MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT RODOVIA: BR-267/MG TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS) PONTOS LOCALIZADOS: CÓDIGO SNV: 267BMG0130 - 267BMG0150 DESCRIÇÃO DOS SERVIÇOS UN. 132,10 132,50 133,10 133,40 142,95 156,70 162,30 163,50 166,30 169,70 171,80 173,00 179,50 196,40 198,10 Total TERRAPLENAGEM DESM. DEST. E LIMP. AREAS ARV. D ATÉ 0,15 M 4.700,00 2.750,00 3.225,00 575,00 1.960,00 2.100,00 3.660,00 560,00 2.010,00 1.600,00 2.025,00 25.165,00 ESCAR CARGA TRANSP MAT 1A CAT. 51.100,00 55.134,63 65.000,25 966,00 11.672,50 17.757,60 43.624,00 14.638,50 11.119,50 37.194,00 308.206,98 COMPACTAÇÃO ATERROS 95% PROCTOR NORMAL 30.360,00 30.360,00 COMPACTAÇÃO ATERROS 100% PROCTOR NORMAL 45.047,50 53.235,00 9.150,00 14.064,00 11.790,00 8.730,00 142.016,50 COMPACTAÇÃO DE MATERIAL DE "BOTA FORA" 48.545,00 3.563,10 4.044,60 1.230,50 1.694,88 41.442,80 1.155,60 1.155,60 102.832,08 COMPACTAÇÃO MANUAL 840,00 840,00 RECOMPOSIÇÃO MANUAL DE ATERRO 360,00 360,00 RECOMPOSIÇÃO MECANIZADA DE ATERRO 49.979,00 20.520,00 6.480,00 3.105,00 80.084,00 PAVIMENTAÇÃO REGULARIZAÇÃO DO SUBLEITO 50,00 100,00 75,00 75,00 225,00 156,00 681,00 BASE DE BRITA GRADUADA BC 18,40 36,80 27,60 27,60 82,80 55,20 248,40 IMPRIMAÇÃO 42,00 84,00 63,00 63,00 189,00 126,00 567,00 PINTURA DE LIGAÇÃO 42,00 84,00 63,00 63,00 189,00 126,00 567,00 CBUQ - CAPA DE ROLAMENTO AC/BC t 4,80 9,60 7,20 7,20 21,60 14,40 64,80 REMOÇÃO MECANIZADA REVEST BETUMINOSO 4,00 8,00 6,00 6,00 18,00 12,00 54,00 REMOÇÃO MECANIZADA CAMADA GRANULAR PAV 16,00 32,00 24,00 24,00 72,00 48,00 216,00 CORTINA ATIRANTADA EXEC. CORT. ATIRANTADA CONC. ARM. FCK = 15MPA AC/BC 288,00 288,00 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,50 774,50 TIRANTE PROTENDIDO P/CORT AÇO ST85/105 D=32 mm m 2.360,00 2.360,00 PROTENSÃO INJEÇÃO CABO 4 CORD 12,7 mm MAC und. 73,85 73,85 PERF.DRENO SUB-HORIZONTAL MAT 1ª CAT m 1.499,16 1.499,16 PERF.DRENO SUB-HORIZONTAL MAT 2ª CAT m 810,50 810,50 DRENO SUB-HORIZONTAL - DSH 01 m 168,00 168,00 DRENAGEM E OBRAS DE ARTE CORRENTES CONCR ESTR FCK=25MPA-C.RAZ C/ADIT CONF LANC AC/BC 25,00 20,00 21,00 22,00 15,00 39,60 24,00 166,60 CORPO BSTC D=0,80 M AC/BC/PC m 8,00 10,00 8,00 26,00 BOCA BSTC D=0,80 M NORMAL AC/BC/PC unid. 1,00 1,00 1,00 3,00 VALETA PROT. CORTE REVEST. CONC. VPC 03 AC/BC m 350,00 320,00 200,00 870,00 SARJETA TRIANGULAR DE CONCRETO TIPO STC 04 AC/BC m 545,00 395,00 940,00 MEIO-FIO DE CONCRETO TIPO MFC 01 AC/BC m 300,00 220,00 250,00 20,00 100,00 80,00 30,00 40,00 95,00 100,00 1.235,00 DESCIDA D'ÁGUA TIPO RAP-CANAL RETAN-DAR 03 AC/BC m 20,00 10,00 30,00 DESCIDA D'ÁGUA ATERROS DEGRAUS-ARM-DAD02 AC/BC m 34,50 40,00 45,00 36,00 20,00 15,00 30,00 220,50 DESCIDA D'ÁGUA CORTES DEGRAUS-ARM-DCD02 AC/BC m 65,00 35,00 100,00 ENTRADA D'ÁGUA - EDA 01 AC/BC unid. 1,00 1,00 1,00 1,00 1,00 5,00 DISSIPADOR DE ENERGIA - DEB 01 AC/BC unid. 1,00 1,00 1,00 1,00 1,00 5,00 ENROCAMENTO DE PEDRA JOGADA 160,00 580,00 128,00 868,00 MURO GABIÃO CX 1,00 ALT 8X10 ZN/AL+PVC D=2,4 mm 350,00 350,00 DOBRAGEM E COLOCAÇÃO DE ARMADURA kg 625,00 500,00 525,00 550,00 375,00 990,00 600,00 4.165,00 FORMA COMUM DE MADEIRA 75,00 60,00 63,00 66,00 45,00 118,80 72,00 499,80 BUEIRO MET. S/INTER. TRAF. D=2,0M VER. EPOXY m 120,00 120,00 ENROCAMENTO DE PEDRA ARRUMADA 360,00 240,00 600,00 BARREIRA DE SEGURANÇA DUPLA DNER PRO 176/86 AC/BC m 30,00 30,00 OBRAS COMPLEMENTARES ENLEIVAMENTO 7.630,00 8.480,00 7.400,00 8.400,00 280,00 1.700,00 1.680,00 4.715,00 2.400,00 1.000,00 750,00 2.250,00 960,00 4.250,00 51.895,00 HIDROSSEMEADURA 4.500,00 5.280,00 6.720,00 8.640,00 990,00 660,00 660,00 3.600,00 3.300,00 1.650,00 1.500,00 1.485,00 2.970,00 750,00 3.960,00 46.665,00 CERCA ARAME FARPADO C/ SUPORTES DE MADEIRA m 320,00 350,00 220,00 280,00 120,00 130,00 100,00 220,00 1.740,00 km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E. km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E. km 198,1 L.E. RECUPERAÇÃO DE ATERRO E TALUDES SREMG - Unidade Local de Juiz de Fora/MG DATA BASE: Novembro/2014 Detalhamento 1 de 17

Transcript of MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350...

Page 1: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT

RODOVIA: BR-267/MG

TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP

SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS)

PONTOS LOCALIZADOS:

CÓDIGO SNV: 267BMG0130 - 267BMG0150

DESCRIÇÃO DOS SERVIÇOS UN. 132,10 132,50 133,10 133,40 142,95 156,70 162,30 163,50 166,30 169,70 171,80 173,00 179,50 196,40 198,10 Total

TERRAPLENAGEM

DESM. DEST. E LIMP. AREAS ARV. D ATÉ 0,15 M m² 4.700,00 2.750,00 3.225,00 575,00 1.960,00 2.100,00 3.660,00 560,00 2.010,00 1.600,00 2.025,00 25.165,00

ESCAR CARGA TRANSP MAT 1A CAT. m³ 51.100,00 55.134,63 65.000,25 966,00 11.672,50 17.757,60 43.624,00 14.638,50 11.119,50 37.194,00 308.206,98

COMPACTAÇÃO ATERROS 95% PROCTOR NORMAL m³ 30.360,00 30.360,00

COMPACTAÇÃO ATERROS 100% PROCTOR NORMAL m³ 45.047,50 53.235,00 9.150,00 14.064,00 11.790,00 8.730,00 142.016,50

COMPACTAÇÃO DE MATERIAL DE "BOTA FORA" m³ 48.545,00 3.563,10 4.044,60 1.230,50 1.694,88 41.442,80 1.155,60 1.155,60 102.832,08

