Avaliação Energética do Sistema Interligado NacionalOUTROS FATOS RELEVANTES •Continuam...
Transcript of Avaliação Energética do Sistema Interligado NacionalOUTROS FATOS RELEVANTES •Continuam...
-
Avaliação Energéticado
Sistema Interligado Nacional
Outubro de 2008
DGT/SPO/DPLE
-
N
SE
NE
S
BOA
REGULAR
RUIM
SITUAÇÃO ENERGÉTICA DO SIN
EAR = 45,3%CON = 29%ENA = 57%
EAR DO DIA 03 de Outubro/08CAR ARMAZENAMENTO AO FINAL DO MÊSENA ACUMULADA NO MÊS ATÉ O DIA 03/10/08
EAR = 54,1%CAR = 22%ENA = 65%
EAR = 57,3%CAR = 43%ENA = 94%
EAR = 53%CAR = 16%ENA = 52%
Situação
-
N
SE
NE
BOA
REGULAR
RUIM
BALANÇO ENERGÉTICO DO SIN
859
1.320
2.179681
4.4064.410
ITAIPU 60 Hz
ITAIPU 50 Hz
CARGA = 3.780GHID = 2.921
GTER = 0 PLD = 100,52
CARGA = 7.756GHID = 5.645
GTER = 90GEOL= 21
PLD = 100,52
CARGA = 31.872GHID = 20.644GNUC = 1.844GTER = 2.688PLD = 100,52
CARGA = 8.283GHID = 7.013GTER = 646GEOL = 87
PLD = 100,52
EXPORTAÇÃO
531
5.151
• VALORES MÉDIOS (MWmed) OBSERVADOS NO PERÍODO DE 27/Set a 03/Out.
• PLD MÉDIO (R$/MWh) - SEMANA DE 27/Set a 03/Out.
6
S
-
Carga8.283 MWmed
BALANÇO ENERGÉTICO DA REGIÃO SUL
ENA = 52 % MLT(6.360 MWmed)acumulado no
mês até dia 03/10
EAR = 53,0% VU(9.770 MWmês)
Dia 03 de Outubro/08
Ger. Hidráulica7.013 MWmed
Ger. Térmica646 MWmed
Interc. SE/S6 MWmed
ANDE0 MWmed
Argentina531 MWmed
Uruguai0 MWmed
Recurso Requisito
Valores médios observados no período de 27/09/08 a 03/10/08
Ger. Eólica87 MWmed
-
IGUAÇU52,0
XX%
XX%
ENERGIA ARMAZENADA
PARTICIPAÇÃO NO SUL
50,2
1,9
OUTRAS SUL
JACUÍ23,3 71,2
URUGUAI22,8 47,1
ENERGIA ARMAZENADA - REGIÃO SUL
03/10/2008
-
TRANSFERÊNCIA DE ENERGIA ENTRE REGIÕES
Valores previstos para a semana de 04/10 a 10/10
-
PREVISÃO CLIMÁTICA
Fonte: CPTEC/INPE
-
PREVISÃO CLIMÁTICA
Fonte: SIMEPAR
-
ENERGIA ARMAZENADA DA REGIÃO SUDESTE
0,0
10,020,0
30,0
40,0
50,060,0
70,0
80,090,0
100,0
jan fev mar abr mai jun jul ago set out nov dezArmazenamentos no final do mês
EA
R (
%)
2003 2004 2005 2006 2007 2008
CAR 2008 / 2009
51,9 % Valor esperado – PMO Out/08 Rev. 01
-
ENERGIA ARMAZENADA DA REGIÃO SUDESTE
0,010,0
20,030,040,050,0
60,070,0
80,0
90,0100,0
jan fev mar abr mai jun jul ago set out nov dezArmazenamentos no final do mês
EA
R (
%)
2003 2004 2005 2006 2007 2008
CAR 2008 / 2009
51,9 % Valor esperado – PMO Out/08 Rev. 01 Estudo Prospectivo ONS
ENA (%Mlt)Nov97
-
ENERGIA ARMAZENADA DA REGIÃO SUL
0,010,020,030,040,050,060,070,080,090,0
100,0
jan fev mar abr mai jun jul ago set out nov dezArmazenamentos no final do mês
EA
R (
%)
2003 2004 2005 2006 2007 2008
CAR 2008 / 2009
57,7% Valor esperado – PMO Out/08 Rev. 01
-
ENERGIA ARMAZENADA DA REGIÃO SUL
0,010,020,030,040,050,060,070,080,090,0
100,0
jan fev mar abr mai jun jul ago set out nov dezArmazenamentos no final do mês
EA
R (%
)
2003 2004 2005 2006 2007 2008
CAR 2008 / 2009
57,7% Valor esperado – PMO Out/08 Rev. 01
Estudo Prospectivo ONSENA (%Mlt)
Nov91
-
ENERGIA ARMAZENADA DA REGIÃO NORDESTE
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
jan fev mar abr mai jun jul ago set out nov dezArmazenamentos no final do mês
EA
R (%
)
2003 2004 2005 2006 2007 2008
CAR 2008 / 200942,0% Valor
esperado – PMO Ou/08 Rev. 01
-
ENERGIA ARMAZENADA DA REGIÃO NORDESTE
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
jan fev mar abr mai jun jul ago set out nov dezArmazenamentos no final do mês
EA
R (%
)
2003 2004 2005 2006 2007 2008
CAR 2008 / 200942,0% Valor esperado – PMO Out/08 Rev. 01
Estudo Prospectivo do ONSENA (% mlt)
Nov65
-
ENERGIA ARMAZENADA DA REGIÃO NORTE
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
jan fev mar abr mai jun jul ago set out nov dezArmazenamentos no final do mês
EA
R (%
)
2003 2004 2005 2006 2007 2008
CON 2008
33,4% Valor esperado – PMO Out/08 Rev. 01
-
ENERGIA ARMAZENADA DA REGIÃO NORTE
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
jan fev mar abr mai jun jul ago set out nov dezArmazenamentos no final do mês
EA
R (%
)
2003 2004 2005 2006 2007 2008
CON 2008
33,4% Valor esperado – PMO Out/08 Rev. 01
Estudo Prospectivo do ONSENA (% mlt)
Nov74
-
DECISÃO TÉRMICA DO SIN
Outubro 2008 - Semana 2
Mérito34%
GE15%
Gfom/Gsub6%
N. Desp.14%
Inflex.31%
Disp. total do SIN = 8820MW *
1234 MW
506 MW
1300 MW
2768 MW*
3090 MW*
* Valores previstos no deck do Decomp
-
OUTROS FATOS RELEVANTES
• Continuam despachadas térmicas a carvão e gás, não indicadas para despacho por ordem de mérito, de acordo com a determinação do CMSE. O Custo acumulado até30/09 é de 2,3 bilhões de reais, aproximadamente.
• Teve início em 24/05/2008 a exportação, em caráter excepcional, de energia de origem hidrelétrica do subsistema SE/CO para o sistema elétrico argentino. A Resolução CNPE Nº 5, de 17/06/08, estendeu ao Uruguai este tipo de suprimento. O fornecimento total de energia nesta modalidade estará limitado a 500 MWmed, sendo efetivado no período de maio a agosto de 2008, e compensado obrigatoriamente pelo sistema elétrico argentino no período de setembro a novembro/2008.
