fines and other deductions up to date

    By cash

    Payments now made By Cheque No: ofBy value of stock supplied

    Up to dateSince lastcertificate

    Total

    CONTRACT CERTIFICATE

    Name of the sub work: Drilling of Borewell and Providing New Motor to ZPHS at Lakkanapalli

    Quantity Executed /Supplied

    Description of the Item Rate Per

    Amount

    Remarks

  • 8/13/2019 CDP CR - BR Palli

    47/226

  • 8/13/2019 CDP CR - BR Palli

    48/226

  • 8/13/2019 CDP CR - BR Palli

    49/226

  • 8/13/2019 CDP CR - BR Palli

    50/226

  • 8/13/2019 CDP CR - BR Palli

    51/226

  • 8/13/2019 CDP CR - BR Palli

    52/226

  • 8/13/2019 CDP CR - BR Palli

    53/226

  • 8/13/2019 CDP CR - BR Palli

    54/226

  • 8/13/2019 CDP CR - BR Palli

    55/226

  • 8/13/2019 CDP CR - BR Palli

    56/226

  • 8/13/2019 CDP CR - BR Palli

    57/226

  • 8/13/2019 CDP CR - BR Palli

    58/226

  • 8/13/2019 CDP CR - BR Palli

    59/226

  • 8/13/2019 CDP CR - BR Palli

    60/226

  • 8/13/2019 CDP CR - BR Palli

    61/226

  • 8/13/2019 CDP CR - BR Palli

    62/226

  • 8/13/2019 CDP CR - BR Palli

    63/226

    CC 1st and part

    in Baireddypalli Mandal

    Name of the Contractor: -

    Amount of Estimate : Rs 1.00 Lakhs Voucher No:

    M Book No :2018-B Covering List No:-Schedule No:-

    Up to dateSince lastcertificate

    Drilling of 163mm dia bore well clear in all strata including

    fixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    165.20 Mts 300.00 Rmt 49560.00Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    22.00 Mts 503.56 Rmt 11078.321 No Supplying and fixing of 180mm PVC Bore cap 140.00 1no 140.00

    Provision towards Geological survey charges for selection of borewell including cost, conveyance and

    1 No transportation charges etc., complete 750.00 1No 750.00

    Add VAT charges @ 4% 2461.00 Add QC charges @ 0.50% 320.00

    64309.32

    Certified that the proceeding claim is correct & that the necessarymeasurements have been made by me on 2011 and recorde onpage of measurement Book No: and the work has beensatisfactorily performed.

    Certified that the materials billed for have been received and broughtto account dated

    Asstant Executive Engineer RWS & S,Baireddypalli Mandal.

    Memorandum of Payments Made

    Total value of work done Rs Ps Rs Ps Amount of previous payments from last certificate No: of

    forward with accounts for 2011.Fines and other deductions up to date

    By cash

    Payments now made By Cheque No: of

    Per

    Amount

    RemarksUp to date

    Since lastcertificate

    Total

    CONTRACT CERTIFICATE

    Name of the sub work: Providing Borewell and Motor to Gollacheemanapalli H/o Gollacheemanapalli

    Quantity Executed /Supplied

    Description of the Item Rate

  • 8/13/2019 CDP CR - BR Palli

    64/226

    By value of stock supplied

  • 8/13/2019 CDP CR - BR Palli

    65/226

  • 8/13/2019 CDP CR - BR Palli

    66/226

  • 8/13/2019 CDP CR - BR Palli

    67/226

  • 8/13/2019 CDP CR - BR Palli

    68/226

  • 8/13/2019 CDP CR - BR Palli

    69/226

  • 8/13/2019 CDP CR - BR Palli

    70/226

  • 8/13/2019 CDP CR - BR Palli

    71/226

  • 8/13/2019 CDP CR - BR Palli

    72/226

  • 8/13/2019 CDP CR - BR Palli

    73/226

  • 8/13/2019 CDP CR - BR Palli

    74/226

  • 8/13/2019 CDP CR - BR Palli

    75/226

  • 8/13/2019 CDP CR - BR Palli

    76/226

  • 8/13/2019 CDP CR - BR Palli

    77/226

  • 8/13/2019 CDP CR - BR Palli

    78/226

  • 8/13/2019 CDP CR - BR Palli

    79/226

  • 8/13/2019 CDP CR - BR Palli

    80/226

    Name of the sub work:Drilling of Borewell and Providing New Motor to Gaddindlu H/o Lakkanapalli in Baireddypalli Mandal

    Estt.cost.Rs:1.00 lakhs

    L B D1 Drilling of 163mm dia bore well clear in all strata including

    fixing of casing pipe and coupling plug but excluding cost of

    casing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    1x1 181.00 181.00 Mts 300.00 Rmt 543002 Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    1x1 11.00 11.00 Mts 503.56 Rmt 55393 Supplying and fixing of 180mm PVC Bore cap

    1x1 -- -- -- 1 No 140.00 1no 1404 Provision towards Geological survey charges for

    selection of borewell including cost, conveyance andtransportation charges etc., complete

    1x1 -- -- -- 1 No 750.00 1No 7505 Supply and fixing of 3HP/30 stages SP set

    including all charges and taxes etc., complete LS 32000.00 No 32000

    6 Provision Made for GI and PVC specials 500

    7 Add VAT charges @ 4% 4000

    8 Add QC charges @ 0.50% 500

    9 Provision for unforeseen items 2271Total 100000

    Assistant Executive Engineer RWS&S,Baireddypalli mandal

    DETAILED ESTIMATE

    Sl.No

    Details of work NoMeasurements

    Contents Rate Per Amount

  • 8/13/2019 CDP CR - BR Palli

    81/226

    CC 1st and part

    in Baireddypalli MandalName of the Contractor: -

    Amount of Estimate : Rs 1.00 Lakhs Voucher No:

    M Book No :2012-B Covering List No:-Schedule No:-

    Up to dateSince lastcertificate

    Drilling of 163mm dia bore well clear in all strata includingfixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    181.00 Mts 300.00 Rmt 54300.00Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    10.50 Mts 503.56 Rmt 5287.381 No Supplying and fixing of 180mm PVC Bore cap 140.00 1no 140.00

    Provision towards Geological survey charges for selection of borewell including cost, conveyance and

    1 No transportation charges etc., complete 750.00 1No 750.00

    Add VAT charges @ 4% 2419.00 Add QC charges @ 0.50% 314.00

    63210.38

    Certified that the proceeding claim is correct & that the necessarymeasurements have been made by me on 2011 and recorde onpage of measurement Book No: and the work has beensatisfactorily performed.