COMPACTAÇÃO MANUAL m³ 840,00 840,00

RECOMPOSIÇÃO MANUAL DE ATERRO m³ 360,00 360,00

RECOMPOSIÇÃO MECANIZADA DE ATERRO m³ 49.979,00 20.520,00 6.480,00 3.105,00 80.084,00

PAVIMENTAÇÃO

REGULARIZAÇÃO DO SUBLEITO m² 50,00 100,00 75,00 75,00 225,00 156,00 681,00

BASE DE BRITA GRADUADA BC m³ 18,40 36,80 27,60 27,60 82,80 55,20 248,40

IMPRIMAÇÃO m² 42,00 84,00 63,00 63,00 189,00 126,00 567,00

PINTURA DE LIGAÇÃO m² 42,00 84,00 63,00 63,00 189,00 126,00 567,00

CBUQ - CAPA DE ROLAMENTO AC/BC t 4,80 9,60 7,20 7,20 21,60 14,40 64,80

REMOÇÃO MECANIZADA REVEST BETUMINOSO m³ 4,00 8,00 6,00 6,00 18,00 12,00 54,00

REMOÇÃO MECANIZADA CAMADA GRANULAR PAV m³ 16,00 32,00 24,00 24,00 72,00 48,00 216,00

CORTINA ATIRANTADA

EXEC. CORT. ATIRANTADA CONC. ARM. FCK = 15MPA AC/BC m³ 288,00 288,00

ESTACA TIPO FRANKI D-350 mm AC/BC m 774,50 774,50

TIRANTE PROTENDIDO P/CORT AÇO ST85/105 D=32 mm m 2.360,00 2.360,00

PROTENSÃO INJEÇÃO CABO 4 CORD 12,7 mm MAC und. 73,85 73,85

PERF.DRENO SUB-HORIZONTAL MAT 1ª CAT m 1.499,16 1.499,16

PERF.DRENO SUB-HORIZONTAL MAT 2ª CAT m 810,50 810,50

DRENO SUB-HORIZONTAL - DSH 01 m 168,00 168,00

DRENAGEM E OBRAS DE ARTE CORRENTES

CONCR ESTR FCK=25MPA-C.RAZ C/ADIT CONF LANC AC/BC m³ 25,00 20,00 21,00 22,00 15,00 39,60 24,00 166,60

CORPO BSTC D=0,80 M AC/BC/PC m 8,00 10,00 8,00 26,00

BOCA BSTC D=0,80 M NORMAL AC/BC/PC unid. 1,00 1,00 1,00 3,00

VALETA PROT. CORTE REVEST. CONC. VPC 03 AC/BC m 350,00 320,00 200,00 870,00

SARJETA TRIANGULAR DE CONCRETO TIPO STC 04 AC/BC m 545,00 395,00 940,00

MEIO-FIO DE CONCRETO TIPO MFC 01 AC/BC m 300,00 220,00 250,00 20,00 100,00 80,00 30,00 40,00 95,00 100,00 1.235,00

DESCIDA D'ÁGUA TIPO RAP-CANAL RETAN-DAR 03 AC/BC m 20,00 10,00 30,00

DESCIDA D'ÁGUA ATERROS DEGRAUS-ARM-DAD02 AC/BC m 34,50 40,00 45,00 36,00 20,00 15,00 30,00 220,50

DESCIDA D'ÁGUA CORTES DEGRAUS-ARM-DCD02 AC/BC m 65,00 35,00 100,00

ENTRADA D'ÁGUA - EDA 01 AC/BC unid. 1,00 1,00 1,00 1,00 1,00 5,00

DISSIPADOR DE ENERGIA - DEB 01 AC/BC unid. 1,00 1,00 1,00 1,00 1,00 5,00

ENROCAMENTO DE PEDRA JOGADA m³ 160,00 580,00 128,00 868,00

MURO GABIÃO CX 1,00 ALT 8X10 ZN/AL+PVC D=2,4 mm m³ 350,00 350,00

DOBRAGEM E COLOCAÇÃO DE ARMADURA kg 625,00 500,00 525,00 550,00 375,00 990,00 600,00 4.165,00

FORMA COMUM DE MADEIRA m² 75,00 60,00 63,00 66,00 45,00 118,80 72,00 499,80

BUEIRO MET. S/INTER. TRAF. D=2,0M VER. EPOXY m 120,00 120,00

ENROCAMENTO DE PEDRA ARRUMADA m³ 360,00 240,00 600,00

BARREIRA DE SEGURANÇA DUPLA DNER PRO 176/86 AC/BC m 30,00 30,00

OBRAS COMPLEMENTARES

ENLEIVAMENTO m² 7.630,00 8.480,00 7.400,00 8.400,00 280,00 1.700,00 1.680,00 4.715,00 2.400,00 1.000,00 750,00 2.250,00 960,00 4.250,00 51.895,00

HIDROSSEMEADURA m² 4.500,00 5.280,00 6.720,00 8.640,00 990,00 660,00 660,00 3.600,00 3.300,00 1.650,00 1.500,00 1.485,00 2.970,00 750,00 3.960,00 46.665,00

CERCA ARAME FARPADO C/ SUPORTES DE MADEIRA m 320,00 350,00 220,00 280,00 120,00 130,00 100,00 220,00 1.740,00

km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E.

km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E.

km 198,1 L.E.

RECUPERAÇÃO DE ATERRO E TALUDESSREMG - Unidade Local de Juiz de Fora/MG

DATA BASE: Novembro/2014

Detalhamento

1 de 17

Page 2: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT

RODOVIA: BR-267/MG

TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP

SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS)

CÓDIGO SNV: 267BMG0130 - 267BMG0150

ITEM CÓDIGO DESCRIÇÃO DOS SERVIÇOS UN. QUANT. PREÇO UNIT.

(R$)PREÇO UNITÁRIO (POR EXTENSO) CUSTO

1 TERRAPLENAGEM

1.1 2 S 01 000 00 DESM. DEST. E LIMP. AREAS ARV. D ATÉ 0,15 M m² 25.165,000 0,37 trinta e sete centavos 9.311,05

1.2 2 S 01 100 01 ESCAR CARGA TRANSP MAT 1A CAT DMT 50M m³ 15.410,349 1,86 um real e oitenta e seis centavos 28.663,24

1.3 2 S 01 100 25 ESCAR CARGA TRANSP MAT 1A CAT DMT 600-800M C/E m³ 1.541,035 7,20 sete reais e vinte centavos 11.095,45

1.4 2 S 01 100 32 ESCAR CARGA TRANSP MAT 1A CAT DMT 2000-3000M C/E m³ 135.611,069 10,76 e dez reais e setenta e seis centavos 1.459.175,10

1.5 2 S 01 100 33 ESCAR CARGA TRANSP MAT 1A CAT DMT 3000-5000M C/E m³ 155.644,522 14,28 quatorze reais e vinte e oito centavos 2.222.603,77

1.6 2 S 01 510 00 COMPACTAÇÃO ATERROS 95% PROCTOR NORMAL m³ 30.360,000 2,73 dois reais e setenta e três centavos 82.882,80

1.7 2 S 01 511 00 COMPACTAÇÃO ATERROS 100% PROCTOR NORMAL m³ 142.016,500 3,18 três reais e dezoito centavos 451.612,47

1.8 2 S 01 513 01 COMPACTAÇÃO DE MATERIAL DE "BOTA FORA" m³ 102.832,080 2,17 dois reais e dezessete centavos 223.145,61

1.9 2 S 03 940 00 COMPACTAÇÃO MANUAL m³ 840,000 15,36 quinze reais e trinta e seis centavos 12.902,40

1.10 3 S 08 500 00 RECOMPOSIÇÃO MANUAL DE ATERRO m³ 360,000 95,23 noventa e cinco reais e vinte e três centavos 34.282,80

1.11 3 S 08 501 00 RECOMPOSIÇÃO MECANIZADA DE ATERRO m³ 80.084,000 23,41 vinte e três reais e quarenta e um centavos 1.874.766,44

TOTAL SERVICOS DE TERRAPLENAGEM 6.410.441,13

2 PAVIMENTAÇÃO

2.1 5 S 02 110 00 REGULARIZAÇÃO DO SUBLEITO m² 681,000 0,91 noventa e um centavos 619,71

2.2 5 S 02 230 50 BASE DE BRITA GRADUADA BC m³ 248,400 158,06 cento e cinquenta e oito reais e seis centavos 39.262,10

2.3 5 S 02 300 00 IMPRIMAÇÃO m² 567,000 0,28 vinte e oito centavos 158,76

2.4 5 S 02 400 00 PINTURA DE LIGAÇÃO m² 567,000 0,19 dezenove centavos 107,73

2.5 5 S 02 540 51 CBUQ - CAPA DE ROLAMENTO AC/BC t 64,800 102,07 cento e dois reais e sete centavos 6.614,13

2.6 3 S 02 900 00 REMOÇÃO MECANIZADA REVEST BETUMINOSO m³ 54,000 11,53 onze reais e cinquenta e três centavos 622,62

2.7 3 S 02 902 00 REMOÇÃO MECANIZADA CAMADA GRANULAR PAV m³ 216,000 7,26 sete reais e vinte e seis centavos 1.568,16

TOTAL SERVICOS DE PAVIMENTAÇÃO 48.953,21

3 MATERIAL BETUMINOSO COM BONIFICAÇÃO

3.1 AQUISIÇÃO DE CAP 50/70 t 3,564 1.244,83 um mil duzentos e quarenta e quatro reais e oitenta e três centavos 4.436,57

3.2 AQUISIÇÃO DE CM-30 t 0,680 2.065,35 dois mil e sessenta e cinco reais e trinta e cinco centavos 1.405,26

3.3 AQUISIÇÃO DE RR-1C t 0,227 987,33 novecentos e oitenta e sete reais e trinta e três centavos 223,92

TOTAL SERVICOS DE MATERIAL BETUMINOSO COM BONIFICAÇÃO 6.065,75

4 TRANSPORTE DE MATERIAL BETUMINOSO

4.1 TRANSPORTE DE CAP 50/70 t 3,564 157,18 cento e cinquenta e sete reais e dezoito centavos 560,17

4.2 TRANSPORTE ASF. DILUÍDO CM-30 (P/ IMPRIM.) t 0,680 141,78 cento e quarenta e um reais e setenta e oito centavos 96,46

