Frederico A C Neves

10
Mexico City, 11/12 Nov 2002 Technical Aspects of the Transitional Process Frederico A C Neves <[email protected]>

description

Frederico A C Neves . Data Input. Flat file in RPSL format 3 object types (ARIN old DB) Aut-num Inetnum Person Entity is an attribute of the 2 services objects No strong “ownership” relation between service objects. LacNIC Objects. Entity Block (inetnum) - PowerPoint PPT Presentation

Transcript of Frederico A C Neves

Page 1: Frederico A C Neves

Mexico City, 11/12 Nov 2002

Technical Aspects of the Transitional Process

Frederico A C Neves<[email protected]>

Page 2: Frederico A C Neves

Mexico City, 11/12 Nov 2002

Technical Aspects of the Transitional Process

Data Input• Flat file in RPSL format• 3 object types (ARIN old DB)

– Aut-num– Inetnum– Person

• Entity is an attribute of the 2 services objects• No strong “ownership” relation between

service objects

Page 3: Frederico A C Neves

Mexico City, 11/12 Nov 2002

Technical Aspects of the Transitional Process

LacNIC Objects• Entity• Block (inetnum)• ASN (aut-num)• Person

Page 4: Frederico A C Neves

Mexico City, 11/12 Nov 2002

Technical Aspects of the Transitional Process

Objects relation

Entity

ASNBlock

Person1

NN

21

1 1

Page 5: Frederico A C Neves

Mexico City, 11/12 Nov 2002

Technical Aspects of the Transitional Process

Data Manipulation• Two temporary object (OldEnt and OldId) were created to import

the data• During the import an algorithm cleaned up the “owner” name and

compared them between the 2 services objects. The cross relation was got from these information. Name clashes were treated by manual processing.

• The adopted transition schema provides only full whois and reverse publication services until the update of the information is made.

• Block boundaries were adjusted to prefixes.• Represented reverse delegation on the Whois were adjusted to

prefixes and represent exactly the requested reverse delegation.

Page 6: Frederico A C Neves

Mexico City, 11/12 Nov 2002

Technical Aspects of the Transitional Process

Migration / Verification• The process took 2 weeks between the arrival

of the first dump and the take over of the reverse zone file generation and publication

• After the final import the data was verified by independent reverse publication(ARIN and LacNIC) and objects count.

Page 7: Frederico A C Neves

Mexico City, 11/12 Nov 2002

Technical Aspects of the Transitional Process

Transition Schema• To update the data the customer need to contact RSG.• The customer receives a password and could update the

information directly on the system.• During the update the “owner” data is imported in a final object

and the customer receives full services directly on the system interface.

• The adopted policy to provide smooth transition is:– Customer is allowed to update the data on request– Customer is obligated to update the information during new

allocation.• So far we have 10% of the database updated.

Page 8: Frederico A C Neves

Mexico City, 11/12 Nov 2002

Technical Aspects of the Transitional Process

Data Protection• Database replicated online. • Read load separated from master database• Two full flat file backups during the day• One daily copy on tape to a safe• External online replication

Page 9: Frederico A C Neves

Mexico City, 11/12 Nov 2002

Technical Aspects of the Transitional Process

Database Replication / Flow Schema

Master DB

Read Load DB

Ext.BackupDBBackup DB

RSGApplications

User AdminApplications Whois Zone File

Generation

Application Data Flow

Online ReplicationData Flow

Page 10: Frederico A C Neves

Mexico City, 11/12 Nov 2002

Technical Aspects of the Transitional Process

Questions

?