    Certified that the materials billed for have been received and broughtto account dated

    Asstant Executive Engineer RWS & S,Baireddypalli Mandal.

    Memorandum of Payments Made

    Total value of work done Rs Ps Rs Ps Amount of previous payments from last certificate No: of

    forward with accounts for 2011.Fines and other deductions up to date

    By cash

    Payments now made By Cheque No: ofBy value of stock supplied

    CONTRACT CERTIFICATE

    Name of the sub work: Providing Borewell and New Motor to Gaddindlu H/o Lakkanapalli

    Quantity Executed /Supplied

    Description of the Item Rate Per

    Amount

    RemarksUp to date

    Since lastcertificate

    Total

  • 8/13/2019 CDP CR - BR Palli

    82/226

  • 8/13/2019 CDP CR - BR Palli

    83/226

  • 8/13/2019 CDP CR - BR Palli

    84/226

  • 8/13/2019 CDP CR - BR Palli

    85/226

  • 8/13/2019 CDP CR - BR Palli

    86/226

  • 8/13/2019 CDP CR - BR Palli

    87/226

  • 8/13/2019 CDP CR - BR Palli

    88/226

  • 8/13/2019 CDP CR - BR Palli

    89/226

  • 8/13/2019 CDP CR - BR Palli

    90/226

  • 8/13/2019 CDP CR - BR Palli

    91/226

  • 8/13/2019 CDP CR - BR Palli

    92/226

  • 8/13/2019 CDP CR - BR Palli

    93/226

  • 8/13/2019 CDP CR - BR Palli

    94/226

  • 8/13/2019 CDP CR - BR Palli

    95/226

  • 8/13/2019 CDP CR - BR Palli

    96/226

  • 8/13/2019 CDP CR - BR Palli

    97/226

  • 8/13/2019 CDP CR - BR Palli

    98/226

    Name of the sub work: Providing New Borewell and Pipeline at Chinnapuram H/o Lakkanapalli in Baireddypalli Mandal

    Grant:-CDP 2011-12 Estt.cost.Rs: 1.50 lakhs

    1 Drilling of 163mm dia bore well clear in all strata includingfixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    198.00 Mts 300.00 Rmt 59400.002 Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    12.50 Mts 503.56 Rmt 6294.503 Supplying and fixing of 180mm PVC Bore cap 1 No 140.00 1no 140.00

    4 Provision towards Geological survey charges for selection of borewell including cost, conveyance andtransportation charges etc., complete 1 No 750.00 1No 750.00

    5 Earth work excavation and depositing on bank with initial lead andlift in OG soils for pipe line trench of size 0.50x0.75 including cost

    and conveyance of all materials and labour charges and laying and jointing of 75 mm dia 6 Kg/Sqcm PVC pipes true to alignment andgradient including refilling the pipe line trench with excavated earthincluding cost and conveyance of all materials and labour chargesetc.,but excluding the cost of PVC pipes 67.00 Mts. 68.02 Rmt 4557.34

    6 Cost of 75 mm dia 6Kg/Sqcm PVC pipes 67.00 Mts. 86.59 Rmt 5801.53

    7 Supply and fixing of 50 mm dia GI pipes 25.60 Mts. 308.00 Mts. 7884.80Supply and fixing of 50 mm dia GI Couplings 9.00 Mts. 115.00 Mts. 1035.00

    8 Supply and fixing of 50 mm dia CI NR Valve 1.00 No 545.00 No 545.009 Supply and fixing of 50 mm dia GI Bend 2.00 No 105.00 No 210.00

    10 Supply and fixing of 75X63 mm dia PVC FTA 1.00 No 30.00 No 30.0011 Supply and fixing of 63X50 mm dia PVC MTA 1.00 No 30.00 No 30.0012 Supply and fixing of 75 mm dia GI Bend 1.00 No 35.00 No 35.0013 Supply and fixing of 4 Sqmm Finolex Cable wire 130.00 Mts. 88.00 Mts. 11440.00

    14 Supply and fixing of 7.5HP/19 stages SP setincluding all charges and taxes etc., complete 1.00 No 37313.00 No 37313

    15 Supply and fixing of panel board suitable to7.5HP/23 stageSubmersible pumpset with Ammeter, Voltmeter, BCH Starter,single phase preventor and fuse units fitted in the Box andKey arrangements including cost and conveyane of allmaterials and labour charges taxes etc complete 1.00 No 6200.00 No 6200

    16 Supply and fixing of 50mm Dia Clapset 1.00 No 525.00 No 525

    17 Transportation, errection, and testing of new SPS includinglabour charges etc., complete 1.00 No 2600.00 No 2600

    18 Add VAT charges @4.0% 579219 Add QC charges @ 0.50% 753

    151335.73150000.00

    Assistant Executive Engineer Baireddypalli mandal RWS&S

    WORKING ESTIMATE

    Sl.No

    Details of work Contents Rate Per Amount

    Limited

  • 8/13/2019 CDP CR - BR Palli

    99/226

    Name of the sub work: Providing New Borewell and Pipeline at Chinnapuram H/o Lakkanapalli in Baireddypalli mandal

    Item of work Excess LessAmount Amount

    1 Drilling of 163mm dia bore well clear in all strata including

    fixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete 200.00 Mts 300.00 Rmt 60000 198.00 Mts 300.00 Rmt 59400

    3 Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark25.00 Mts 503.56 Rmt 12589 12.50 Mts 503.56 Rmt 6295

    4 Supplying and fixing of 180mm PVC Bore cap1 No 140.00 1no 140 1 No 140.00 1no 140 0.00

    5 Provision towards Geological survey charges for selection of borewell including cost, conveyance andtransportation charges etc., complete 1 No 750.00 1No 750 1 No 750.00 1No 750