4.3 TRANSPORTE DE RR-1C P/ PINTURA DE LIGAÇÃO t 0,227 141,78 cento e quarenta e um reais e setenta e oito centavos 32,15

TOTAL SERVICOS DE TRANSPORTE BETUMINOSO 688,78

5 CORTINA ATIRANTADA

5.1 5 S 05 340 51 EXEC. CORT. ATIRANTADA CONC. ARM. FCK = 15MPA AC/BC m³ 288,000 1.650,75 um mil seiscentos e cinquenta reais e setenta e cinco centavos 475.416,00

5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos 183.432,58

5.3 2 S 05 900 01 TIRANTE PROTENDIDO P/CORT AÇO ST85/105 D=32 mm m 2.360,000 210,41 duzentos e dez reais e quarenta e um centavos 496.567,60

5.4 2 S 03 999 01 PROTENSÃO INJEÇÃO CABO 4 CORD 12,7 mm MAC und. 73,850 627,90 seiscentos e vinte e sete reais e noventa centavos 46.370,41

RECUPERAÇÃO DE ATERRO E TALUDESSREMG - Unidade Local de Juiz de Fora/MG

DATA BASE: Novembro/2014

PONTOS LOCALIZADOS:

km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E.

km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E.

km 198,1 L.E. QUADRO DE QUANTIDADES

2 de 17

Page 3: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT

RODOVIA: BR-267/MG

TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP

SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS)

CÓDIGO SNV: 267BMG0130 - 267BMG0150

ITEM CÓDIGO DESCRIÇÃO DOS SERVIÇOS UN. QUANT. PREÇO UNIT.

(R$)PREÇO UNITÁRIO (POR EXTENSO) CUSTO

RECUPERAÇÃO DE ATERRO E TALUDESSREMG - Unidade Local de Juiz de Fora/MG

DATA BASE: Novembro/2014

PONTOS LOCALIZADOS:

km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E.

km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E.

km 198,1 L.E. QUADRO DE QUANTIDADES

5.5 2 S 04 002 01 PERF.DRENO SUB-HORIZONTAL MAT 1ª CAT m 1.499,155 171,42 cento e setenta e um reais e quarenta e dois centavos 256.985,15

5.6 2 S 04 012 01 PERF.DRENO SUB-HORIZONTAL MAT 2ª CAT m 810,495 326,72 trezentos e vinte e seis reais e setenta e dois centavos 264.804,92

5.7 2 S 04 520 01 DRENO SUB-HORIZONTAL - DSH 01 m 168,000 62,98 sessenta e dois reais e noventa e oito centavos 10.580,64

TOTAL SERVICOS DE CORTINA ATIRANTADA 1.734.157,30

6 DRENAGEM E OBRAS DE ARTE CORRENTES

6.1 2 S 03 329 50 CONCR ESTR FCK=25MPA-C.RAZ C/ADIT CONF LANC AC/BC m³ 166,600 405,91 quatrocentos e cinco reais e noventa e um centavos 67.624,60

6.2 2 S 04 100 52 CORPO BSTC D=0,80 M AC/BC/PC m 26,000 599,78 quinhentos e noventa e nove reais e setenta e oito centavos 15.594,28

6.3 2 S 04 101 52 BOCA BSTC D=0,80 M NORMAL AC/BC/PC unid. 3,000 1.668,53 um mil seiscentos e sessenta e oito reais e cinquenta e três centavos 5.005,59

6.4 2 S 04 400 53 VALETA PROT. CORTE REVEST. CONC. VPC 03 AC/BC m 870,000 114,50 cento e quatorze reais e cinquenta centavos 99.615,00

6.5 2 S 04 900 54 SARJETA TRIANGULAR DE CONCRETO TIPO STC 04 AC/BC m 940,000 32,16 trinta e dois reais e dezesseis centavos 30.230,40

6.6 2 S 04 910 51 MEIO-FIO DE CONCRETO TIPO MFC 01 AC/BC m 1.235,000 73,48 setenta e três reais e quarenta e oito centavos 90.747,80

6.7 2 S 04 940 53 DESCIDA D'ÁGUA TIPO RAP-CANAL RETAN-DAR 03 AC/BC m 30,000 137,62 cento e trinta e sete reais e sessenta e dois centavos 4.128,60

6.8 2 S 04 941 52 DESCIDA D'ÁGUA ATERROS DEGRAUS-ARM-DAD02 AC/BC m 220,500 187,11 cento e oitenta e sete reais e onze centavos 41.257,75

6.9 2 S 04 941 82 DESCIDA D'ÁGUA CORTES DEGRAUS-ARM-DCD02 AC/BC m 100,000 188,87 cento e oitenta e oito reais e oitenta e sete centavos 18.887,00

6.10 2 S 04 942 51 ENTRADA D'ÁGUA - EDA 01 AC/BC unid. 5,000 49,62 quarenta e nove reais e sessenta e dois centavos 248,10

6.11 2 S 04 950 71 DISSIPADOR DE ENERGIA - DEB 01 AC/BC unid. 5,000 302,27 trezentos e dois reais e vinte e sete centavos 1.511,35

6.12 2 S 05 300 02 ENROCAMENTO DE PEDRA JOGADA m³ 868,000 57,74 cinquenta e sete reais e setenta e quatro centavos 50.118,32

6.13 2 S 05 302 03 MURO GABIÃO CX 1,00 ALT 8X10 ZN/AL+PVC D=2,4 mm m³ 350,000 334,32 trezentos e trinta e quatro reais e trinta e dois centavos 117.012,00

6.14 3 S 03 353 00 DOBRAGEM E COLOCAÇÃO DE ARMADURA kg 4.165,000 8,11 oito reais e onze centavos 33.778,15

6.15 3 S 03 370 00 FORMA COMUM DE MADEIRA m² 499,800 77,69 setenta e sete reais e sessenta e nove centavos 38.829,46

6.16 3 S 04 311 20 BUEIRO MET. S/INTER. TRAF. D=2,0M VER. EPOXY m 120,000 3.543,78 três mil quinhentos e quarenta e três reais e setenta e oito centavos 425.253,60

6.17 3 S 05 000 00 ENROCAMENTO DE PEDRA ARRUMADA m³ 600,000 137,04 cento e trinta e sete reais e quatro centavos 82.224,00

6.18 4 S 06 030 61 BARREIRA DE SEGURANÇA DUPLA DNER PRO 176/86 AC/BC m 30,000 375,05 trezentos e setenta e cinco reais e cinco centavos 11.251,50

TOTAL SERVICOS DE DRENAGEM E OBRAS DE ARTE CORRENTES 1.133.317,50

7 OBRAS COMPLEMENTARES

7.1 5 S 05 100 00 ENLEIVAMENTO m² 51.895,000 7,49 sete reais e quarenta e nove centavos 388.693,55

7.2 5 S 05 102 00 HIDROSSEMEADURA m² 46.665,000 1,19 um real e dezenove centavos 55.531,35

7.3 5 S 06 410 00 CERCA ARAME FARPADO C/ SUPORTES DE MADEIRA m 1.740,000 16,03 dezesseis reais e três centavos 27.892,20

TOTAL SERVICOS DE OBRAS COMPLEMENTARES 472.117,10

8 TRANSPORTES

8.1 2 S 09 002 05 TRANSPORTE LOCAL BASC. 10 M³ EM ROD. PAVIM. t.km 180.331,230 0,68 sessenta e oito centavos 122.625,23

8.2 2 S 09 002 40 TRANSPORTE LOCAL C/CARROC. 15T ROD. PAV. t.km 31.541,540 0,74 setenta e quatro centavos 23.340,73

8.3 2 S 09 002 90 TRANSPORTE COMERCIAL C/ CARROC. 15T ROD. PAV. t.km 23.553,360 0,44 quarenta e quatro centavos 10.363,47

8.4 2 S 09 002 91 TRANSP. COMERCIAL BASC. 10M³ EM ROD. PAV. t.km 344.071,040 0,46 quarenta e seis centavos 158.272,67

TOTAL SERVICOS DE TRANSPORTES 314.602,10

3 de 17

Page 4: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT

RODOVIA: BR-267/MG

TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP

SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS)

CÓDIGO SNV: 267BMG0130 - 267BMG0150

ITEM CÓDIGO DESCRIÇÃO DOS SERVIÇOS UN. QUANT. PREÇO UNIT.