-
Exportação p/ Argentina
114
358 428 418 434517 493
-405
-1299
-184
425 416
115
-61
-619
-388
0 0
354
463
330
757
478 411
518
291
00
-1400
-1200
-1000
-800
-600
-400
-200
0
200
400
600
800
1000
1200
16-mai 23-mai 30-mai 6-jun 13-jun 20-jun 27-jun 4-jul 11-jul 18-jul 25-jul 01-ago 08-ago 15-ago 22-ago 29-ago 05-set 12-set 19-set
Ger. Térmica a partir de 10/mai
Ger. Hidráulica a partir de 21/mai
354 577 688 1185 896 845 1035 784 -405 -1299 -184 425 416 115 -61 -619
MaioMaio JunhoJunho JulhoJulho AgostoAgosto
Dados verificados até 19/09/2009
Saldo para devolução:7,95%
do montante exportado
SetembroSetembro
Devolução de Energia a partir de 09/07
-388
613,52 527,36 687,71 709,97 661,80 625,32 627,41 635,47 - - - - - - - - - - - -
- 34,04 50,52 76,20 76,20 70,41 76,83 88,21 91,37 102,64 110,35 146,30 138,69 118,13 79,16 71,64 93,55 106,10 119,11 121,65
Custo da Exportação (R$/MWh)
Fonte: ONS
-
Exportação p/ Uruguai
21
0 0
9
25
20
0 00
5
10
15
20
25
30
19-jul a 25/jul 26-jul a 01/ago 02-ago a 08/ago 09-ago a 15/ago 16-ago a 22/ago 23-ago a 29/ago 30-ago a 05/set 06-set a 12/set 13-set a 19/set
Int. Uruguai - UY
SetembroSetembroAgostoAgostoJulhoJulho
Exportação de Energia de origem
hidráulica 19/07/2008
Exportação de Energia de origem
hidráulica 19/07/2008
Exportação de Energia de origem Térmica desde 11/12/2007
Exportação de Energia de origem Térmica desde 11/12/2007
• Total de Exportação Hidráulica = 12.549 MWh
• Nº Horas mês = 730,56 ( 24h * 30,44dias)
•Total de Exportação Hidráulica = 17 MWmed
• Total de Exportação Hidráulica = 12.549 MWh
• Nº Horas mês = 730,56 ( 24h * 30,44dias)
•Total de Exportação Hidráulica = 17 MWmed
Fonte: ONS
-
ARMAZENAMENTOS DA REGIÃO NORTE
2006 2007 2008
33,4
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0Ja
n
Fev
Mar
Ab
r
Mai
Jun
Jul
Ag
o
Set
Ou
t
No
v
Dez
Jan
Fev
Mar
Ab
r
Mai
Jun
Jul
Ag
o
Set
Ou
t
No
v
Dez
Jan
Fev
Mar
Ab
r
Mai
Jun
Jul
Ag
o
Set
Ou
t
No
v
Dez
EA
R (
%)
VERIFICADO
CON
PMO Outubro Rev. 01
ENA = 64% MLT
-
ARMAZENAMENTOS DA REGIÃO NORDESTE
2006 2007 2008
42,0
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0Ja
n
Fev
Ma
r
Ab
r
Ma
i
Ju
n
Ju
l
Ag
o
Se
t
Ou
t
No
v
De
z
Ja
n
Fev
Ma
r
Ab
r
Ma
i
Ju
n
Ju
l
Ag
o
Se
t
Ou
t
No
v
De
z
Ja
n
Fev
Ma
r
Ab
r
Ma
i
Ju
n
Ju
l
Ag
o
Se
t
Ou
t
No
v
De
z
EA
R (
%)
CAR
VERIFICADO
PMO Outubro Rev. 01
ENA = 86 % MLT
-
ARMAZENAMENTOS DA REGIÃO SUDESTE
2006 2007 2008
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0Ja
n
Fev
Ma
r
Ab
r
Mai
Ju
n
Ju
l
Ag
o
Set
Ou
t
No
v
De
z
Ja
n
Fev
Ma
r
Ab
r
Mai
Ju
n
Ju
l
Ag
o
Set
Ou
t
No
v
De
z
Ja
n
Fev
Ma
r
Ab
r
Mai
Ju
n
Ju
l
Ag
o
Set
Ou
t
No
v
De
z
EA
R (
%)
CAR
VERIFICADO
PMO OutubroRev. 01
ENA = 102 % MLT
51,9
-
ARMAZENAMENTOS DA REGIÃO SUL
2006 2007 2008
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0Jan
Fev
Ma
r
Ab
r
Ma
i
Ju
n
Ju
l
Ag
o
Se
t
Ou
t
No
v
Dez
Jan
Fev
Ma
r
Ab
r
Ma
i
Ju
n
Ju
l
Ag
o
Se
t
Ou
t
No
v
Dez
Jan
Fev
Ma
r
Ab
r
Ma
i
Ju
n
Ju
l
Ag
o
Se
t
Ou
t
No
v
Dez
EA
R (
%)
CAR
VERIFICADO
PMO OutubroRev. 01
ENA = 65 % MLT
57,7
-
FIM
Avaliação Energética
do
Sistema Interligado Nacional
Outubro de 2008
DGT/SPO/DPLE
Área para Número do Slide
N
SE
NE
S
BOA
REGULAR
RUIM
SITUAÇÃO ENERGÉTICA DO SIN
EAR = 45,3%
CON = 29%
ENA = 57%
EAR DO DIA 03 de Outubro/08
CAR ARMAZENAMENTO AO FINAL DO MÊS
ENA ACUMULADA NO MÊS ATÉ O DIA 03/10/08
EAR = 54,1%
CAR = 22%
ENA = 65%
EAR = 57,3%
CAR = 43%
ENA = 94%
EAR = 53%
CAR = 16%
ENA = 52%
Situação
Área para Número do Slide
A CAR da região Norte está associada apenas ao armazenamento de Tucuruí, que por sinal atualmente está vertendo.
N
SE
NE
BOA
REGULAR
RUIM
BALANÇO ENERGÉTICO DO SIN
859
1.320
2.179
681
4.406
4.410
ITAIPU
60 Hz
ITAIPU
50 Hz
CARGA = 3.780
GHID = 2.921
GTER = 0
PLD = 100,52
CARGA = 7.756
GHID = 5.645
GTER = 90
GEOL= 21
PLD = 100,52
CARGA = 31.872
GHID = 20.644
GNUC = 1.844
GTER = 2.688
PLD = 100,52
CARGA = 8.283
GHID = 7.013
GTER = 646
GEOL = 87
PLD = 100,52
EXPORTAÇÃO
531
5.151
VALORES MÉDIOS (MWmed) OBSERVADOS NO PERÍODO DE 27/Set a 03/Out.
PLD MÉDIO (R$/MWh) - SEMANA DE 27/Set a 03/Out.
6
S
Área para Número do Slide
O recebimento da região Nordeste é apenas para atendimento às necessidades elétricas da região.
BALANÇO ENERGÉTICO DA REGIÃO SUL
ENA = 52 % MLT
(6.360 MWmed)
acumulado no mês até dia 03/10
EAR = 53,0% VU
(9.770 MWmês)
Dia 03 de Outubro/08
Valores médios observados no período de 27/09/08 a 03/10/08
Área para Número do Slide
O recebimento da região Nordeste é apenas para atendimento às necessidades elétricas da região.