    6 Earth work excavation and depositing on bank with initial lead andlift in OG soils for pipe line trench of size 0.50x0.75 including costand conveyance of all materials and labour charges and laying and

    jointing of 75 mm dia 6 Kg/Sqcm PVC pipes true to alignment andgradient including refilling the pipe line trench with excavated earthincluding cost and conveyance of all materials and labour chargesetc.,but excluding the cost of PVC pipes 450.00 Mts. 68.02 Rmt 30609 67.00 Mts. 68.02 Rmt 4557

    7 Cost of 75 mm dia 6Kg/Sqcm PVC pipes 450.00 Mts. 86.59 Rmt 38966 67.00 Mts. 86.59 Rmt 5802

    8 Supply and fixing of 50 mm dia GI pipes 25.60 Mts. 308.00 Mts. 7885 7884.80

    Supply and fixing of 50 mm dia GI Couplings 9.00 No 115.00 no 1035 1035.00

    Supply and fixing of 50 mm dia CI NR Valve 1.00 No 545.00 No 545 545.009 Supply and fixing of 50 mm dia GI Bend 2.00 No 105.00 No 210 210.00

    Supply and fixing of 75X63 mm dia PVC FTA 1.00 No 30.00 No 30 30.00

    Compare t ive Cum Com plec t ion Sta tement

    Grant:-CDP 2011-12 Estt.cost.Rs: 1.50 lakhss.no As per Estimate Aa per Excution

    Quty Rate per Quty Rate per

  • 8/13/2019 CDP CR - BR Palli

    100/226

    10 Supply and fixing of 63X50 mm dia PVC MTA 1.00 No 30.00 No 30 30.00Supply and fixing of 75 mm dia GI Bend 1.00 No 35.00 No 35 35.00

    11 Supply and fixing of 4 Sqmm Finolex Cable wire 130.00 Mts. 88.00 Mts. 11440 11440.00

    Supply and fixing of 7.5HP/19 stages SP setincluding all charges and taxes etc., complete 1.00 No 37313.00 No 37313 37313.00

    Supply and fixing of panel board suitable to7.5HP/23 stageSubmersible pumpset with Ammeter, Voltmeter, BCH Starter,single phase preventor and fuse units fitted in the Box andKey arrangements including cost and conveyane of allmaterials and labour charges taxes etc complete 1.00 No 6200.00 No 6200 6200.00

    Supply and fixing of 50mm Dia Clapset 1.00 No 525.00 No 525 525.00

    Transportation, errection, and testing of new SPS includinglabour charges etc., complete 1.00 No 2600.00 No 2600 2600.00

    Provisions For GI and PVC Specials 1000

    14 Add vat charges @ 4%(72729X4%) 2909 5792 2882.65

    15 Add QC Charges @ 0.5% 750 753 2.91

    16 Provision for unforeseen items 2287150000 151335.73 70733.36 6

    As per Estimate 150000.00 As per Excess 70733.36As per Excution 151335.73 As per Less 69397.63

    -1335.73 -1335.73

    Asst.Executive Engineer RWS&S, Baireddypalli Mandal

  • 8/13/2019 CDP CR - BR Palli

    101/226

    Remarks

  • 8/13/2019 CDP CR - BR Palli

    102/226

  • 8/13/2019 CDP CR - BR Palli

    103/226

    CC 1st and Part

    in Baireddypalli MandalName of the Contractor: -

    Amount of Estimate : Rs 1.50 Lakhs Voucher No:

    M Book No : Covering List No:-Schedule No:-

    Up to dateSince lastcertificate

    Drilling of 163mm dia bore well clear in all strata includingfixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    198.00 Mts 300.00 Rmt 59400.00Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    12.50 Mts 503.56 Rmt 6294.501 No Supplying and fixing of 180mm PVC Bore cap 140.00 1no 140.00

    Provision towards Geological survey charges for selection of borewell including cost, conveyance and

    1 No transportation charges etc., complete 750.00 1No 750.00

    Add VAT charges @ 4% 2663.00 Add QC charges @ 0.50% 346.00

    69593.50

    Certified that the proceeding claim is correct & that the necessarymeasurements have been made by me on 2011 and recorde onpage of measurement Book No: and the work has beensatisfactorily performed.

    Certified that the materials billed for have been received and broughtto account dated

    Asstant Executive Engineer RWS & S,Palamaner Mandal.

    Memorandum of Payments Made

    Total value of work done Rs Ps Rs Ps Amount of previous payments from last certificate No: of

    forward with accounts for 2011.Fines and other deductions up to date

    By cash

    Payments now made By Cheque No: ofBy value of stock supplied

    Per

    Amount

    RemarksUp to date

    Since lastcertificate

    total

    CONTRACT CERTIFICATE

    Name of the sub work: Providing New Borewell and Pipeline at Chinnapuram H/o Lakkanapalli

    Quantity Executed /Supplied

    Description of the Item Rate

  • 8/13/2019 CDP CR - BR Palli

    104/226

  • 8/13/2019 CDP CR - BR Palli

    105/226

  • 8/13/2019 CDP CR - BR Palli

    106/226

  • 8/13/2019 CDP CR - BR Palli

    107/226

  • 8/13/2019 CDP CR - BR Palli

    108/226

  • 8/13/2019 CDP CR - BR Palli

    109/226

  • 8/13/2019 CDP CR - BR Palli

    110/226

  • 8/13/2019 CDP CR - BR Palli

    111/226

  • 8/13/2019 CDP CR - BR Palli

    112/226

  • 8/13/2019 CDP CR - BR Palli

    113/226

  • 8/13/2019 CDP CR - BR Palli

    114/226

  • 8/13/2019 CDP CR - BR Palli

    115/226

  • 8/13/2019 CDP CR - BR Palli

    116/226

  • 8/13/2019 CDP CR - BR Palli

    117/226

  • 8/13/2019 CDP CR - BR Palli

    118/226

  • 8/13/2019 CDP CR - BR Palli

    119/226

  • 8/13/2019 CDP CR - BR Palli

    120/226

    CC 2nd and part

    in Baireddypalli MandalName of the Contractor: -

    Amount of Estimate : Rs 1.50 Lakhs Voucher No:

    M Book No : Covering List No:-Schedule No:-

    Up to dateSince lastcertificate

    Drilling of 163mm dia bore well clear in all strata includingfixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    198.00 Mts 300.00 Rmt 59400.00Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    12.50 Mts 503.56 Rmt 6294.501 No Supplying and fixing of 180mm PVC Bore cap 140.00 1no 140.00