(R$)PREÇO UNITÁRIO (POR EXTENSO) CUSTO

RECUPERAÇÃO DE ATERRO E TALUDESSREMG - Unidade Local de Juiz de Fora/MG

DATA BASE: Novembro/2014

PONTOS LOCALIZADOS:

km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E.

km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E.

km 198,1 L.E. QUADRO DE QUANTIDADES

9 SERVIÇOS POR ADMINISTRAÇÃO

9.1 EQUIPAMENTOS:

9.1.1 E011 RETROESCAVADEIRA h 100,000 103,85 cento e três reais e oitenta e cinco centavos 10.385,00

9.1.2 E062 ESCAVADEIRA HIDRAULICA C/ ESTEIRA h 100,000 334,79 trezentos e trinta e quatro reais e setenta e nove centavos 33.479,00

9.1.3 E400 CAMINHÃO BASCULANTE 5 M³ (8,8 t) h 100,000 106,07 cento e seis reais e sete centavos 10.607,00

9.1.4 E408 CAMINHÃO CARROCERIA (4,0 t) h 100,000 79,84 setenta e nove reais e oitenta e quatro centavos 7.984,00

9.2 MÃO DE OBRA:

9.2.1 T604 PEDREIRO h 440,000 14,02 quatorze reais e dois centavos 6.168,80

9.2.2 T701 SERVENTE h 880,000 10,11 e dez reais e onze centavos 8.896,80

TOTAL SERVICOS POR ADMINISTRACAO 77.520,60

10 INST. CANTEIRO/MOBILIZ. DESMOBILIZAÇÃO

10.1 MOBILIZAÇÃO E DESMOBILIZAÇÃO und 2,000 18.756,01 dezoito mil setecentos e cinquenta e seis reais e um centavo 37.512,01

10.2 INSTALAÇÃO DE CANTEIRO E ACAMPAMENTOS m² 174,000 306,06 trezentos e seis reais e seis centavos 53.254,74

TOTAL SERVICOS DE INST. CONTEIRO/MOBILIZ. DESMOBILIZAÇÃO 90.766,75

11 PROJETO EXECUTIVO

11.1 DETALHAMENTO E IMPRESSÃO DE PROJETO vb 1,000 112.289,08 cento e doze mil duzentos e oitenta e nove reais e oito centavos 112.289,08

TOTAL SERVICOS DE PROJETO EXECUTIVO 112.289,08

TOTAL GERAL DO ORÇAMENTO 10.400.919,30

4 de 17

Page 5: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT

RODOVIA: BR-267/MG

TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP

SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS)

PONTOS

LOCALIZADOS:

CÓDIGO SNV: 267BMG0130 - 267BMG0150

ITEM DESCRIÇÃO DOS SERVIÇOS QUANT. UND.

1 TERRAPLENAGEM 1 2 3 4 5 6 7 8 9 10 11 12

1.1 DESM. DEST. E LIMP. AREAS ARV. D ATÉ 0,15 M 25.165,000 m² 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

1.2 ESCAR CARGA TRANSP MAT 1A CAT DMT 50M 15.410,349 m³ 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

1.3 ESCAR CARGA TRANSP MAT 1A CAT DMT 600-800M C/E 1.541,035 m³ 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

1.4 ESCAR CARGA TRANSP MAT 1A CAT DMT 2000-3000M C/E 135.611,069 m³ 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

1.5 ESCAR CARGA TRANSP MAT 1A CAT DMT 3000-5000M C/E 155.644,522 m³ 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

1.6 COMPACTAÇÃO ATERROS 95% PROCTOR NORMAL 30.360,000 m³ 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

1.7 COMPACTAÇÃO ATERROS 100% PROCTOR NORMAL 142.016,500 m³ 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

1.8 COMPACTAÇÃO DE MATERIAL DE "BOTA FORA" 102.832,080 m³ 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

1.9 COMPACTAÇÃO MANUAL 840,000 m³ 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

1.10 RECOMPOSIÇÃO MANUAL DE ATERRO 360,000 m³ 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

1.11 RECOMPOSIÇÃO MECANIZADA DE ATERRO 80.084,000 m³ 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

2 PAVIMENTAÇÃO

2.1 REGULARIZAÇÃO DO SUBLEITO 681,000 m² 25,0 25,0 25,0 25,0

2.2 BASE DE BRITA GRADUADA BC 248,400 m³ 25,0 25,0 25,0 25,0

2.3 IMPRIMAÇÃO 567,000 m² 25,0 25,0 25,0 25,0

2.4 PINTURA DE LIGAÇÃO 567,000 m² 25,0 25,0 25,0 25,0

2.5 CBUQ - CAPA DE ROLAMENTO AC/BC 64,800 t 25,0 25,0 25,0 25,0

2.6 REMOÇÃO MECANIZADA REVEST BETUMINOSO 54,000 m³ 25,0 25,0 25,0 25,0

2.7 REMOÇÃO MECANIZADA CAMADA GRANULAR PAV 216,000 m³ 25,0 25,0 25,0 25,0

3 MATERIAL BETUMINOSO COM BONIFICAÇÃO

3.1 AQUISIÇÃO DE CAP 50/70 3,564 t 25,0 25,0 25,0 25,0

3.2 AQUISIÇÃO DE CM-30 0,680 t 25,0 25,0 25,0 25,0

3.3 AQUISIÇÃO DE RR-1C 0,227 t 25,0 25,0 25,0 25,0

4 TRANSPORTE DE MATERIAL BETUMINOSO

4.1 TRANSPORTE DE CAP 50/70 3,564 t 25,0 25,0 25,0 25,0

4.2 TRANSPORTE ASF. DILUÍDO CM-30 (P/ IMPRIM.) 0,680 t 25,0 25,0 25,0 25,0

4.3 TRANSPORTE DE RR-1C P/ PINTURA DE LIGAÇÃO 0,227 t 25,0 25,0 25,0 25,0

5 CORTINA ATIRANTADA

5.1 EXEC. CORT. ATIRANTADA CONC. ARM. FCK = 15MPA AC/BC 288,000 m³ 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

5.2 ESTACA TIPO FRANKI D-350 mm AC/BC 774,500 m 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

5.3 TIRANTE PROTENDIDO P/CORT AÇO ST85/105 D=32 mm 2.360,000 m 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E.

km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E.

km 198,1 L.E.

MESES (PERCENTUAL)

RECUPERAÇÃO DE ATERRO E TALUDESSREMG - Unidade Local de Juiz de Fora/MG

CRONOGRAMA FÍSICO-FINANCEIRO

DATA BASE: Novembro/2014

5 de 17

Page 6: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT

RODOVIA: BR-267/MG

TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP

SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS)

PONTOS

LOCALIZADOS:

CÓDIGO SNV: 267BMG0130 - 267BMG0150

ITEM DESCRIÇÃO DOS SERVIÇOS QUANT. UND.

km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E.

km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E.

km 198,1 L.E.

MESES (PERCENTUAL)

RECUPERAÇÃO DE ATERRO E TALUDESSREMG - Unidade Local de Juiz de Fora/MG

CRONOGRAMA FÍSICO-FINANCEIRO

DATA BASE: Novembro/2014

5.4 PROTENSÃO INJEÇÃO CABO 4 CORD 12,7 mm MAC 73,850 und. 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

5.5 PERF.DRENO SUB-HORIZONTAL MAT 1ª CAT 1.499,155 m 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

5.6 PERF.DRENO SUB-HORIZONTAL MAT 2ª CAT 810,495 m 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

5.7 DRENO SUB-HORIZONTAL - DSH 01 168,000 m 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

6 DRENAGEM E OBRAS DE ARTE CORRENTES

6.1 CONCR ESTR FCK=25MPA-C.RAZ C/ADIT CONF LANC AC/BC 166,600 m³ 20,0 20,0 20,0 20,0 20,0

6.2 CORPO BSTC D=0,80 M AC/BC/PC 26,000 m 20,0 20,0 20,0 20,0 20,0

6.3 BOCA BSTC D=0,80 M NORMAL AC/BC/PC 3,000 unid. 20,0 20,0 20,0 20,0 20,0

6.4 VALETA PROT. CORTE REVEST. CONC. VPC 03 AC/BC 870,000 m 20,0 20,0 20,0 20,0 20,0

6.5 SARJETA TRIANGULAR DE CONCRETO TIPO STC 04 AC/BC 940,000 m 20,0 20,0 20,0 20,0 20,0

6.6 MEIO-FIO DE CONCRETO TIPO MFC 01 AC/BC 1.235,000 m 20,0 20,0 20,0 20,0 20,0

6.7 DESCIDA D'ÁGUA TIPO RAP-CANAL RETAN-DAR 03 AC/BC 30,000 m 20,0 20,0 20,0 20,0 20,0

6.8 DESCIDA D'ÁGUA ATERROS DEGRAUS-ARM-DAD02 AC/BC 220,500 m 20,0 20,0 20,0 20,0 20,0

6.9 DESCIDA D'ÁGUA CORTES DEGRAUS-ARM-DCD02 AC/BC 100,000 m 20,0 20,0 20,0 20,0 20,0

6.10 ENTRADA D'ÁGUA - EDA 01 AC/BC 5,000 unid. 20,0 20,0 20,0 20,0 20,0

6.11 DISSIPADOR DE ENERGIA - DEB 01 AC/BC 5,000 unid. 20,0 20,0 20,0 20,0 20,0

6.12 ENROCAMENTO DE PEDRA JOGADA 868,000 m³ 20,0 20,0 20,0 20,0 20,0

6.13 MURO GABIÃO CX 1,00 ALT 8X10 ZN/AL+PVC D=2,4 mm 350,000 m³ 20,0 20,0 20,0 20,0 20,0

6.14 DOBRAGEM E COLOCAÇÃO DE ARMADURA 4.165,000 kg 20,0 20,0 20,0 20,0 20,0

6.15 FORMA COMUM DE MADEIRA 499,800 m² 20,0 20,0 20,0 20,0 20,0

6.16 BUEIRO MET. S/INTER. TRAF. D=2,0M VER. EPOXY 120,000 m 20,0 20,0 20,0 20,0 20,0

6.17 ENROCAMENTO DE PEDRA ARRUMADA 600,000 m³ 20,0 20,0 20,0 20,0 20,0

6.18 BARREIRA DE SEGURANÇA DUPLA DNER PRO 176/86 AC/BC 30,000 m 20,0 20,0 20,0 20,0 20,0

7 OBRAS COMPLEMENTARES

7.1 ENLEIVAMENTO 51.895,000 m² 25,0 25,0 25,0 25,0

7.2 HIDROSSEMEADURA 46.665,000 m² 25,0 25,0 25,0 25,0

7.3 CERCA ARAME FARPADO C/ SUPORTES DE MADEIRA 1.740,000 m 25,0 25,0 25,0 25,0

8 TRANSPORTES

8.1 TRANSPORTE LOCAL BASC. 10 M³ EM ROD. PAVIM. 180.331,230 t.km 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

8.2 TRANSPORTE LOCAL C/CARROC. 15T ROD. PAV. 31.541,540 t.km 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

8.3 TRANSPORTE COMERCIAL C/ CARROC. 15T ROD. PAV. 23.553,360 t.km 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

8.4 TRANSP. COMERCIAL BASC. 10M³ EM ROD. PAV. 344.071,040 t.km 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0 10,0

6 de 17

Page 7: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT

RODOVIA: BR-267/MG

TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP

SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS)

PONTOS

LOCALIZADOS:

CÓDIGO SNV: 267BMG0130 - 267BMG0150

ITEM DESCRIÇÃO DOS SERVIÇOS QUANT. UND.

km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E.

km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E.

km 198,1 L.E.