Plan1
Interc. SE/SANDE (MWmed)GARABI (Argentina)
AtualMáximo
2.100 MWmed45450 MWmed
GARABI (MWmed)
AtualMáximo
02000
Interc. SE/S (MWmed)
AtualMáximo
2,1002,600
Térmicas (MWmed)Carga
AtualMáximo8.283 MWmed
1,1001,600
Hidráulicas (MWmed)
AtualMáximo
1,1001,600
Plan2
Plan3
Plan1
Interc. SE/SANDE (MWmed)GARABI (Argentina)
AtualMáximo
2.100 MWmed45450 MWmed
GARABI (MWmed)
AtualMáximo
02000
Interc. SE/S (MWmed)
AtualMáximo
2,1002,600
Térmicas (MWmed)Ger. Hidráulica
AtualMáximo7.013 MWmed
1,1001,600
Hidráulicas (MWmed)
AtualMáximo
1,1001,600
Plan2
Plan3
Plan1
Interc. SE/SANDE (MWmed)GARABI (Argentina)
AtualMáximo
2.100 MWmed45450 MWmed
GARABI (MWmed)
AtualMáximo
02000
Interc. SE/S (MWmed)
AtualMáximo
2,1002,600
Térmicas (MWmed)Ger. Térmica
AtualMáximo646 MWmed
1,1001,600
Hidráulicas (MWmed)
AtualMáximo
1,1001,600
Plan2
Plan3
Plan1
Interc. SE/SANDE (MWmed)GARABI (Argentina)
AtualMáximo
2.100 MWmed45450 MWmed
GARABI (MWmed)
AtualMáximo
02000
Interc. SE/S (MWmed)
AtualMáximo
2,1002,600
Térmicas (MWmed)Interc. SE/S
AtualMáximo6 MWmed
1,1001,600
Hidráulicas (MWmed)
AtualMáximo
1,1001,600
Plan2
Plan3
Plan1
Interc. SE/SANDE (MWmed)GARABI (Argentina)
AtualMáximo
2.100 MWmed45450 MWmed
GARABI (MWmed)
AtualMáximo
02000
Interc. SE/S (MWmed)
AtualMáximo
2,1002,600
Térmicas (MWmed)ANDE
AtualMáximo0 MWmed
1,1001,600
Hidráulicas (MWmed)
AtualMáximo
1,1001,600
Plan2
Plan3
Plan1
Interc. SE/SANDE (MWmed)GARABI (Argentina)
AtualMáximo
2.100 MWmed45450 MWmed
GARABI (MWmed)
AtualMáximo
02000
Interc. SE/S (MWmed)
AtualMáximo
2,1002,600
Térmicas (MWmed)Argentina
AtualMáximo531 MWmed
1,1001,600
Hidráulicas (MWmed)
AtualMáximo
1,1001,600
Plan2
Plan3
Plan1
Interc. SE/SANDE (MWmed)GARABI (Argentina)
AtualMáximo
2.100 MWmed45450 MWmed
GARABI (MWmed)
AtualMáximo
02000
Interc. SE/S (MWmed)
AtualMáximo
2,1002,600
Térmicas (MWmed)Uruguai
AtualMáximo0 MWmed
1,1001,600
Hidráulicas (MWmed)
AtualMáximo
1,1001,600
Plan2
Plan3
Plan1
Interc. SE/SANDE (MWmed)GARABI (Argentina)
AtualMáximo
2.100 MWmed45450 MWmed
GARABI (MWmed)
AtualMáximo
02000
Interc. SE/S (MWmed)
AtualMáximo
2,1002,600
Térmicas (MWmed)Recurso
AtualMáximo
1,1001,600
Hidráulicas (MWmed)
AtualMáximo
1,1001,600
Plan2
Plan3
Plan1
Interc. SE/SANDE (MWmed)GARABI (Argentina)
AtualMáximo
2.100 MWmed45450 MWmed
GARABI (MWmed)
AtualMáximo
02000
Interc. SE/S (MWmed)
AtualMáximo
2,1002,600
Térmicas (MWmed)Requisito
AtualMáximo
1,1001,600
Hidráulicas (MWmed)
AtualMáximo
1,1001,600
Plan2
Plan3
Plan1
Interc. SE/SANDE (MWmed)GARABI (Argentina)
AtualMáximo
2.100 MWmed45450 MWmed
GARABI (MWmed)
AtualMáximo
02000
Interc. SE/S (MWmed)
AtualMáximo
2,1002,600
Térmicas (MWmed)Ger. Eólica
AtualMáximo87 MWmed
1,1001,600
Hidráulicas (MWmed)
AtualMáximo
1,1001,600
Plan2
Plan3
IGUAÇU
52,0
XX%
XX%
ENERGIA ARMAZENADA
PARTICIPAÇÃO NO SUL
50,2
1,9
OUTRAS SUL
JACUÍ
23,3
71,2
URUGUAI
22,8
47,1
ENERGIA ARMAZENADA - REGIÃO SUL
03/10/2008
Área para Número do Slide
O recebimento da região Nordeste é apenas para atendimento às necessidades elétricas da região.
TRANSFERÊNCIA DE ENERGIA ENTRE REGIÕES
Valores previstos para a semana de 04/10 a 10/10
Área para Número do Slide
O recebimento da região Nordeste é apenas para atendimento às necessidades elétricas da região.
PREVISÃO CLIMÁTICA
Fonte: CPTEC/INPE
Área para Número do Slide
PREVISÃO CLIMÁTICA
Fonte: SIMEPAR
Área para Número do Slide
ENERGIA ARMAZENADA DA REGIÃO SUDESTE
CAR 2008 / 2009
51,9 % Valor esperado – PMO Out/08 Rev. 01
Área para Número do Slide
Gráfico2
janjanjan0.68511117911.10989207020.778
fevfevfev0.84417065941.08471578330.351
marmarmar1.08020760261.12704971940.36
abrabrabr0.56147596340.57235900221.04
maimaimai0.49948034050.4569640209
junjunjun0.47324688970.7605287688
juljuljul0.82793655170.6577592867
agoagoago0.53156789220.3308526209
setsetset2.02088093160.2441720996
outoutout1.51273146390.4202403212
novnovnov0.72688615530.8035795254
dezdezdez0.66817187772.2499899368
&A
Page &P
PREVPMO
4º pior fev
2º pior mar
EAR 2000
EAR 2003
EAR 2005
ENA 2000
ENA 2003
ENA 2005
EAR (% do MAX)
ENA (% da MLT)
EARs e ENAs da Região Sul
47.5
85.4
68.2
47.3
89.3
50.7
52.3
87.9
34.6
40
72.8
42.5
30.2
58.8
64
29.6
60.9
93
44.1
60.2
90.7
47
47.1
83.9
85.7
33.6
95.2
96.2
33.5
90.9
92.9
41.2
87.6
89.4
81
78.8
Gráfico1
janjanjan71.278.45350.8
fevfevfev78.584.56365.7
marmarmar85.486.76778.6
abrabrabr87.386.76882.3
maimaimai84.685.36883
junjunjun7982.66579.7
juljuljul70.379.66173.2
agoagoago59.272.15666.4
setsetset49.661.94860
outoutout45.251.74351.9
novnovnov42.448.237
dezdezdez53.346.239
&A
Page &P
2003
2004
2005
2006
2007
CAR 2008/2009
2008
Armazenamentos no final do mês
EAR (%)
61.6
47.7
75.7
72.8
66.8
78.8
76.9
76.2
85.9
78.9
81.1
85.8
76.2
82.9
85.4
73
82.6
82.6
67.3
80.6
78.3
59.3
74.7
70.1
50.2
66.1
65.3
40.9
62
60.4
36.2
59.4
59.3
37.4
64.7
67.1
Plan1
EAR 2000EAR 2003EAR 2005CAR (EAR)
EAR200020012002200320042005200620072008CAR 2006CAR 2008/2009difCAR 2005
jan29.331.447.061.647.775.771.278.450.833.053.020.020.0
fev45.033.463.272.866.878.878.584.565.735.063.028.028.0
mar58.534.570.176.976.285.985.486.778.638.067.029.029.0