    Provision towards Geological survey charges for selection of borewell including cost, conveyance and

    1 No transportation charges etc., complete 750.00 1No 750.00

    Earth work excavation and depositing on bank with initial lead andlift in OG soils for pipe line trench of size 0.50x0.75 including costand conveyance of all materials and labour charges and laying and

    jointing of 75 mm dia 6 Kg/Sqcm PVC pipes true to alignment andgradient including refilling the pipe line trench with excavated earthincluding cost and conveyance of all materials and labour charges

    67.00 Mts. etc.,but excluding the cost of PVC pipes 68.02 Rmt 4557.34 4557.34

    67.00 Mts. Cost of 75 mm dia 6Kg/Sqcm PVC pipes 86.59 Rmt 5801.53 5801.53

    1.60 Mts. Supply and fixing of 50 mm dia GI pipes 308.00 Mts. 492.80 492.801.00 No Supply and fixing of 50 mm dia CI NR Valve 545.00 No 545.00 545.002.00 No Supply and fixing of 50 mm dia GI Bend 105.00 No 210.00 210.001.00 No Supply and fixing of 75X63 mm dia PVC FTA 30.00 No 30.00 30.001.00 No Supply and fixing of 63X50 mm dia PVC MTA 30.00 No 30.00 30.00

    1.00 No Supply and fixing of 75 mm dia GI Bend 35.00 No 35.00 35.0070.00 Mts. Supply and fixing of 4 Sqmm Finolex Cable wir 88.00 Mts. 6160.00 6406.40

    Add VAT charges @ 4% 3378.00 715.00 Add QC charges @ 0.50% 439.00 93.00

    88263.17 18916.07

    CONTRACT CERTIFICATE

    Name of the sub work: Providing New Borewell and Pipeline at Chinnapuram H/o Lakkanapalli

    Quantity Executed /Supplied

    Description of the Item Rate Per

    Amount

    RemarksUp to date

    Since lastcertificate

  • 8/13/2019 CDP CR - BR Palli

    121/226

    Certified that the proceeding claim is correct & that the necessarymeasurements have been made by me on 2011 and recorde onpage of measurement Book No: and the work has beensatisfactorily performed.

    Certified that the materials billed for have been received and brought

    to account dated

    Asstant Executive Engineer RWS & S,Baireddypalli Mandal.

    Memorandum of Payments Made

    Total value of work done Rs Ps Rs Ps Amount of previous payments from last certificate No: of

    forward with accounts for 2011.Fines and other deductions up to date

    By cash

    Payments now made By Cheque No: ofBy value of stock supplied

  • 8/13/2019 CDP CR - BR Palli

    122/226

  • 8/13/2019 CDP CR - BR Palli

    123/226

  • 8/13/2019 CDP CR - BR Palli

    124/226

  • 8/13/2019 CDP CR - BR Palli

    125/226

  • 8/13/2019 CDP CR - BR Palli

    126/226

  • 8/13/2019 CDP CR - BR Palli

    127/226

  • 8/13/2019 CDP CR - BR Palli

    128/226

  • 8/13/2019 CDP CR - BR Palli

    129/226

  • 8/13/2019 CDP CR - BR Palli

    130/226

  • 8/13/2019 CDP CR - BR Palli

    131/226

  • 8/13/2019 CDP CR - BR Palli

    132/226

  • 8/13/2019 CDP CR - BR Palli

    133/226

  • 8/13/2019 CDP CR - BR Palli

    134/226

  • 8/13/2019 CDP CR - BR Palli

    135/226

  • 8/13/2019 CDP CR - BR Palli

    136/226

  • 8/13/2019 CDP CR - BR Palli

    137/226

    CC 3rd and Final

    in Baireddypalli MandalName of the Contractor: -

    Amount of Estimate : Rs 1.50 Lakhs Voucher No:

    M Book No : Covering List No:-Schedule No:-

    Up to dateSince lastcertificate

    Drilling of 163mm dia bore well clear in all strata includingfixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    198.00 Mts 300.00 Rmt 59400.00Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    12.50 Mts 503.56 Rmt 6294.501 No Supplying and fixing of 180mm PVC Bore cap 140.00 1no 140.00

    Provision towards Geological survey charges for selection of borewell including cost, conveyance and

    1 No transportation charges etc., complete 750.00 1No 750.00

    Earth work excavation and depositing on bank with initial lead andlift in OG soils for pipe line trench of size 0.50x0.75 including costand conveyance of all materials and labour charges and laying and

    jointing of 75 mm dia 6 Kg/Sqcm PVC pipes true to alignment andgradient including refilling the pipe line trench with excavated earthincluding cost and conveyance of all materials and labour charges

    67.00 Mts. etc.,but excluding the cost of PVC pipes 68.02 Rmt 4557.34

    67.00 Mts. Cost of 75 mm dia 6Kg/Sqcm PVC pipes 86.59 Rmt 5801.53

    1.60 Mts. Supply and fixing of 50 mm dia GI pipes 308.00 Mts. 492.801.00 No Supply and fixing of 50 mm dia CI NR Valve 545.00 No 545.002.00 No Supply and fixing of 50 mm dia GI Bend 105.00 No 210.001.00 No Supply and fixing of 75X63 mm dia PVC FTA 30.00 No 30.001.00 No Supply and fixing of 63X50 mm dia PVC MTA 30.00 No 30.00

    1.00 No Supply and fixing of 75 mm dia GI Bend 35.00 No 35.00Supply and fixing of 4 Sqmm Finolex Cable wire

    70.00 Mts. 88.00 Mts. 6160.00 Supply and fixing of 7.5HP/19 stages SP setincluding all charges and taxes etc., complete

    1.00 No 37313.00 No 37313.00 37313.00Supply and fixing of panel board suitable to7.5HP/23 stageSubmersible pumpset with Ammeter, Voltmeter, BCH Starter,single phase preventor and fuse units fitted in the Box andKey arrangements including cost and conveyane of allmaterials and labour charges taxes etc complete

    Rate Per

    Amount

    Remarks

    CONTRACT CERTIFICATE

    Name of the sub work: Providing New Borewell and Pipeline at Chinnapuram H/o Lakkanapalli