MESES (PERCENTUAL)

RECUPERAÇÃO DE ATERRO E TALUDESSREMG - Unidade Local de Juiz de Fora/MG

CRONOGRAMA FÍSICO-FINANCEIRO

DATA BASE: Novembro/2014

9 SERVIÇOS POR ADMINISTRAÇÃO

9.1 EQUIPAMENTOS:

9.1.1 RETROESCAVADEIRA 100,000 h 8,37 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33

9.1.2 ESCAVADEIRA HIDRAULICA C/ ESTEIRA 100,000 h 8,37 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33

9.1.3 CAMINHÃO BASCULANTE 5 M³ (8,8 t) 100,000 h 8,37 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33

9.1.4 CAMINHÃO CARROCERIA (4,0 t) 100,000 h 8,37 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33

9.2 MÃO DE OBRA:

9.2.1 PEDREIRO 440,000 h 8,37 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33

9.2.2 SERVENTE 880,000 h 8,37 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33 8,33

10 INST. CANTEIRO/MOBILIZ. DESMOBILIZAÇÃO

10.1 MOBILIZAÇÃO E DESMOBILIZAÇÃO 2,000 und 50,0 50,0

10.2 INSTALAÇÃO DE CANTEIRO E ACAMPAMENTOS 174,000 m² 100,0

11 PROJETO EXECUTIVO

11.1 DETALHAMENTO E IMPRESSÃO DE PROJETO 1,000 vb 30,0 30,0 40,0

Va

lor

Men

sal

11

2.1

85

,94

89

9.9

91

,18

91

1.2

20

,09

86

6.3

04

,45

1.0

92

.96

7,9

5

1.0

79

.04

1,0

2

1.0

79

.04

1,0

2

1.0

79

.04

1,0

2

1.1

97

.07

0,2

9

97

0.4

06

,79

97

0.4

06

,79

14

3.2

42

,75

Va

lor

Acu

mu

lad

o

11

2.1

85

,94

1.0

12

.17

7,1

2

1.9

23

.39

7,2

1

2.7

89

.70

1,6

6

3.8

82

.66

9,6

2

4.9

61

.71

0,6

3

6.0

40

.75

1,6

5

7.1

19

.79

2,6

7

8.3

16

.86

2,9

7

9.2

87

.26

9,7

6

10

.25

7.6

76

,55

10

.40

0.9

19

,30

7 de 17

Page 8: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MAT. QUANTIDADE QUANTID. PREÇO PREÇO * PREÇO P/

BETUMINOSO DE SERVIÇO MATERIAL R$/T QUANT. MAT. UNID.SERVIÇO

AQUISIÇÃO DE CAP 50/70 t CAP 50/70 64,80 0,0550 3,564 1.244,83 4.436,57 68,46

AQUISIÇÃO DE CM-30 m² CM-30 567,00 0,0012 0,680 2.065,35 1.405,26 2,47

AQUISIÇÃO DE RR-1C m² RR-1C 567,00 0,0004 0,227 987,33 223,93 0,39

SERVIÇO UNID. MAT. QUANTIDADE CONSUMO QUANTID. PREÇO PREÇO * PREÇO P/

BETUMINOSO DE SERVIÇO MATERIAL R$/T QUANT. MAT. UNID.SERVIÇO

TRANSPORTE DE CAP 50/70 t CAP 50/70 64,80 0,0550 3,564 157,18 560,17 8,64

TRANSPORTE ASF. DILUÍDO CM-30 (P/ IMPRIM.) m² CM-30 567,00 0,0012 0,680 141,78 96,47 0,17

TRANSPORTE DE RR-1C P/ PINTURA DE LIGAÇÃO m² RR-1C 567,00 0,0004 0,227 141,78 32,16 0,05

Observação:

A cada orçamento, o custo da aquisição e do transporte de material betuminoso é comparado entre a REDUC (Rio de Janeiro) e a FEAMIG (Belo Horizonte).

Neste orçamento, ficou mais vantajoso adquirir e consequentemente transportar os insumos a partir da FEAMIG.

QUADRO PARA CÁLCULO DO PREÇO DO MATERIAL BETUMINOSO

QUADRO PARA CÁLCULO DO MATERIAL BETUMINOSO CONFORME OF. CIRCULAR 001/02

SERVIÇO UNID. CONSUMO

8 de 17

Page 9: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

CAP-50/70 CM-30 RR-1C

3,564 64,80 t x 0,0550 t/t = 3,564 t

0,680 567,00 m² x 0,0012 t/m² = 0,680 t

RR-1C p/ Pintura de Ligação 0,227 567,00 m² x 0,0004 t/m² = 0,227 t

3,564 0,680 0,227

RODOVIA COM REVESTIMENTO ASFÁLTICO

DMT: FEAMIG até a USINA 262,00

DMT: TOTAL (Km) 262,0

TRANSPORTE DE MATERIAL BETUMINOSO (conforme IS DG/DNIT nº 02/11)

Tipo de revestimento Dist. (km)

Revestimento asfáltico 262,0

Revestimento primário 0,0

Leito natural 0,0

a b

Valores atualizados para: BDI (%) ICMS (%) nov/14 jan/09

nov/14 17,69 18,00 2,75387 2,24886

ÍNDICES fórmulas a quente a frio a quente a frio a frio

Índice de Reaj. (Pav)

(Jan/2009 – Jul/2010)R 1,22456 1,22456 1,22456 1,22456 1,22456

DMT (Km) D 262,0 262,0 0,0 0,0 0,0

A 24,715 22,244 24,715 22,244 22,244

B 0,247 0,223 0,335 0,301 0,318

C=A+B*D 89,429 80,670 24,715 22,244 22,244

Bonificação H 1,1769 1,1769 1,1769 1,1769 1,1769

ICMS I 0,82 0,82 0,82 0,82 0,82

Valor por tonelada J=C*(H/I)*R R$ 157,18 R$ 141,78 R$ 0,00 R$ 0,00 R$ 0,00

1,1769

0,82

R$ 0,00

a quente

1,22456

0,0

Custo Direto

24,715

0,354

24,715

ÍNDICE DE REAJ. (PAV) - IGP-DI (FGV)

R=a/b

jan/09 - jul/10

1,22456

REV. ASFÁLTICO REV. PRIMÁRIO LEITO NATURAL

CÁLCULO DE CONSUMO DE MATERIAL BETUMINOSO

SERVIÇO/TIPO DE MATERIAL CÁLCULOS

CBUQ

CM-30 p/ Imprimação

TOTAL

9 de 17

Page 10: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

PESO MOMENTO

(T) (T x KM) R$/T.KM SUB-TOTAL

DMT= 300 KM

A - EQUIPAMENTOS1 Usina de asfalto a quente 1 16,000 4.800,000 0,31 1.488,000

2 Carregadeira de pneus 1 8,553 2.565,900 0,31 795,429

3 Trator de pneus 1 3,093 927,900 0,31 287,649

4 Fresadora a frio 1 19,000 5.700,000 0,31 1.767,000

5 Tanques para armazenamento material betuminoso 3 5,000 4.500,000 0,31 1.395,000

6 Retroescavadeira 1 5,650 1.695,000 0,31 525,450

7 Trator de esteiras 2 7,765 4.659,000 0,31 1.444,290

8 Caldeira com barra espargidora manual 1 4,600 1.380,000 0,31 427,800

9 Rolo de pneus 1 8,200 2.460,000 0,31 762,600

10 Betoneira 1 0,800 240,000 0,31 74,400

11 Rolo compactador pé de carneiro 1 11,250 3.375,000 0,31 1.046,250

12 Rolo tandem 1 5,130 1.539,000 0,31 477,090

13 Grupo gerador 1 3,500 1.050,000 0,31 325,500

Total Equipamentos 10.816,458

BDI 17,69% 1.913,43

Total Equipamentos (jul/10) 12.729,89

Reajustamento (Terrapl.) (jul/10 - nov/14) 24,17% 3.076,67

Total (Nov/14) 15.806,56

PESO CONSUMO COMBUS-

(T) (l/km) TÍVEL

1 Veículo sedan 1 1,000 0,10 2,9321 87,96

2 Veículo utilitário 1 1,000 0,10 2,9321 87,96

3 Caminhão basculante 5m³ 3 8,800 0,31 2,3700 220,41

4 Caminhão basculante 10m³ 1 15,000 0,42 2,3700 298,62

5 Caminhão carroceria fixa 1 9,000 0,42 2,3700 298,62

6 Caminhão tanque 6.000 l 1 9,000 0,42 2,3700 298,62

Total Veículos 1.292,20

BDI 29,98% 387,40

Total Veículos + BDI (29,98%) (Sicro Nov/14) 1.679,60

Encarregado Geral 1

Chefe de Escritório 1

Encarregado de Turma 3

Motorista 8

Servente 6

Total de Pessoal 868,962

BDI 17,69% 153,72

Total de Pessoal (jul/10) 1.022,68

Reajustamento (Terrapl.) (jul/10 - nov/14) 24,17% 247,17

Total (Nov/14) 1.269,85

Total (Novembro/2014)