abr59.432.269.178.981.185.887.386.782.337.068.031.031.0
mai54.129.768.576.282.985.484.685.383.038.068.030.030.0
jun47.328.665.873.082.682.679.082.679.736.065.029.029.024.9
jul40.226.861.767.380.678.370.379.673.232.061.029.029.024.9
ago32.423.455.659.374.770.159.272.166.427.056.029.029.0
set30.820.651.350.266.165.349.661.960.020.048.028.028.0
out23.021.343.140.962.060.445.251.751.914.043.029.029.0
nov22.123.040.736.259.459.342.448.210.037.027.027.0
dez28.532.343.737.464.767.153.346.210.039.029.029.0
ENA 2000ENA 2003ENA 2005
ENA200020012002200320042005
jan68.5%153.5%98.7%111.0%128.2%77.8%
fev84.4%233.8%69.5%108.5%57.6%35.1%
mar108.0%141.1%61.2%112.7%48.6%36.0%
abr56.1%107.0%52.9%57.2%58.7%104.0%
mai49.9%106.6%107.8%45.7%108.0%
jun47.3%95.0%92.4%76.1%88.7%
jul82.8%108.3%59.3%65.8%116.5%
ago53.2%75.9%113.2%33.1%46.5%
set202.1%70.9%126.1%24.4%65.7%
out151.3%176.7%137.9%42.0%112.9%
nov72.7%75.6%186.5%80.4%147.6%
dez66.8%99.2%221.2%225.0%80.5%
ENERGIA ARMAZENADA DA REGIÃO SUDESTE
CAR 2008 / 2009
51,9 % Valor esperado – PMO Out/08 Rev. 01
Área para Número do Slide
Gráfico2
janjanjan0.68511117911.10989207020.778
fevfevfev0.84417065941.08471578330.351
marmarmar1.08020760261.12704971940.36
abrabrabr0.56147596340.57235900221.04
maimaimai0.49948034050.4569640209
junjunjun0.47324688970.7605287688
juljuljul0.82793655170.6577592867
agoagoago0.53156789220.3308526209
setsetset2.02088093160.2441720996
outoutout1.51273146390.4202403212
novnovnov0.72688615530.8035795254
dezdezdez0.66817187772.2499899368
&A
Page &P
PREVPMO
4º pior fev
2º pior mar
EAR 2000
EAR 2003
EAR 2005
ENA 2000
ENA 2003
ENA 2005
EAR (% do MAX)
ENA (% da MLT)
EARs e ENAs da Região Sul
47.5
85.4
68.2
47.3
89.3
50.7
52.3
87.9
34.6
40
72.8
42.5
30.2
58.8
64
29.6
60.9
93
44.1
60.2
90.7
47
47.1
83.9
85.7
33.6
95.2
96.2
33.5
90.9
92.9
41.2
87.6
89.4
81
78.8
Gráfico1
janjanjan71.278.45350.8
fevfevfev78.584.56365.7
marmarmar85.486.76778.6
abrabrabr87.386.76882.3
maimaimai84.685.36883
junjunjun7982.66579.7
juljuljul70.379.66173.2
agoagoago59.272.15666.4
setsetset49.661.94860
outoutout45.251.74351.9
novnovnov42.448.23749.6
dezdezdez53.346.239
&A
Page &P
2003
2004
2005
2006
2007
CAR 2008/2009
2008
Armazenamentos no final do mês
EAR (%)
61.6
47.7
75.7
72.8
66.8
78.8
76.9
76.2
85.9
78.9
81.1
85.8
76.2
82.9
85.4
73
82.6
82.6
67.3
80.6
78.3
59.3
74.7
70.1
50.2
66.1
65.3
40.9
62
60.4
36.2
59.4
59.3
37.4
64.7
67.1
Plan1
EAR 2000EAR 2003EAR 2005CAR (EAR)
EAR200020012002200320042005200620072008CAR 2006CAR 2008/2009difCAR 2005
jan29.331.447.061.647.775.771.278.450.833.053.020.020.0
fev45.033.463.272.866.878.878.584.565.735.063.028.028.0
mar58.534.570.176.976.285.985.486.778.638.067.029.029.0
abr59.432.269.178.981.185.887.386.782.337.068.031.031.0
mai54.129.768.576.282.985.484.685.383.038.068.030.030.0
jun47.328.665.873.082.682.679.082.679.736.065.029.029.024.9
jul40.226.861.767.380.678.370.379.673.232.061.029.029.024.9
ago32.423.455.659.374.770.159.272.166.427.056.029.029.0
set30.820.651.350.266.165.349.661.960.020.048.028.028.0
out23.021.343.140.962.060.445.251.751.914.043.029.029.0
nov22.123.040.736.259.459.342.448.249.610.037.027.027.0
dez28.532.343.737.464.767.153.346.210.039.029.029.0
ENA 2000ENA 2003ENA 2005
ENA200020012002200320042005
jan68.5%153.5%98.7%111.0%128.2%77.8%
fev84.4%233.8%69.5%108.5%57.6%35.1%
mar108.0%141.1%61.2%112.7%48.6%36.0%
abr56.1%107.0%52.9%57.2%58.7%104.0%
mai49.9%106.6%107.8%45.7%108.0%
jun47.3%95.0%92.4%76.1%88.7%
jul82.8%108.3%59.3%65.8%116.5%
ago53.2%75.9%113.2%33.1%46.5%
set202.1%70.9%126.1%24.4%65.7%
out151.3%176.7%137.9%42.0%112.9%
nov72.7%75.6%186.5%80.4%147.6%
dez66.8%99.2%221.2%225.0%80.5%
Plan1
Estudo Prospectivo ONS
ENA (%Mlt)
Nov
97
Plan2
Plan3
ENERGIA ARMAZENADA DA REGIÃO SUL
CAR 2008 / 2009
57,7% Valor esperado – PMO Out/08 Rev. 01
Área para Número do Slide
Gráfico2
janjanjan0.68511117911.10989207020.778
fevfevfev0.84417065941.08471578330.351
marmarmar1.08020760261.12704971940.36
abrabrabr0.56147596340.57235900221.04
maimaimai0.49948034050.4569640209
junjunjun0.47324688970.7605287688
juljuljul0.82793655170.6577592867
agoagoago0.53156789220.3308526209
setsetset2.02088093160.2441720996
outoutout1.51273146390.4202403212
novnovnov0.72688615530.8035795254
dezdezdez0.66817187772.2499899368
&A
Page &P
PREVPMO
4º pior fev
2º pior mar
EAR 2000
EAR 2003
EAR 2005
ENA 2000
ENA 2003
ENA 2005
EAR (% do MAX)
ENA (% da MLT)
EARs e ENAs da Região Sul
47.5
85.4
68.2
47.3
89.3
50.7
52.3
87.9
34.6
40
72.8
42.5
30.2
58.8
64
29.6
60.9
93
44.1
60.2
90.7
47
47.1
83.9
85.7
33.6
95.2
96.2
33.5
90.9
92.9
41.2
87.6
89.4
81
78.8
Gráfico1
janjanjan71.963.11863.3
fevfevfev6369.81947.8
marmarmar48.980.41942.8
abrabrabr41.282.61649
maimaimai31.189.21364.6
junjunjun29.876.71368.6
juljuljul31.579.81356
agoagoago38.661.91362
setsetset42.955.81358.9
outoutout40.759.81657.7
novnovnov48.275.520
dezdezdez55.272.722
&A
Page &P
2003
2004
2005
2006
2007
CAR 2008
2008
Armazenamentos no final do mês
EAR (%)
55,3 **
85.4
81.8
68.2
89.3
73
50.7
87.9
57.1
34.6
72.8
48.5
42.5
58.8
60.9
64
60.9
75.1
93
60.2
86.7