    Quantity Executed /Supplied

    Description of the ItemUp to date

    Since lastcertificate

  • 8/13/2019 CDP CR - BR Palli

    138/226

    1.00 No 6200.00 No 6200 6200.00

    24.00 Mts. Supply and fixing of 50 mm dia GI pipes 308.00 Mts. 7392.00 7392.00

    9.00 No Supply and fixing of 50 mm dia GI Couplings 115.00 No 1035.00 1035.00

    Supply and fixing of 4 Sqmm Finolex Cable wire60.00 Mts. 88.00 Mts. 5280.00 5280.00

    1.00 No Supply and fixing of 50mm Dia Clapset 525.00 No 525.00 525.00

    Transportation, errection, and testing of new SPS including1.00 No labour charges etc., complete 2600.00 No 2600.00 2600.00

    Add VAT charges @ 4% 5792.00 2414.00 Add QC charges @ 0.50% 753.00 314.00

    151336.17 63073.00150000.00 61736.83

    Certified that the proceeding claim is correct & that the necessarymeasurements have been made by me on 2011 and recorde onpage of measurement Book No: and the work has beensatisfactorily performed.

    Certified that the materials billed for have been received and broughtto account dated

    Asstant Executive Engineer RWS & S,Baireddypalli Mandal.

    Memorandum of Payments Made

    Total value of work done Rs Ps Rs Ps Amount of previous payments from last certificate No: of

    forward with accounts for 2011.Fines and other deductions up to date

    By cash

    Payments now made By Cheque No: ofBy value of stock supplied

    Limited

  • 8/13/2019 CDP CR - BR Palli

    139/226

  • 8/13/2019 CDP CR - BR Palli

    140/226

  • 8/13/2019 CDP CR - BR Palli

    141/226

  • 8/13/2019 CDP CR - BR Palli

    142/226

  • 8/13/2019 CDP CR - BR Palli

    143/226

  • 8/13/2019 CDP CR - BR Palli

    144/226

  • 8/13/2019 CDP CR - BR Palli

    145/226

  • 8/13/2019 CDP CR - BR Palli

    146/226

  • 8/13/2019 CDP CR - BR Palli

    147/226

  • 8/13/2019 CDP CR - BR Palli

    148/226

  • 8/13/2019 CDP CR - BR Palli

    149/226

  • 8/13/2019 CDP CR - BR Palli

    150/226

  • 8/13/2019 CDP CR - BR Palli

    151/226

  • 8/13/2019 CDP CR - BR Palli

    152/226

  • 8/13/2019 CDP CR - BR Palli

    153/226

  • 8/13/2019 CDP CR - BR Palli

    154/226

  • 8/13/2019 CDP CR - BR Palli

    155/226

  • 8/13/2019 CDP CR - BR Palli

    156/226

  • 8/13/2019 CDP CR - BR Palli

    157/226

  • 8/13/2019 CDP CR - BR Palli

    158/226

  • 8/13/2019 CDP CR - BR Palli

    159/226

    Name of the sub work: Providing New sourse and drinking water facility at keelapatla mainin Gangavaram Mandal

    Grant:-CDP 2011-12 Esst cost 2.50 laksh

    1 Drilling of 163mm dia bore well clear in all strata including

    fixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete 233.00 Mts 300.00 Rmt 69900

    2 Supplying and fixing of 180mm dia 6Kg/sqcm PVC casing pipe ISI Mark23.00 Mts 497.90 Rmt 11452

    3 Supplying and fixing of 180mm PVC Bore cap 1 No 140.00 1no 1404 Provision towards Geological survey charges for

    selection of borewell including cost, conveyance andtransportation charges etc., complete 1 No 750.00 1No 750

    5 Earth work excavation and depositing on bank with initial lead and

    lift in OG soils for pipe line trench of size 0.50x0.75 including costand conveyance of all materials and labour charges and laying and

    jointing of 75 mm dia 6 Kg/Sqcm PVC pipes true to alignment andincluding cost and conveyance of all materials and labour chargesetc.,but excluding the cost of PVC pipes 126.00 Mts. 68.02 Rmt 8571

    6Cost of 75 mm dia 6Kg/Sqcm PVC pipes 126.00 Mts. 86.59 Rmt 10910

    7supply and fixing of 50mmdia GI pipes 121.80 317.24 rmt 38640

    8Supply and fixing of 50 mm dia GI (H)Couplings 24.00 No 217.80 No 5727

    9 Supply and fixing of 50 mm dia GI Bend 1.00 No 105.00 No 105

    Supply and fixing of Finolex make of 2.5sqmm PVC cable wire (Finolex)176.00 rmt 79.62 rmt 10828

    Cost of material purchased asper bill 2302 Add VAT charges @ 5% 7966

    Add QC charges @ 0.50% 796

    Total 168087work to be DoneEarth work excavation and depositing on bank with initial lead andlift in OG soils for pipe line trench of size 0.50x0.75 including costand conveyance of all materials and labour charges and laying and

    jointing of 75 mm dia 6 Kg/Sqcm PVC pipes true to alignment andincluding cost and conveyance of all materials and labour chargesetc.,but excluding the cost of PVC pipes 420.00 Mts. 81.08 Rmt 34054Cost of 75 mm dia 6Kg/Sqcm PVC pipes 420.00 Mts. 96.37 Rmt 40475

    Add VAT charges @ 5% 4096

    Add QC charges @ 0.50% 408

    Total 79033

    WORKING ESTIMATE

    Sl.No

    Details of work Contents Rate Per Amount

  • 8/13/2019 CDP CR - BR Palli

    160/226

    10 Supply and fixing of 75 mm dia PVC Gate Valve 2.00 No 150.00 No 30011 Supply and fixing of 75 mm dia PVC TEE 2.00 No 50.00 No 10012 Supply and fixing of 75 mm dia PVC Bend 2.00 No 40.00 No 8013 Supply and fixing of 75X63 mm dia PVC FTA 1.00 No 30.00 No 3014 Supply and fixing of 63X50 mm dia PVC MTA 1.00 No 30.00 No 30