Fonte: Informador das Construções – julho/10

0,15 365,88

0,15 274,41

18.756,01

0,15 45,73

0,15 45,73

0,15 137,20

B - VEÍCULOS QUANT. SUB-TOTAL

C - PESSOAL QUANT.PREÇO UNITÁRIO

SUB-TOTALP / KM

VALORES REFERENCIAIS PARA MOBILIZAÇÃO E DESMOBILIZAÇÃO

ITENS EQUIPAMENTO QUANT.CUSTO

10 de 17

Page 11: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

CUSTO CUSTO ÁREA CONSUMO CUSTO

UNITÁRIO PARCIAL CANTEIRO MATERIAL MATERIAL

2 INSTALAÇÃO CANTEIRO E ACAMPAMENTO

2.1 Tábua de 2ª 2,5 cm m² 1,08 6,87 7,42 174,00 187,92 1.291,68

2.2 Pontalete de 2ª 6 cm x 6 cm m 4,90 8,48 41,55 174,00 852,60 7.230,56

2.3 Sarrafo 2,5cm x 5,0cm m 3,00 0,34 1,02 174,00 522,00 177,48

2.4 Tábua de 2ª 2,0 cm m² 4,00 13,72 54,88 174,00 696,00 9.549,12

2.5 Vigota 6x12 cm m 0,80 9,41 7,53 174,00 139,20 1.309,87

2.6 Chapa compensada 10 mm m² 1,90 22,00 41,80 174,00 330,60 7.273,20

2.7 Telha ondulada de fibrocimento 4 mm m² 1,19 8,04 9,57 174,00 207,06 1.664,76

2.8 Cumeeira de fibrocimento m 0,25 7,04 1,76 174,00 43,50 306,24

2.9 Prego 18x30 kg 0,80 7,50 6,00 174,00 139,20 1.044,00

2.10 Prego 15x15 kg 0,20 8,57 1,71 174,00 34,80 298,24

2.11 Cimento kg 26,18 0,38 9,85 174,00 4.555,32 1.714,62

2.12 Areia m³ 0,08 53,57 4,31 174,00 14,01 750,38

2.13 Brita m³ 0,10 41,50 4,34 174,00 18,18 754,59

2.14 Betoneira h 0,09 22,44 1,91 174,00 14,79 331,84

2.15 Vaso sanitário branco comum und 0,02 99,00 2,28 174,00 4,00 396,20

2.16 Lavatório funcional und 0,02 46,00 1,06 174,00 4,00 184,09

2.17 Registro de pressão und 0,03 14,85 0,43 174,00 5,05 74,93

2.18 Torneira p/ lavatório und 0,02 7,90 0,16 174,00 3,48 27,49

2.19 Tubo PVC esgoto 100 mm x 6000 mm und 0,09 58,48 5,09 174,00 15,14 885,27

2.20 Tubo PVC soldavel c/ assessórios m 0,09 1,00 0,09 174,00 15,66 15,66

2.21 Interruptor und 0,11 4,98 0,55 174,00 19,14 95,32

2.22 Tomada und 0,20 7,73 1,55 174,00 34,80 269,00

2.23 Soquete de louça und 0,04 1,44 0,06 174,00 6,96 10,02

2.24 Luminária Fluorescente 2x40w und 0,14 45,69 6,40 174,00 24,36 1.113,01

2.25 Disjuntor de 15A a 30A und 0,11 12,01 1,32 174,00 19,14 229,87

2.26 Quadro de distribuição und 0,01 13,01 0,13 174,00 1,74 22,64

2.27 Haste de aterramento c/ 1,80 m und 0,01 30,50 0,31 174,00 1,74 53,07

2.28 Fio # 2,5 mm2 m 3,80 0,01 0,04 174,00 661,20 6,61

2.29 Fio # 4,0 mm2 m 1,00 0,05 0,05 174,00 174,00 8,70

2.30 Cal hidratada kg 0,10 0,37 0,04 174,00 17,40 6,40

2.31 Pedreiro h 0,30 10,79 3,24 174,00 52,20 563,24

2.32 Carpinteiro h 1,50 10,79 16,19 174,00 261,00 2.816,19

2.33 Servente h 0,07 7,78 0,54 174,00 12,18 94,76

2.34 Eletricista h 0,07 12,38 0,87 174,00 12,18 150,79

2.35 Ajudante h 0,07 8,28 0,58 174,00 12,18 100,85

2.36 Bombeiro Hidráulico h 0,07 12,38 0,87 174,00 12,18 150,79

235,47 40.971,49

LDI 29,98% 12.283,25

53.254,74

Mês de Referência: Novembro/2014

COMP LARG. AREA(m²) R$/m² TOTAL

1 ADMINISTRAÇÃO / ENG° OBRA / FISCALIZAÇÃO 10,00 4,00 40,00 1,00 306,06 12.242,46

2 ALMOXARIFADO / LABORATÓRIO 10,00 4,00 40,00 1,00 306,06 12.242,46

3 SANITÁRIO / VESTIÁRIO 4,00 4,00 16,00 1,00 306,06 4.896,98

4 USINA DE P.M.Q. 5,00 8,00 40,00 1,00 306,06 12.242,46

5 GUARITA 2,00 1,50 3,00 1,00 306,06 918,18

6 LAVAGEM / MANUTENÇÃO 7,00 5,00 35,00 1,00 306,06 10.712,16

174,00 306,06 53.254,70 CUSTO DAS INSTALAÇÕES

TOTAL INSTALAÇÃO CANTEIRO DE OBRAS E ACAMPAMENTO

LAY-OUT DO CANTEIRO DE OBRAS

ITEM DISCRIMINAÇÃOINSTALAÇÕES

QTD.CUSTO (R$)

INSTALAÇÃO PROVISÓRIA DE CANTEIRO E ACAMPAMENTO – Valores referenciais

ITEM DISCRIMINAÇÃO UNID CONSUMO

11 de 17

Page 12: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

DMT(trecho todo) : (198,1 - 132,1) = 66,0 km DMT(trecho todo) : (198,1 - 132,1) = 66,0 km

DMT(trecho 1) : (162,5 - 132,1) = 30,4 km DMT(trecho 2) : (198,1 - 162,5) = 35,6 km

DMT(proporcional) : 30,4/66,0 = 0,4606 DMT(proporcional) : 35,6 / 66,0 = 0,5394

DMT(média poderada trecho 1 ) : (30,4 / 2) * 0,4606 = 7,0 km DMT(média poderada trecho 2 ) : (35,6 / 2) * 0,5394 = 9,6 km

Transporte Comercial Carroceira (fonecedor até canteiro)

DMT(Juiz de Fora - bueiro km 142,95): 10 + (786,4 - 783,4) + (142,95 - 118,7) = 37,25 km

DMT(Juiz de Fora - canteiro): 10 + (786,4 - 783,4) + (162,5 - 118,7) = 56,8 km

Transporte Local

DMT(grama, jazida e bota-fora): raio de 1,0 Km

Transporte Comercial Basculante

DMT(brita e filler p/ CBUQ) = 0,0 km

DMT(areia p/ CBUQ) = 0,0 km

DMT(rachão, BGS, CBUQ): (800,0 - 783,4) + (132,1 - 118,7) + ((198,1 - 132,1)/2) = 63,0 km

DMT(rachão p/ gabião - 162,3): (800,0 - 783,4) + (162,3 - 118,7) = 60,2 km

DMT(areia e brita até o canteiro): (800,0 - 783,4) + (162,5 - 118,7) = 60,4 km

Gráfico Linear de Distância de TransportesRodovia BR-267/MG

Transporte Local - (saindo do acampamento):

DMT (acampamento para trecho) : 7,0 + 9,6 = 16,6 km

Juiz de Fora

km 786,4

10,0 km Km

169,7

Areal

Km

132,1

Km

179,5

Canteiro

Km 162,5

BR-267/MG

Km

213,6

Km

163,5

Km

166,3

Km

133,1

Km

173,0

BR

-04

0/M

G

Km

142,95

Km

118,7

Km

132,5

Km

171,8

Km

133,4

Bom Jardim

de Minas

Km

196,4

Km

198,1

Km

156,7

Km

783,4

Km

800,0

Usina de CBUQ

Pedreira

Km

162,3

Page 13: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT

RODOVIA: BR-267/MG

TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP

SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS)

CÓDIGO SNV: 267BMG0130 - 267BMG0150

Serviço:

CÓDIGO DISCRIMINAÇÃO MATERIALQUANT. DE

TRABALHOUN.