90.7
47.1
68.2
83.9
33.6
64.9
95.2
33.5
86.5
90.9
41.2
85.9
87.6
81
74.2
78.8
Plan1
EAR 2000EAR 2003EAR 2005CAR (EAR)
EAR200020012002200320042005200620072008LICAR 2006CAR 2008difCAR 2005
jan47.598.692.585.481.868.271.963.163.319.018.0-1.0-1.0
fev47.397.487.989.373.050.763.069.847.820.019.0-1.0-1.0
mar52.391.776.087.957.134.648.980.442.819.019.00.00.0
abr40.082.860.172.848.542.541.282.649.016.016.00.00.0
mai30.282.774.658.860.964.031.189.264.613.013.00.00.0
jun29.692.867.560.975.193.029.876.768.613.013.00.00.024.9
jul44.196.853.960.286.790.731.579.856.013.013.00.00.024.9
ago47.084.859.847.168.283.938.661.962.013.013.00.00.0
set85.777.079.433.664.995.242.955.858.913.013.00.00.0
out96.296.595.233.586.590.940.759.857.713.016.03.03.0
nov92.987.096.241.285.987.648.275.513.020.07.07.0
dez89.482.797.381.074.278.855.272.713.022.09.09.0
ENA 2000ENA 2003ENA 2005
ENA200020012002200320042005
jan68.5%153.5%98.7%111.0%128.2%77.8%
fev84.4%233.8%69.5%108.5%57.6%35.1%
mar108.0%141.1%61.2%112.7%48.6%36.0%
abr56.1%107.0%52.9%57.2%58.7%104.0%
mai49.9%106.6%107.8%45.7%108.0%
jun47.3%95.0%92.4%76.1%88.7%
jul82.8%108.3%59.3%65.8%116.5%
ago53.2%75.9%113.2%33.1%46.5%
set202.1%70.9%126.1%24.4%65.7%
out151.3%176.7%137.9%42.0%112.9%
nov72.7%75.6%186.5%80.4%147.6%
dez66.8%99.2%221.2%225.0%80.5%
ENERGIA ARMAZENADA DA REGIÃO SUL
CAR 2008 / 2009
57,7% Valor esperado – PMO Out/08 Rev. 01
Área para Número do Slide
Gráfico2
janjanjan0.68511117911.10989207020.778
fevfevfev0.84417065941.08471578330.351
marmarmar1.08020760261.12704971940.36
abrabrabr0.56147596340.57235900221.04
maimaimai0.49948034050.4569640209
junjunjun0.47324688970.7605287688
juljuljul0.82793655170.6577592867
agoagoago0.53156789220.3308526209
setsetset2.02088093160.2441720996
outoutout1.51273146390.4202403212
novnovnov0.72688615530.8035795254
dezdezdez0.66817187772.2499899368
&A
Page &P
PREVPMO
4º pior fev
2º pior mar
EAR 2000
EAR 2003
EAR 2005
ENA 2000
ENA 2003
ENA 2005
EAR (% do MAX)
ENA (% da MLT)
EARs e ENAs da Região Sul
47.5
85.4
68.2
47.3
89.3
50.7
52.3
87.9
34.6
40
72.8
42.5
30.2
58.8
64
29.6
60.9
93
44.1
60.2
90.7
47
47.1
83.9
85.7
33.6
95.2
96.2
33.5
90.9
92.9
41.2
87.6
89.4
81
78.8
Gráfico1
janjanjan71.963.11863.3
fevfevfev6369.81947.8
marmarmar48.980.41942.8
abrabrabr41.282.61649
maimaimai31.189.21364.6
junjunjun29.876.71368.6
juljuljul31.579.81356
agoagoago38.661.91362
setsetset42.955.81358.9
outoutout40.759.81657.7
novnovnov48.275.52063.3
dezdezdez55.272.722
&A
Page &P
2003
2004
2005
2006
2007
CAR 2008
2008
Armazenamentos no final do mês
EAR (%)
55,3 **
85.4
81.8
68.2
89.3
73
50.7
87.9
57.1
34.6
72.8
48.5
42.5
58.8
60.9
64
60.9
75.1
93
60.2
86.7
90.7
47.1
68.2
83.9
33.6
64.9
95.2
33.5
86.5
90.9
41.2
85.9
87.6
81
74.2
78.8
Plan1
EAR 2000EAR 2003EAR 2005CAR (EAR)
EAR200020012002200320042005200620072008LICAR 2006CAR 2008difCAR 2005
jan47.598.692.585.481.868.271.963.163.319.018.0-1.0-1.0
fev47.397.487.989.373.050.763.069.847.820.019.0-1.0-1.0
mar52.391.776.087.957.134.648.980.442.819.019.00.00.0
abr40.082.860.172.848.542.541.282.649.016.016.00.00.0
mai30.282.774.658.860.964.031.189.264.613.013.00.00.0
jun29.692.867.560.975.193.029.876.768.613.013.00.00.024.9
jul44.196.853.960.286.790.731.579.856.013.013.00.00.024.9
ago47.084.859.847.168.283.938.661.962.013.013.00.00.0
set85.777.079.433.664.995.242.955.858.913.013.00.00.0
out96.296.595.233.586.590.940.759.857.713.016.03.03.0
nov92.987.096.241.285.987.648.275.563.313.020.07.07.0
dez89.482.797.381.074.278.855.272.713.022.09.09.0
ENA 2000ENA 2003ENA 2005
ENA200020012002200320042005
jan68.5%153.5%98.7%111.0%128.2%77.8%
fev84.4%233.8%69.5%108.5%57.6%35.1%
mar108.0%141.1%61.2%112.7%48.6%36.0%
abr56.1%107.0%52.9%57.2%58.7%104.0%
mai49.9%106.6%107.8%45.7%108.0%
jun47.3%95.0%92.4%76.1%88.7%
jul82.8%108.3%59.3%65.8%116.5%
ago53.2%75.9%113.2%33.1%46.5%
set202.1%70.9%126.1%24.4%65.7%
out151.3%176.7%137.9%42.0%112.9%
nov72.7%75.6%186.5%80.4%147.6%
dez66.8%99.2%221.2%225.0%80.5%
Plan1
Estudo Prospectivo ONS
ENA (%Mlt)
Nov
91
Plan2
Plan3
ENERGIA ARMAZENADA DA REGIÃO NORDESTE
CAR 2008 / 2009
42,0% Valor esperado – PMO Ou/08 Rev. 01
Área para Número do Slide
Gráfico2
janjanjan0.68511117911.10989207020.778
fevfevfev0.84417065941.08471578330.351
marmarmar1.08020760261.12704971940.36
abrabrabr0.56147596340.57235900221.04
maimaimai0.49948034050.4569640209
junjunjun0.47324688970.7605287688
juljuljul0.82793655170.6577592867
agoagoago0.53156789220.3308526209
setsetset2.02088093160.2441720996
outoutout1.51273146390.4202403212
novnovnov0.72688615530.8035795254
dezdezdez0.66817187772.2499899368
&A
Page &P
PREVPMO
4º pior fev
2º pior mar
EAR 2000
EAR 2003
EAR 2005
ENA 2000
ENA 2003
ENA 2005
EAR (% do MAX)
ENA (% da MLT)
EARs e ENAs da Região Sul
47.5
85.4
68.2
47.3
89.3
50.7
52.3
87.9
34.6
40
72.8
42.5
30.2
58.8
64
29.6
60.9
93
44.1
60.2
90.7
47
47.1
83.9
85.7
33.6
95.2
96.2
33.5
90.9
92.9
41.2
87.6
89.4
81
78.8
Gráfico1
janjanjan77.477.5101030.6
fevfevfev77.984.6222348.3
marmarmar89.794.8393966
abrabrabr98.395.55281.8
maimaimai95.692.95382.1
junjunjun89.883.54678.6
juljuljul80.773.43873.3