    15 Supply and fixing of 7.5HP/19 stages SP setincluding all charges and taxes etc., complete 1.00 No 37585.60 No 37586

    16 Supply and fixing of panel board suitable to7.5HP/23 stageSubmersible pumpset with Ammeter, Voltmeter, BCH Starter,single phase preventor and fuse units fitted in the Box andKey arrangements including cost and conveyane of allmaterials and labour charges taxes etc complete 1.00 No 6448.00 No 6448

    1750.00 Mts. 91.52 Mts. 4576

    18 Transportation, errection, and testing of new SPS includinglabour charges etc., complete 1.00 No 2600.00 No 2600

    19 389520 742

    414919

    Assistant Executive Engineer Baireddypalli mandal RWS&S

  • 8/13/2019 CDP CR - BR Palli

    161/226

    Grant:-CDP 2011-12 Estt.cost.Rs: 1.50 lakhss.no Item of work Excess Less

    Amount Amount1 Drilling of 163mm dia bore well clear in all strata including

    fixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    233.00 Mts 300.00 Rmt 69900 233.00 Mts 300.00 Rmt 69900.00 0.002 Supplying and fixing of 180mm dia 6Kg/sqcm PVC casing pipe ISI Mark

    23.00 Mts 497.90 Rmt 11452 23.00 Mts 497.90 Rmt 11452.00 -0.303 Supplying and fixing of 180mm PVC Bore cap

    1 No 140.00 1no 140 1 No 140.00 1no 140.004 Provision towards Geological survey charges for

    selection of borewell including cost, conveyance andtransportation charges etc., complete 1 No 750.00 1No 750 1 No 750.00 1No 750.00

    5 Earth work excavation and depositing on bank with initial lead andlift in OG soils for pipe line trench of size 0.50x0.75 including costand conveyance of all materials and labour charges and laying and

    jointing of 75 mm dia 6 Kg/Sqcm PVC pipes true to alignment and

    including cost and conveyance of all materials and labour chargesetc.,but excluding the cost of PVC pipes 126.00 Mts. 68.02 Rmt 8571 126.00 Mts. 68.02 Rmt 8571.00

    6 Cost of 75 mm dia 6Kg/Sqcm PVC pipes 126.00 Mts. 86.59 Rmt 11456 126.00 Mts. 86.59 Rmt 10910.007 Supply and fixing of 50 mm dia GI pipes 96 mts 308.00 rmt 29568 121.80 Mts. 317.24 Mts. 38640.00 9072.008 Supply and fixing of 50 mm dia GI Couplings 18 no 115.00 no 2070 24.00 No 217.80 No 5227.00 3157.009 Supply and fixing of 50 mm dia GI Bend 2 no 105.00 no 210 1.00 No 105.00 No 105.00 -105.00

    10 Supply and fixing of 7/16service wire 91.00 mts 16.00 rmt 145611 Supply and fixing of 50mm dia heavy clapset 1 set 525 no 525 2.00 No 50.00 No 100.00 -425.0012 Supply and fixing of NR valve 1.00 no 545.00 no 545 2.00 No 40.00 No 80.00 -465.0013 Supply and fixing of bore cap 1 no 240.00 no 240 1.00 No 30.00 No 30.00 -210.0014 Provision for power conection charges 35000 1.00 No 30.00 No 30.00 -34970.00

    15 Supply and fixing of 7.5HP/19 stages SP setincluding all charges and taxes etc., complete LS 39407 1.00 No 37585.60 No 37585.60 -1821.40

    Quty Rate per Quty Rate per

    Comparetive Statement

    Aa per Excution

    Name of the work: Providing New Borewell and Motor at Mittapalli H/o Alapalli in Baireddypalli Mandal

    As per Estimate

  • 8/13/2019 CDP CR - BR Palli

    162/226

    16 Supply and fixing of panel board suitable to7.5HP/23 stageSubmersible pumpset with Ammeter, Voltmeter, BCH Starter,single phase preventor and fuse units fitted in the Box andKey arrangements including cost and conveyane of allmaterials and labour charges taxes etc compl 1.00 No 6200.00 No 6200 1.00 No 6448.00 No 6448.00

    17 Supply and fixing of Finolex make of 4.0sqmm PVC cable wire (Finolex)120.00 Mts. 88.00 Mts. 10560 50.00 Mts. 91.52 Mts. 4576.00

    18 Transportation, errection, and testing of new SPS including

    labour charges etc., complete 1.00 No 2500.00 No 2500 1.00 No 2600.00 No 2600.00

    provision Made For GI and PVC Specials 4664 4664.0

    19 Add VAT charges @ 4% 12500 3895.00 8605.0

    20 Add QC charges @ 0.50% 1250 742.00 508.0

    21 Provision for unforeseen items 1037250000 201781.60 -25662.40 14708

    As per Estimate 250000 As per Excess -25662.40 As per Excution -201782 As per Less -14708.70

    48218.62 -40371.10

    Asst.Executive Engineer RWS&S, Baireddypalli mandal

  • 8/13/2019 CDP CR - BR Palli

    163/226

    Remarks

  • 8/13/2019 CDP CR - BR Palli

    164/226

  • 8/13/2019 CDP CR - BR Palli

    165/226

  • 8/13/2019 CDP CR - BR Palli

    166/226

  • 8/13/2019 CDP CR - BR Palli

    167/226

  • 8/13/2019 CDP CR - BR Palli

    168/226

  • 8/13/2019 CDP CR - BR Palli

    169/226

  • 8/13/2019 CDP CR - BR Palli

    170/226

  • 8/13/2019 CDP CR - BR Palli

    171/226

  • 8/13/2019 CDP CR - BR Palli

    172/226

  • 8/13/2019 CDP CR - BR Palli

    173/226

  • 8/13/2019 CDP CR - BR Palli

    174/226

  • 8/13/2019 CDP CR - BR Palli

    175/226

  • 8/13/2019 CDP CR - BR Palli

    176/226

  • 8/13/2019 CDP CR - BR Palli

    177/226

  • 8/13/2019 CDP CR - BR Palli

    178/226

  • 8/13/2019 CDP CR - BR Palli

    179/226

  • 8/13/2019 CDP CR - BR Palli

    180/226

  • 8/13/2019 CDP CR - BR Palli

    181/226

  • 8/13/2019 CDP CR - BR Palli

    182/226

    CC 3rd and Final

    in Baireddypalli MandalName of the Contractor: -

    Amount of Estimate : Rs 1.50 Lakhs Voucher No:

    M Book No : Covering List No:-Schedule No:-

    Up to dateSince lastcertificate

    Drilling of 163mm dia bore well clear in all strata includingfixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete

    140.20 Mts 300.00 Rmt 42060.00Supplying and fixing of 180mm dia 6kg/cm2 PVC casing pipe ISI Mark

    6.40 Mts 503.56 Rmt 3222.781 No Supplying and fixing of 180mm PVC Bore c 140.00 1no 140.00

    Provision towards Geological survey charges for selection of borewell including cost, conveyance and

    1 No transportation charges etc., complete 750.00 1No 750.00

    Earth work excavation and depositing on bank with initial lead andlift in OG soils for pipe line trench of size 0.50x0.75 including costand conveyance of all materials and labour charges and laying and

    jointing of 75 mm dia 6 Kg/Sqcm PVC pipes true to alignment andgradient including refilling the pipe line trench with excavated earthincluding cost and conveyance of all materials and labour charges

    290.00 Mts. etc.,but excluding the cost of PVC pipes 68.02 Rmt 19725.80

    290.00 Mts. Cost of 75 mm dia 6Kg/Sqcm PVC pipes 86.59 Rmt 25111.10

    15.20 Mts. Supply and fixing of 50 mm dia GI pipes 308.00 Mts. 4681.605.00 No Supply and fixing of 50 mm dia GI Coupling 115.00 No 575.002.00 No Supply and fixing of 50 mm dia GI Bend 105.00 No 210.002.00 No Supply and fixing of 75 mm dia PVC Gate V 150.00 No 300.002.00 No Supply and fixing of 75 mm dia PVC TEE 50.00 No 100.00

    2.00 No Supply and fixing of 75 mm dia PVC Bend 40.00 No 80.001.00 No Supply and fixing of 75X63 mm dia PVC FT 30.00 No 30.001.00 No Supply and fixing of 63X50 mm dia PVC MT 30.00 No 30.00

    Supply and fixing of 7.5HP/19 stages SP set sr No:30014807including all charges and taxes etc., complete

    1.00 No 36140.00 No 36140.00 36140.00Supply and fixing of panel board suitable to7.5HP/19 stageSubmersible pumpset with Ammeter, Voltmeter, BCH Starter,single phase preventor and fuse units fitted in the Box andKey arrangements including cost and conveyane of all

    CONTRACT CERTIFICATE

    Name of the sub work: Providing New Borewell and Motor at Mittapalli H/o Alapalli

    Quantity Executed /Supplied

    Description of the Item Rate Per

    Amount

    RemarksUp to date

    Since lastcertificate

  • 8/13/2019 CDP CR - BR Palli

    183/226

    materials and labour charges taxes etc complete1.00 No 6200.00 No 6200.00 6200.00

    Supply and fixing of Finolex make of 4.0sqmm PVC cable wire (Finolex)50.00 Mts. 88.00 Mts. 4400.00 4400.00

    Transportation, errection, and testing of new SPS including1.00 No labour charges etc., complete 2600.00 No 2600.00 2600.00

    Add VAT charges @ 4% 5854.00 0.00 Add QC charges @ 0.50% 761.00 761.00

    152971.28 50101.00150000.00 47129.72

    Certified that the proceeding claim is correct & that the necessarymeasurements have been made by me on 2011 and recorde onpage of measurement Book No: and the work has beensatisfactorily performed.

    Certified that the materials billed for have been received and broughtto account dated

    Asstant Executive Engineer RWS & S,Baireddypalli Mandal.

    Memorandum of Payments Made

    Total value of work done Rs Ps Rs Ps Amount of previous payments from last certificate No: of

    forward with accounts for 2011.Fines and other deductions up to date

    By cash

    Payments now made By Cheque No: ofBy value of stock supplied

    Limited

  • 8/13/2019 CDP CR - BR Palli

    184/226

  • 8/13/2019 CDP CR - BR Palli

    185/226

  • 8/13/2019 CDP CR - BR Palli

    186/226

  • 8/13/2019 CDP CR - BR Palli

    187/226

  • 8/13/2019 CDP CR - BR Palli

    188/226

  • 8/13/2019 CDP CR - BR Palli

    189/226

  • 8/13/2019 CDP CR - BR Palli

    190/226

  • 8/13/2019 CDP CR - BR Palli

    191/226

  • 8/13/2019 CDP CR - BR Palli

    192/226

  • 8/13/2019 CDP CR - BR Palli

    193/226

  • 8/13/2019 CDP CR - BR Palli

    194/226

  • 8/13/2019 CDP CR - BR Palli

    195/226

  • 8/13/2019 CDP CR - BR Palli

    196/226

  • 8/13/2019 CDP CR - BR Palli

    197/226

  • 8/13/2019 CDP CR - BR Palli

    198/226

  • 8/13/2019 CDP CR - BR Palli

    199/226

  • 8/13/2019 CDP CR - BR Palli

    200/226

  • 8/13/2019 CDP CR - BR Palli

    201/226

  • 8/13/2019 CDP CR - BR Palli

    202/226

  • 8/13/2019 CDP CR - BR Palli

    203/226

  • 8/13/2019 CDP CR - BR Palli

    204/226

  • 8/13/2019 CDP CR - BR Palli

    205/226

  • 8/13/2019 CDP CR - BR Palli

    206/226

  • 8/13/2019 CDP CR - BR Palli

    207/226

  • 8/13/2019 CDP CR - BR Palli

    208/226

  • 8/13/2019 CDP CR - BR Palli

    209/226

  • 8/13/2019 CDP CR - BR Palli

    210/226

  • 8/13/2019 CDP CR - BR Palli

    211/226

  • 8/13/2019 CDP CR - BR Palli

    212/226

  • 8/13/2019 CDP CR - BR Palli

    213/226

  • 8/13/2019 CDP CR - BR Palli

    214/226

  • 8/13/2019 CDP CR - BR Palli

    215/226

  • 8/13/2019 CDP CR - BR Palli

    216/226

  • 8/13/2019 CDP CR - BR Palli

    217/226

  • 8/13/2019 CDP CR - BR Palli

    218/226

  • 8/13/2019 CDP CR - BR Palli

    219/226

  • 8/13/2019 CDP CR - BR Palli

    220/226

    CC 2nd and part

    Name of the Contractor: - Sri Vinayaka traders Chittoor

    Amount of Estimate : Rs 1.50 Lakhs Voucher No:

    M Book No :2028-B Covering List No:-Schedule No:-

    Up to dateSince lastcertificat

    e

    1.00 no Removel of old pumpset from the bore well 1050 1no 1050

    1.00 no Cost of 7.5HP/24stage submersible pumpset including all charges41710.00 1no 41710.00

    63.8 mts supply and delivary of 50mm dia GI pipes 317.24 1rmt 20239.91

    11 no supply and delivary of 50mm diaGI (H)couplings 217.80 1no 2395.80

    96 mts supply and fixing of 4.00 Sqmm finolex cable wire 119.43 1rmt 11465.28

    1 job Trasportation errection and testing of New submersible pumpset2550.00 2550.00

    Add VAT charges@5% 3791.00 Add Q [email protected]% 397.00

    Total 83598.99

    Certified that the proceeding claim is correct & that the necessary

    measurements have been made by me on 2011 and recorde onpage of measurement Book No: and the work has beensatisfactorily performed.

    Certified that the materials billed for have been received and broughtto account dated

    Asstant Engineer RWS & S,Gangavaram Mandal.

    Memorandum of Payments Made

    Total value of work done Rs Ps Rs Ps Amount of previous payments from last certificate No: of

    forward with accounts for 2011.

    Fines and other deductions up to date

    By cash

    Payments now made By Cheque No: ofBy value of stock supplied

    RemarksUp to date Since last certificate

    CONTRACT CERTIFICATE

    Name of the work:- Deeping of bore well and Providiing pump set in chandamamagundu H/o Mamadugu

    Quantity Executed / SuppliedDescription of the

    ItemRate Per

    Amount

  • 8/13/2019 CDP CR - BR Palli

    221/226

  • 8/13/2019 CDP CR - BR Palli

    222/226

    14 cost of 50mmdia GM NR valve 1.00 no 1718.10 no 1718.10 1718.10

    15 transportation errection and testing of new sps includinglabour charges 1 job 2550.00 1job 2550.00 1.00 job 2550.00 job 2550.00

    Add VAT charges @ 5% 6986 6973.00 13.0020

    Add QC charges @ 0.50% 746 735.00 11.0021

    Provision for unforeseen items 0.00150000 147731.24 9083.18 11424.00

    As per Estimate 150000 As per Exces 9083.18 As per Excution -147731 As per Less -11424.00

    2268.76 -2340.82

    Asst.Executive Engineer RWS&S, Baireddypalli mandal

  • 8/13/2019 CDP CR - BR Palli

    223/226

    Name of the sub work: Drilling of bore well and pumpset at thurlapalli S C Colony H/O thurlap in peddapanjani Mand in peddapanjani mandal

    Grant:-CDP 2011-12 Estt.cost.Rs: 1.50 lakhs

    1 Drilling of 163mm dia bore well clear in all strata includingfixing of casing pipe and coupling plug but excluding cost ofcasing pipe and coupling plug including yield test,crew chargesand cost to consumables etc.,complete 183.00 Mts 300.00 Rmt 54900

    2 Supplying and fixing of 180mm dia 6Kg/sqcm PVC casing pipe ISI Mark6.00 Mts 504.32 Rmt 3026

    3 Supplying and fixing of 180mm PVC B 1 No 140.00 1no 1404 Provision towards Geological survey charges for

    selection of borewell including cost, conveyance andtransportation charges etc., complete 1 No 750.00 1No 750

    5 supply and fixing of 50 mmdia B class 58 mts 317.24 1 rmt 18400

    6 supply and fixing of 50 mm dia(H) coup 11 no 217.80 no 2395

    7 Supply and fixing of 7.5HP/20 stages SP setincluding all charges and taxes etc., co 1.00 No 41710.00 No 41710

    8 Supply and fixing of panel board suitable to7.5HP/23 stageSubmersible pumpset with Ammeter, Voltmeter, BCH Starter,single phase preventor and fuse units fitted in the Box andKey arrangements including cost and conveyane of allmaterials and labour charges taxes etc 1.00 No 10400.00 No 10400

    9 Supply and fixing of Finolex make of 4.0sqmm PVC cable wire (Finolex)67.00 Mts. 119.43 Mts. 8002

    10 Transportation, errection, and testing of new SPS includinglabour charges etc., complete 1.00 No 2550.00 No 2550

    11 Add VAT charges @ 5% 698612 Add QC charges @ 0.50% 746

    150005

    Assistant Engineer RWS&S peddapanjani mandal

    WORKING ESTIMATE

    Sl.No Details of work Contents Rate Per Amount

  • 8/13/2019 CDP CR - BR Palli

    224/226

  • 8/13/2019 CDP CR - BR Palli

    225/226

    CC 1fist and Part

    inName of the Contractor: -

    Amount of Estimate : Rs 1.50 Lakhs Voucher No:

    M Book No : Covering List No:-Schedule No:-

    Up to dateSince lastcertificat

    e

    Flushing of the existing 163 mm dia bore wellincluding cost and conveyance of all material and

    122.00 mts all material and labour charge 100 rmt 12200

    Deepaning of the existing 163 mm dia bore wellincluding cost and conveyance of all material and

    61.00 Mts all material and labour charge 300.00 rmt 18300.00

    Removel of 5 Hp Submersible pumpset with all1 job accssories from the bore well 1050.00 1job 1050.00

    Supply anf

    Certified that the proceeding claim is correct & that the necessarymeasurements have been made by me on 2011 and recorde onpage of measurement Book No: and the work has beensatisfactorily performed.

    Certified that the materials billed for have been received and brought

    to account dated

    Asstant Engineer RWS & S,Gangavaram Mandal.

    Memorandum of Payments Made

    Total value of work done Rs Ps Rs Ps Amount of previous payments from last certificate No: of

    forward with accounts for 2011.

    RemarksUp to date Since last certificate

    CONTRACT CERTIFICATE

    Name of the sub work: Deeping and Providing pumpset in Chandamamagundu H/o Mamadugu

    Quantity Executed / SuppliedDescription of the

    ItemRate Per

    Amount

  • 8/13/2019 CDP CR - BR Palli

    226/226