PESO (T)

A TRANSP

D.M.T

(km)

MOMENTO

DE TRANSP.

3 S 08 501 RECOMPOSIÇÃO MECANIZADA DE ATERRO Mat. Jazida 80.084,00 m³ 1,8400 t/m³ 147.354,56 1,00 147.354,56

3 S 02 900 00 REMOÇÃO MECANIZADA REVEST BETUMINOSO Revest. Bet. 54,00 m³ 2,4000 t/m³ 129,60 1,00 129,60

3 S 02 902 00 REMOÇÃO MECANIZADA CAMADA GRANULAR PAV Mat. Granular 216,00 m³ 1,6000 t/m³ 345,60 1,00 345,60

5 S 05 340 51 EXEC. CORT. ATIRANTADA CONC. ARM. FCK = 15MPA AC/BC Areia 288,00 m³ 1,3950 t/m³ 401,76 16,60 6.669,21

Brita 288,00 m³ 1,2600 t/m³ 362,88 16,60 6.023,80

2 S 03 329 50 CONCR ESTR FCK=25MPA-C.RAZ C/ADIT CONF LANC AC/BC Areia 166,60 m³ 1,3050 t/m³ 217,41 16,60 3.609,05

Brita 166,60 m³ 1,2450 t/m³ 207,42 16,60 3.443,12

2 S 04 100 52 CORPO BSTC D=0,80 M AC/BC/PC Areia 26,00 m 0,2717 t/m 7,06 16,60 117,26

Brita 26,00 m 0,5256 t/m 13,67 16,60 226,84

2 S 04 101 52 BOCA BSTC D=0,80 M NORMAL AC/BC/PC Areia 3,00 und 1,5146 t/und 4,54 16,60 75,42

Brita 3,00 und 1,1085 t/und 3,33 16,60 55,20

2 S 04 400 53 VALETA PROT. CORTE REVEST. CONC. VPC 03 AC/BC Areia 870,00 m 0,1137 t/m 98,92 16,60 1.642,05

Brita 870,00 m 0,1332 t/m 115,88 16,60 1.923,67

Mat. Jazida 870,00 m 0,4800 t/m 417,60 1,00 417,60

2 S 04 900 54 SARJETA TRIANGULAR DE CONCRETO TIPO STC 04 AC/BC Mat. Jazida 940,00 m 0,2600 t/m 244,40 1,00 244,40

2 S 04 910 51 MEIO-FIO DE CONCRETO TIPO MFC 01 AC/BC Areia 1.235,00 m 0,1086 t/m 134,12 16,60 2.226,40

Brita 1.235,00 m 0,2575 t/m 318,01 16,60 5.279,00

3 S 04 311 20 BUEIRO MET. S/INTER. TRAF. D=2,0M VER. EPOXY Mat. Jazida 120,00 m 0,6816 t/m 81,79 1,00 81,79

4 S 06 030 61 BARREIRA DE SEGURANÇA DUPLA DNER PRO 176/86 AC/BC Areia 30,00 m 0,4207 t/m 12,62 16,60 209,50

Brita 30,00 m 0,5164 t/m 15,49 16,60 257,16

180.331,23

2 S 09 002 05 TRANSPORTE LOCAL BASC. 10 M³ EM ROD. PAVIM.

FATOR DE UTILIZAÇÃO

TOTAL

RECUPERAÇÃO DE ATERRO E TALUDES

SREMG - Unidade Local de Juiz de Fora/MG

DATA BASE: Novembro/2014

PONTOS LOCALIZADOS:

km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E.

km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E.

km 198,1 L.E.

Page 14: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT

RODOVIA: BR-267/MG

TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP

SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS)

CÓDIGO SNV: 267BMG0130 - 267BMG0150

Serviço:

CÓDIGO DISCRIMINAÇÃO MATERIALQUANT. DE

TRABALHOUN.

PESO (T)

A TRANSP

D.M.T

(km)

MOMENTO

DE TRANSP.

5 S 05 340 51 EXEC. CORT. ATIRANTADA CONC. ARM. FCK = 15MPA AC/BC Cimento 288,00 m³ 0,2700 t/m³ 77,76 16,60 1.290,81

Forma 288,00 m³ 0,0800 t/m³ 23,04 16,60 382,46

2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC Cimento 774,50 m 0,0340 t/m 26,33 16,60 437,12

Aço 774,50 m 0,0078 t/m 6,04 16,60 100,28

2 S 03 329 50 CONCR ESTR FCK=25MPA-C.RAZ C/ADIT CONF LANC AC/BC Cimento 166,60 m³ 0,3500 t/m³ 58,31 16,60 967,94

2 S 04 100 52 CORPO BSTC D=0,80 M AC/BC/PC Cimento 26,00 m 0,1869 t/m 4,86 16,60 80,66

Madeira 26,00 m 0,0045 t/m 0,12 16,60 1,94

Tubo 26,00 m 0,6800 t/m 17,68 16,60 293,48

2 S 04 101 52 BOCA BSTC D=0,80 M NORMAL AC/BC/PC Cimento 3,00 und 0,4974 t/und 1,49 16,60 24,77

Madeira 3,00 und 0,0293 t/und 0,09 16,60 1,45

2 S 04 400 53 VALETA PROT. CORTE REVEST. CONC. VPC 03 AC/BC Cimento 870,00 m 0,0377 t/m 32,80 16,60 544,46

Grama 870,00 m 0,0990 t/m 86,13 16,60 1.429,75

2 S 04 910 51 MEIO-FIO DE CONCRETO TIPO MFC 01 AC/BC Cimento 1.235,00 m 0,0391 t/m 48,29 16,60 801,58

3 S 03 353 00 DOBRAGEM E COLOCAÇÃO DE ARMADURA Aço 4165,00 kg 0,0011 t/kg 4,58 16,60 76,05

3 S 03 370 00 FORMA COMUM DE MADEIRA Caibro 499,80 m² 0,0034 t/m² 1,70 16,60 28,20

Tábua 499,80 m² 0,0076 t/m² 3,80 16,60 63,05

Gastalho 499,80 m² 0,0017 t/m² 0,85 16,60 14,10

4 S 06 030 61 BARREIRA DE SEGURANÇA DUPLA DNER PRO 176/86 AC/BC Cimento 30,00 m 0,1654 t/m 4,96 16,60 82,36

Madeira 30,00 m 0,0321 t/m 0,96 16,60 15,98

Aço 30,00 m 0,0026 t/m 0,08 16,60 1,29

5 S 05 100 00 ENLEIVAMENTO Grama 51.895,00 m² 0,0900 t/m² 4.670,55 5,00 23.352,75

5 S 06 410 00 CERCA ARAME FARPADO C/ SUPORTES DE MADEIRA Arame 1740,00 m 0,0002 t/m 0,35 16,60 5,77

Mourão 1740,00 m 0,0535 t/m 93,09 16,60 1.545,29

31.541,54

2 S 09 002 40 TRANSPORTE LOCAL C/CARROC. 15T ROD. PAV.

FATOR DE

UTILIZAÇÃO

TOTAL

RECUPERAÇÃO DE ATERRO E TALUDES

SREMG - Unidade Local de Juiz de Fora/MG

DATA BASE: Novembro/2014

PONTOS LOCALIZADOS:

km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E.

km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E.

km 198,1 L.E.

Page 15: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT

RODOVIA: BR-267/MG

TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP

SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS)

CÓDIGO SNV: 267BMG0130 - 267BMG0150

Serviço:

CÓDIGO DISCRIMINAÇÃO MATERIALQUANT. DE

TRABALHOUN.

PESO (T)

A TRANSP

D.M.T

(km)

MOMENTO

DE TRANSP.

5 S 05 340 51 EXEC. CORT. ATIRANTADA CONC. ARM. FCK = 15MPA AC/BC Cimento 288,00 m³ 0,2700 t/m³ 77,76 56,80 4.416,76

Forma 288,00 m³ 0,0800 t/m³ 23,04 56,80 1.308,67

2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC Cimento 774,50 m 0,0340 t/m 26,33 56,80 1.495,71