agoagoago7165.63064.4
setsetset60.454.52750.6
outoutout52.340.22242
novnovnov48.729.422
dezdezdez61.926.630
&A
Page &P
2003
2004
2005
2006
2007
2008
Armazenamentos no final do mês
EAR (%)
35
34
71.5
45.8
54.5
82.3
49.1
83.2
92
53
97.4
97.1
49.3
96
95.7
45.2
95.1
91.3
40
90.4
84.6
34.1
83.2
76.7
27.8
73.3
67.5
19
64
57.2
13.7
56.4
53
14.2
58.9
67.1
Plan1
EAR 2000EAR 2003EAR 2005CAR (EAR)
EAR200020012002200320042005200620072008CAR 2006CAR 2008DIFCAR 2005CAR 2005
jan35.741.437.735.034.071.577.477.530.633.010.010.022.0-11.0
fev54.138.255.945.854.582.377.984.648.336.022.023.023.0-13.0
mar66.037.263.949.183.292.089.794.866.039.039.00.039.034.0-5.0
abr71.233.165.653.097.497.198.395.581.840.052.012.031.0-9.0
mai67.327.361.049.396.095.795.692.982.137.053.016.027.0-10.0
jun61.824.655.845.295.191.389.883.578.635.046.011.028.0-7.024.9
jul54.920.949.440.090.484.680.773.473.330.038.08.030.00.024.9
ago46.816.941.834.183.276.771.065.664.424.030.06.031.07.0
set39.412.533.227.873.367.560.454.550.618.027.09.029.011.0
out28.98.524.419.064.057.252.340.242.013.022.09.030.017.0
nov27.57.818.613.756.453.048.729.410.022.012.030.020.0
dez36.814.118.714.258.967.161.926.610.030.020.025.015.0
ENA 2000ENA 2003ENA 2005
ENA200020012002200320042005
jan68.5%153.5%98.7%111.0%128.2%77.8%
fev84.4%233.8%69.5%108.5%57.6%35.1%
mar108.0%141.1%61.2%112.7%48.6%36.0%
abr56.1%107.0%52.9%57.2%58.7%104.0%
mai49.9%106.6%107.8%45.7%108.0%
jun47.3%95.0%92.4%76.1%88.7%
jul82.8%108.3%59.3%65.8%116.5%
ago53.2%75.9%113.2%33.1%46.5%
set202.1%70.9%126.1%24.4%65.7%
out151.3%176.7%137.9%42.0%112.9%
nov72.7%75.6%186.5%80.4%147.6%
dez66.8%99.2%221.2%225.0%80.5%
ENERGIA ARMAZENADA DA REGIÃO NORDESTE
CAR 2008 / 2009
42,0% Valor esperado – PMO Out/08 Rev. 01
Área para Número do Slide
Gráfico2
janjanjan0.68511117911.10989207020.778
fevfevfev0.84417065941.08471578330.351
marmarmar1.08020760261.12704971940.36
abrabrabr0.56147596340.57235900221.04
maimaimai0.49948034050.4569640209
junjunjun0.47324688970.7605287688
juljuljul0.82793655170.6577592867
agoagoago0.53156789220.3308526209
setsetset2.02088093160.2441720996
outoutout1.51273146390.4202403212
novnovnov0.72688615530.8035795254
dezdezdez0.66817187772.2499899368
&A
Page &P
PREVPMO
4º pior fev
2º pior mar
EAR 2000
EAR 2003
EAR 2005
ENA 2000
ENA 2003
ENA 2005
EAR (% do MAX)
ENA (% da MLT)
EARs e ENAs da Região Sul
47.5
85.4
68.2
47.3
89.3
50.7
52.3
87.9
34.6
40
72.8
42.5
30.2
58.8
64
29.6
60.9
93
44.1
60.2
90.7
47
47.1
83.9
85.7
33.6
95.2
96.2
33.5
90.9
92.9
41.2
87.6
89.4
81
78.8
Gráfico1
janjanjan77.477.5101030.6
fevfevfev77.984.6222348.3
marmarmar89.794.8393966
abrabrabr98.395.55281.8
maimaimai95.692.95382.1
junjunjun89.883.54678.6
juljuljul80.773.43873.3
agoagoago7165.63064.4
setsetset60.454.52750.6
outoutout52.340.22242
novnovnov48.729.42232.8
dezdezdez61.926.630
&A
Page &P
2003
2004
2005
2006
2007
2008
Armazenamentos no final do mês
EAR (%)
35
34
71.5
45.8
54.5
82.3
49.1
83.2
92
53
97.4
97.1
49.3
96
95.7
45.2
95.1
91.3
40
90.4
84.6
34.1
83.2
76.7
27.8
73.3
67.5
19
64
57.2
13.7
56.4
53
14.2
58.9
67.1
Plan1
EAR 2000EAR 2003EAR 2005CAR (EAR)
EAR200020012002200320042005200620072008CAR 2006CAR 2008DIFCAR 2005CAR 2005
jan35.741.437.735.034.071.577.477.530.633.010.010.022.0-11.0
fev54.138.255.945.854.582.377.984.648.336.022.023.023.0-13.0
mar66.037.263.949.183.292.089.794.866.039.039.00.039.034.0-5.0
abr71.233.165.653.097.497.198.395.581.840.052.012.031.0-9.0
mai67.327.361.049.396.095.795.692.982.137.053.016.027.0-10.0
jun61.824.655.845.295.191.389.883.578.635.046.011.028.0-7.024.9
jul54.920.949.440.090.484.680.773.473.330.038.08.030.00.024.9
ago46.816.941.834.183.276.771.065.664.424.030.06.031.07.0
set39.412.533.227.873.367.560.454.550.618.027.09.029.011.0
out28.98.524.419.064.057.252.340.242.013.022.09.030.017.0
nov27.57.818.613.756.453.048.729.432.810.022.012.030.020.0
dez36.814.118.714.258.967.161.926.610.030.020.025.015.0
ENA 2000ENA 2003ENA 2005
ENA200020012002200320042005
jan68.5%153.5%98.7%111.0%128.2%77.8%
fev84.4%233.8%69.5%108.5%57.6%35.1%
mar108.0%141.1%61.2%112.7%48.6%36.0%
abr56.1%107.0%52.9%57.2%58.7%104.0%
mai49.9%106.6%107.8%45.7%108.0%
jun47.3%95.0%92.4%76.1%88.7%
jul82.8%108.3%59.3%65.8%116.5%
ago53.2%75.9%113.2%33.1%46.5%
set202.1%70.9%126.1%24.4%65.7%
out151.3%176.7%137.9%42.0%112.9%
nov72.7%75.6%186.5%80.4%147.6%
dez66.8%99.2%221.2%225.0%80.5%
Plan1
Estudo Prospectivo do ONS
ENA (% mlt)
Nov
65
Plan2
Plan3
ENERGIA ARMAZENADA DA REGIÃO NORTE
CON 2008
33,4% Valor esperado – PMO Out/08 Rev. 01
Área para Número do Slide
Gráfico2
janjanjan0.68511117911.10989207020.778
fevfevfev0.84417065941.08471578330.351
marmarmar1.08020760261.12704971940.36
abrabrabr0.56147596340.57235900221.04
maimaimai0.49948034050.4569640209
junjunjun0.47324688970.7605287688
juljuljul0.82793655170.6577592867
agoagoago0.53156789220.3308526209
setsetset2.02088093160.2441720996
outoutout1.51273146390.4202403212
novnovnov0.72688615530.8035795254
dezdezdez0.66817187772.2499899368
&A
Page &P
PREVPMO
4º pior fev
2º pior mar
EAR 2000
EAR 2003
EAR 2005
ENA 2000
ENA 2003