Aço 774,50 m 0,0078 t/m 0,00 56,80 0,00

2 S 03 329 50 CONCR ESTR FCK=25MPA-C.RAZ C/ADIT CONF LANC AC/BC Cimento 166,60 m³ 0,3500 t/m³ 58,31 56,80 3.312,00

2 S 04 100 52 CORPO BSTC D=0,80 M AC/BC/PC Cimento 26,00 m 0,1869 t/m 4,86 56,80 276,01

Madeira 26,00 m 0,0045 t/m 0,12 56,80 6,64

Tubo 26,00 m 0,6800 t/m 17,68 56,80 1.004,22

2 S 04 101 52 BOCA BSTC D=0,80 M NORMAL AC/BC/PC Cimento 3,00 und 0,4974 t/und 1,49 56,80 84,75

Madeira 3,00 und 0,0293 t/und 0,09 56,80 4,99

2 S 04 400 53 VALETA PROT. CORTE REVEST. CONC. VPC 03 AC/BC Cimento 870,00 m 0,0377 t/m 32,80 56,80 1.862,98

Grama 870,00 m 0,0990 t/m 86,13 56,80 4.892,18

2 S 04 910 51 MEIO-FIO DE CONCRETO TIPO MFC 01 AC/BC Cimento 1.235,00 m 0,0391 t/m 48,29 56,80 2.742,78

3 S 03 353 00 DOBRAGEM E COLOCAÇÃO DE ARMADURA Aço 4.165,00 kg 0,0011 t/kg 4,58 56,80 260,22

3 S 03 370 00 FORMA COMUM DE MADEIRA Caibro 499,80 m² 0,0034 t/m² 1,70 56,80 96,52

Tábua 499,80 m² 0,0076 t/m² 3,80 56,80 215,75

Gastalho 499,80 m² 0,0017 t/m² 0,85 56,80 48,26

3 S 04 311 20 BUEIRO MET. S/INTER. TRAF. D=2,0M VER. EPOXY Cimento 120,00 m 0,0414 t/m 4,97 37,25 185,05

Estr. Bueiro 120,00 m 0,2030 t/m 24,36 37,25 907,41

4 S 06 030 61 BARREIRA DE SEGURANÇA DUPLA DNER PRO 176/86 AC/BC Cimento 30,00 m 0,1654 t/m 4,96 56,80 281,84

Madeira 30,00 m 0,0321 t/m 0,96 56,80 54,69

Aço 30,00 m 0,0026 t/m 0,08 56,80 4,43

5 S 06 410 00 CERCA ARAME FARPADO C/ SUPORTES DE MADEIRA Arame 30,00 m 0,0002 t/m 0,01 56,80 0,34

Mourão 30,00 m 0,0535 t/m 1,61 56,80 91,16

23.553,36

2 S 09 002 90 TRANSPORTE COMERCIAL C/ CARROC. 15T ROD. PAV.

FATOR DE

UTILIZAÇÃO

TOTAL

RECUPERAÇÃO DE ATERRO E TALUDES

SREMG - Unidade Local de Juiz de Fora/MG

DATA BASE: Novembro/2014

PONTOS LOCALIZADOS:

km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E.

km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E.

km 198,1 L.E.

Page 16: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES - DNIT

RODOVIA: BR-267/MG

TRECHO: ENTR BR-116(A)/120 (LEOPOLDINA) - DIV. MG/SP

SUBTRECHO: ENTR BR-040(B) - ENTR MG-457 (BOM JARDIM DE MINAS)

CÓDIGO SNV: 267BMG0130 - 267BMG0150

Serviço:

CÓDIGO DISCRIMINAÇÃO MATERIALQUANT. DE

TRABALHOUN.

PESO (T)

A TRANSP

D.M.T

(km)

MOMENTO

DE TRANSP.

5 S 02 230 50 BASE DE BRITA GRADUADA BC BGS 248,4 m³ 2,4000 t/m³ 596,16 63,00 37.558,08

5 S 02 540 51 CBUQ - CAPA DE ROLAMENTO AC/BC Areia 64,80 t 0,0800 t/m³ 5,18 0,00 0,00

Brita 64,80 t 0,8370 t/t 54,24 0,00 0,00

CBUQ 64,80 t 1,0000 t/m³ 64,80 63,00 4.082,40

5 S 05 340 51 EXEC. CORT. ATIRANTADA CONC. ARM. FCK = 15MPA AC/BC Areia 288,00 m³ 1,3950 t/m³ 401,76 60,40 24.266,30

Brita 288,00 m³ 1,2600 t/m³ 362,88 60,40 21.917,95

2 S 03 329 50 CONCR ESTR FCK=25MPA-C.RAZ C/ADIT CONF LANC AC/BC Areia 166,60 m³ 1,3050 t/m³ 217,41 60,40 13.131,74

Brita 166,60 m³ 1,2450 t/m³ 207,42 60,40 12.527,98

2 S 04 100 52 CORPO BSTC D=0,80 M AC/BC/PC Areia 26,00 m 0,2717 t/m 7,06 60,40 426,67

Brita 26,00 m 0,5256 t/m 13,67 60,40 825,40

Rachão 26,00 m 0,1737 t/m 4,52 63,00 284,52

2 S 04 101 52 BOCA BSTC D=0,80 M NORMAL AC/BC/PC Areia 3,00 und 1,5146 t/und 4,54 60,40 274,44

Brita 3,00 und 1,1085 t/und 3,33 60,40 200,86

Rachão 3,00 und 0,9630 t/und 2,89 63,00 182,00

2 S 04 400 53 VALETA PROT. CORTE REVEST. CONC. VPC 03 AC/BC Areia 870,00 m 0,1137 t/m 98,92 60,40 5.974,70

Brita 870,00 m 0,1332 t/m 115,88 60,40 6.999,39

2 S 04 910 51 MEIO-FIO DE CONCRETO TIPO MFC 01 AC/BC Areia 1.235,00 m 0,1086 t/m 134,12 60,40 8.100,90

Brita 1.235,00 m 0,2575 t/m 318,01 60,40 19.207,95

2 S 05 300 02 ENROCAMENTO DE PEDRA JOGADA Rachão 868,00 m³ 1,5000 t/m³ 1.302,00 63,00 82.026,00

2 S 05 302 03 MURO GABIÃO CX 1,00 ALT 8X10 ZN/AL+PVC D=2,4 mm Rachão 350,00 m³ 1,7250 t/m³ 603,75 60,20 36.345,75

3 S 05 000 00 ENROCAMENTO DE PEDRA ARRUMADA Rachão 600,00 m³ 1,8000 t/m³ 1.080,00 63,00 68.040,00

4 S 06 030 61 BARREIRA DE SEGURANÇA DUPLA DNER PRO 176/86 AC/BC Areia 30,00 m 0,4207 t/m 12,62 60,40 762,30

Brita 30,00 m 0,5164 t/m 15,49 60,40 935,71

344.071,04

RECUPERAÇÃO DE ATERRO E TALUDES

SREMG - Unidade Local de Juiz de Fora/MG

DATA BASE: Novembro/2014

2 S 09 002 91 TRANSP. COMERCIAL BASC. 10M³ EM ROD. PAV.

TOTAL

FATOR DE

UTILIZAÇÃO

PONTOS LOCALIZADOS:

km 132,1 L.E. - 132,5 L.D. - 133,1 L.E. - 133,4 L.E. - 142,95 L.E.- 156,7 L.D. - 162,3 L.E.

km 163,5 L.D. - 166,3 L.E. - 169,7 L.E. - 171,8 L.D. - 173,0 L.D. - 179,5 L.D. - 196,4 L.E.

km 198,1 L.E.

Page 17: MT - DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE … · 5.2 2 S 03 401 51 ESTACA TIPO FRANKI D-350 mm AC/BC m 774,500 236,84 duzentos e trinta e seis reais e oitenta e quatro centavos

DNIT - Sistema de Custos Rodoviários Construção Rodoviária SICRO2

Custo Unitário de Referência Mês : Novembro / 2014 Minas Gerais RCTR0320

2 S 05 302 03 - Muro gabião cx1,00 alt.8X10 ZN/AL+PVC D=2,4mm Produção da Equipe : 4,50 m³ (Valores em R$)

A - Equipamento Quantidade Custo Horário

Operativa Improdutiva Operativo Improdutivo

E011 - Retroescavadeira - de pneus (56 kW) 1,00 1,00 0,00 79,90 17,81 79,90

E404 - Caminhão Basculante - 10 m3 - 15 t (210 kW) 0,05 1,00 0,00 131,82 14,49 6,59

86,49

B - Mão-de-Obra Quantidade Custo Horário

T501 - Encarregado de turma 0,50 23,1503 11,58

T604 - Pedreiro 4,00 10,7909 43,16

T701 - Servente 8,00 7,7795 62,24

116,97

20,51% 23,99

227,46

50,55

C - Material Quantidade Unidade Custo Unitário

M320 - Pregos de ferro 18x30 0,1500 kg 7,4700 1,12

M406 - Caibros de 7,5 cm x 7,5 cm 0,6000 m³ 11,7200 7,03

M415 - Tábua 2,5 x 22,5 cm 0,8000 m³ 5,1500 4,12

M710 - Pedra de mão 1,1500 m³ 72,7700 83,69

M921 - Gabião caixa 2X1X0,50m ZN/AL 0,5000 und 221,4200 110,71

206,67

E - Transporte de Materiais Toneladas / Unidade de Serviço Custo Unitário

M710 - Pedra de mão 1,7250

0,00

257,21

29,98% 77,11

334,32

Observações :

Especificação de serviço: DNER-ES-343

O transporte deve ser calculado na fase de orçamento, com as distâncias médias de transporte de cada trecho, utilizando-se as composições de momentos de transporte do SICRO 2.

As quantidades indicadas nos itens de transporte de materiais, referem-se ao consumo de materiais a serem transportados, por unidade de serviço.

Utilização Custo Operacional

Custo Horário de Equipamento

Salário -Hora

Custo Horário de Mão-de-Obra

Adc.M.O. - Ferramentas:

Custo Unitário Direto Total

Lucro e Despesas Indiretas

Preço Unitário Total

Custo Horário de Execução

Custo Unitário de Execução

Preço Unitário

Custo Total das Atividades

Preço Unitário

Custo Total de Transporte