ENA 2005
EAR (% do MAX)
ENA (% da MLT)
EARs e ENAs da Região Sul
47.5
85.4
68.2
47.3
89.3
50.7
52.3
87.9
34.6
40
72.8
42.5
30.2
58.8
64
29.6
60.9
93
44.1
60.2
90.7
47
47.1
83.9
85.7
33.6
95.2
96.2
33.5
90.9
92.9
41.2
87.6
89.4
81
78.8
Gráfico1
janjanjan73.748.24930
fevfevfev90.591.67944.4
marmarmar94.697.89086.4
abrabrabr97.399.69194.9
maimaimai9898.59195.6
junjunjun93.793.18790.8
juljuljul77.6827577.8
agoagoago54.661.25663.4
setsetset44.546.74247.3
outoutout36.335.82933.4
novnovnov33.730.521
dezdezdez35.730.115
&A
Page &P
2003
2004
2005
2006
2007
2008
Armazenamentos no final do mês
EAR (%)
34.1
46.5
48.8
73.5
79
86.8
80.6
86.4
95
83.3
90.5
98
84.8
89.5
97.5
82
88.4
93.1
73.9
80.6
84.4
63.9
68.4
71.2
47
53
56.2
30.6
37.2
41.2
23.1
30.5
34.1
20.5
31.1
48.1
Plan1
EAR 2000EAR 2003EAR 2005CAR (EAR)
EAR200020012002200320042005200620072008CAR 2006CAR 2008DIFCAR 2005CAR 2005
jan75.571.970.834.146.548.873.748.230.034.049.00.022.0-12.0
fev80.772.575.373.579.086.890.591.644.437.079.012.023.0-14.0
mar83.374.377.980.686.495.094.697.886.474.090.05.034.0-40.0
abr83.776.473.683.390.598.097.399.694.988.091.02.031.0-57.0
mai82.175.974.284.889.597.598.098.595.689.091.02.027.0-62.0
jun81.170.770.882.088.493.193.793.190.887.087.04.028.0-59.024.9
jul75.564.758.673.980.684.477.682.077.877.075.030.0-47.024.9
ago61.552.343.163.968.471.254.661.263.462.056.031.0-31.0
set45.438.228.847.053.056.244.546.747.348.042.029.0-19.0
out32.124.216.130.637.241.236.335.833.435.029.030.0-5.0
nov29.018.09.823.130.534.133.730.525.021.030.05.0
dez59.337.412.920.531.148.135.730.119.015.025.06.0
ENA 2000ENA 2003ENA 2005
ENA200020012002200320042005
jan68.5%153.5%98.7%111.0%128.2%77.8%
fev84.4%233.8%69.5%108.5%57.6%35.1%
mar108.0%141.1%61.2%112.7%48.6%36.0%
abr56.1%107.0%52.9%57.2%58.7%104.0%
mai49.9%106.6%107.8%45.7%108.0%
jun47.3%95.0%92.4%76.1%88.7%
jul82.8%108.3%59.3%65.8%116.5%
ago53.2%75.9%113.2%33.1%46.5%
set202.1%70.9%126.1%24.4%65.7%
out151.3%176.7%137.9%42.0%112.9%
nov72.7%75.6%186.5%80.4%147.6%
dez66.8%99.2%221.2%225.0%80.5%
ENERGIA ARMAZENADA DA REGIÃO NORTE
CON 2008
33,4% Valor esperado – PMO Out/08 Rev. 01
Área para Número do Slide
Gráfico2
janjanjan0.68511117911.10989207020.778
fevfevfev0.84417065941.08471578330.351
marmarmar1.08020760261.12704971940.36
abrabrabr0.56147596340.57235900221.04
maimaimai0.49948034050.4569640209
junjunjun0.47324688970.7605287688
juljuljul0.82793655170.6577592867
agoagoago0.53156789220.3308526209
setsetset2.02088093160.2441720996
outoutout1.51273146390.4202403212
novnovnov0.72688615530.8035795254
dezdezdez0.66817187772.2499899368
&A
Page &P
PREVPMO
4º pior fev
2º pior mar
EAR 2000
EAR 2003
EAR 2005
ENA 2000
ENA 2003
ENA 2005
EAR (% do MAX)
ENA (% da MLT)
EARs e ENAs da Região Sul
47.5
85.4
68.2
47.3
89.3
50.7
52.3
87.9
34.6
40
72.8
42.5
30.2
58.8
64
29.6
60.9
93
44.1
60.2
90.7
47
47.1
83.9
85.7
33.6
95.2
96.2
33.5
90.9
92.9
41.2
87.6
89.4
81
78.8
Gráfico1
janjanjan73.748.24930
fevfevfev90.591.67944.4
marmarmar94.697.89086.4
abrabrabr97.399.69194.9
maimaimai9898.59195.6
junjunjun93.793.18790.8
juljuljul77.6827577.8
agoagoago54.661.25663.4
setsetset44.546.74247.3
outoutout36.335.82933.4
novnovnov33.730.52126.1
dezdezdez35.730.115
&A
Page &P
2003
2004
2005
2006
2007
2008
Armazenamentos no final do mês
EAR (%)
34.1
46.5
48.8
73.5
79
86.8
80.6
86.4
95
83.3
90.5
98
84.8
89.5
97.5
82
88.4
93.1
73.9
80.6
84.4
63.9
68.4
71.2
47
53
56.2
30.6
37.2
41.2
23.1
30.5
34.1
20.5
31.1
48.1
Plan1
EAR 2000EAR 2003EAR 2005CAR (EAR)
EAR200020012002200320042005200620072008CAR 2006CAR 2008DIFCAR 2005CAR 2005
jan75.571.970.834.146.548.873.748.230.034.049.00.022.0-12.0
fev80.772.575.373.579.086.890.591.644.437.079.012.023.0-14.0
mar83.374.377.980.686.495.094.697.886.474.090.05.034.0-40.0
abr83.776.473.683.390.598.097.399.694.988.091.02.031.0-57.0
mai82.175.974.284.889.597.598.098.595.689.091.02.027.0-62.0
jun81.170.770.882.088.493.193.793.190.887.087.04.028.0-59.024.9
jul75.564.758.673.980.684.477.682.077.877.075.030.0-47.024.9
ago61.552.343.163.968.471.254.661.263.462.056.031.0-31.0
set45.438.228.847.053.056.244.546.747.348.042.029.0-19.0
out32.124.216.130.637.241.236.335.833.435.029.030.0-5.0
nov29.018.09.823.130.534.133.730.526.125.021.030.05.0
dez59.337.412.920.531.148.135.730.119.015.025.06.0
ENA 2000ENA 2003ENA 2005
ENA200020012002200320042005
jan68.5%153.5%98.7%111.0%128.2%77.8%
fev84.4%233.8%69.5%108.5%57.6%35.1%
mar108.0%141.1%61.2%112.7%48.6%36.0%
abr56.1%107.0%52.9%57.2%58.7%104.0%
mai49.9%106.6%107.8%45.7%108.0%
jun47.3%95.0%92.4%76.1%88.7%
jul82.8%108.3%59.3%65.8%116.5%
ago53.2%75.9%113.2%33.1%46.5%
set202.1%70.9%126.1%24.4%65.7%
out151.3%176.7%137.9%42.0%112.9%
nov72.7%75.6%186.5%80.4%147.6%
dez66.8%99.2%221.2%225.0%80.5%
Plan1
Estudo Prospectivo do ONS
ENA (% mlt)
Nov
74
Plan2
Plan3
DECISÃO TÉRMICA DO SIN
Área para Número do Slide
OUTROS FATOS RELEVANTES
Continuam despachadas térmicas a carvão e gás, não indicadas para despacho por ordem de mérito, de acordo com a determinação do CMSE. O Custo acumulado até 30/09 é de 2,3 bilhões de reais, aproximadamente.
Teve início em 24/05/2008 a exportação, em caráter excepcional, de energia de origem hidrelétrica do subsistema SE/CO para o sistema elétrico argentino. A Resolução CNPE Nº 5, de 17/06/08, estendeu ao Uruguai este tipo de suprimento. O fornecimento total de energia nesta modalidade estará limitado a 500 MWmed, sendo efetivado no período de maio a agosto de 2008, e compensado obrigatoriamente pelo sistema elétrico argentino no período de setembro a novembro/2008.
Área para Número do Slide
Exportação p/ Argentina
354
577
688
1185
896
845
1035
784
-405
-1299
-184
425
416
115
-61
-619
Maio
Junho
Julho
Agosto
Dados verificados até 19/09/2009
Saldo para devolução: 7,95%
do montante exportado
Setembro
Devolução de Energia a partir de 09/07
-388
Fonte: ONS
Área para Número do Slide
precos 1
188961168
AnoMêsSemanaData InícioData FimPesado SEMédio SELeve SE
2008545/17/085/23/0834.7734.2933.4534.04
2008555/24/085/30/0851.6251.1149.3450.52
2008615/31/086/6/0876.8976.1276.1276.20
2008626/7/086/13/0877.0276.1676.0376.20
2008636/14/086/20/0871.7470.569.8870.41
2008646/21/086/27/0877.7376.7276.7276.83
2008716/28/087/4/0889.0788.1188.1188.21
2008727/5/087/11/0891.7991.3291.3291.37
2008737/12/087/18/08103.31102.58102.53102.64
2008747/19/087/25/08111.69110.23110.12110.35
2008817/26/088/1/08147.75146.66145.35146.30
2008828/2/088/8/08140.43138.64138.25138.69
2008838/9/088/15/08121.54117.87117.49118.13
2008848/16/088/22/0881.4980.1377.0579.16
2008858/23/088/29/0874.2972.6569.3871.64
2008918/30/089/5/0896.0293.2593.2593.55
2008929/6/089/12/08109.04105.83105.62106.10
2008939/13/089/19/08122.97119.06118.04119.11
2008949/20/089/26/08126.19121.19120.97121.65
Custo da Exportação (R$/MWh)
613.52527.36687.71709.97661.80625.32627.41635.47------------
-34.0450.5276.2076.2070.4176.8388.2191.37102.64110.35146.30138.69118.1379.1671.6493.55106.10119.11121.65
Exportação p/ Uruguai
Setembro
Agosto
Julho
Exportação de Energia de origem hidráulica 19/07/2008
Exportação de Energia de origem Térmica desde 11/12/2007
Total de Exportação Hidráulica = 12.549 MWh
Nº Horas mês = 730,56 ( 24h * 30,44dias)
Total de Exportação Hidráulica = 17 MWmed
Fonte: ONS
Área para Número do Slide
ARMAZENAMENTOS DA REGIÃO NORTE
2006
2007
2008
Área para Número do Slide
ARMAZENAMENTOS DA REGIÃO NORDESTE
2006
2007
2008
Área para Número do Slide
ARMAZENAMENTOS DA REGIÃO SUDESTE
2006
2007
2008
Área para Número do Slide
ARMAZENAMENTOS DA REGIÃO SUL
2006
2007
2008
Área para Número do Slide
FIM
Área para Número do Slide
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
janfevmarabrmaijunjulagosetoutnovdez
Armazenamentos no final do mês
EAR (%)
200320042005200620072008
114
358
428
418
434
517
493
-405
-1299
-184
425
416
115
-61
-619
-388
00
354
463
330
757
478
411
518
291
0
0
-1400
-1200
-1000
-800
-600
-400
-200
0
200
400
600
800
1000
1200
16-mai23-mai30-mai6-jun13-jun20-jun27-jun4-jul11-jul18-jul25-jul01-ago08-ago15-ago22-ago29-ago05-set12-set19-set
Ger. Térmica a partir de 10/mai
Ger. Hidráulica a partir de 21/mai
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
janfevmarabrmaijunjulagosetoutnovdez
Armazenamentos no final do mês
EAR (%)
200320042005200620072008
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
janfevmarabrmaijunjulagosetoutnovdez
Armazenamentos no final do mês
EAR (%)
200320042005200620072008
Estudo Prospectivo do ONS
ENA (% mlt)
Nov
74
Estudo Prospectivo ONS
ENA (%Mlt)
Nov
97
21
00
9
25
20
00
0
5
10
15
20
25
30
19-jul a 25/jul26-jul a 01/ago02-ago a 08/ago09-ago a 15/ago16-ago a 22/ago23-ago a 29/ago30-ago a 05/set06-set a 12/set13-set a 19/set
Int. Uruguai - UY
Uruguai
0 MWmed
Argentina
531 MWmed
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
janfevmarabrmaijunjulagosetoutnovdez
Armazenamentos no final do mês
EAR (%)
200320042005200620072008
613,52527,36687,71709,97661,80625,32627,41635,47
------------
-34,0450,5276,2076,2070,4176,8388,2191,37102,64110,35146,30138,69118,1379,1671,6493,55106,10119,11121,65
Custo da Exportação (R$/MWh)
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
janfevmarabrmaijunjulagosetoutnovdez
Armazenamentos no final do mês
EAR (%)
200320042005200620072008
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
janfevmarabrmaijunjulagosetoutnovdez
Armazenamentos no final do mês
EAR (%)
200320042005200620072008
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
janfevmarabrmaijunjulagosetoutnovdez
Armazenamentos no final do mês
EAR (%)
200320042005200620072008
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
janfevmarabrmaijunjulagosetoutnovdez
Armazenamentos no final do mês
EAR (%)
200320042005200620072008
Estudo Prospectivo ONS
ENA (%Mlt)
Nov
91
Estudo Prospectivo do ONS
ENA (% mlt)
Nov
65
Carga
8.283 MWmed
33,4
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
EAR (%)
VERIFICADO
CON
PMO Outubro
Rev. 01
ENA = 64% MLT
Ger. Hidráulica
7.013 MWmed
Ger. Térmica
646 MWmed
Interc. SE/S
6 MWmed
Ger. Eólica
87 MWmed
42,0
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
EAR (%)
CAR
VERIFICADO
PMO Outubro
Rev. 01
ENA = 86 % MLT
ANDE
0 MWmed
Recurso
Requisito
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
EAR (%)
CAR
VERIFICADO
PMO Outubro
Rev. 01
ENA = 102 % MLT
51,9
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
80,0
90,0
100,0
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
Jan
Fev
Mar
Abr
Mai
Jun
Jul
Ago
Set
Out
Nov
Dez
EAR (%)
CAR
VERIFICADO
PMO Outubro
Rev. 01
ENA = 65 % MLT
57,7
Outubro 2008 - Semana 1
Mérito
34%
GE
15%
Gfom/Gsub
6%
N. Desp.
14%
Inflex.
31%
Disp. total do SIN = 8820MW *
1234 MW
506 MW
1300 MW
2768 MW*
3090 MW*
* Valores previstos no deck
do Decomp
Outubro 2008 - Semana 2
Mérito
34%
GE
15%
Gfom/Gsub
6%
N. Desp.
14%
Inflex.
31%
Disp. total do SIN = 8820MW *
1234 MW
506 MW
1300 MW
2768 MW*
3090 MW*
* Valores previstos no deck
do Decomp