ORAMENTO
TERRENO 12X20m
1 LIMPEZA DO TERRENO
1.1-LIMPEZA (m) 240 m rea do terreno
1.2-TAPUME DA OBRA
TOTAL = 140,80m
FOLHA DE COMPENSADO (1,10x2,20)
64m lineares x 2,20 (altura)
TOTAL = 140,80m de madeira
QUANTIDADE (140,80 / 2,42 = 58,18 = 59 folhas
1.3-PLACA DA OBRA (m) 2m
1.4-BARRACO DA OBRA (m) = 3,63m
1.5-LOCAO DA OBRA (m) 94,50m
2. FUNDAO
2.1 - ESCAVAO MANUAL (m)
METROS LINERARES DAS PAREDES
8,90X2
8,45X2
4,35X1
3,50X1
3,45X2
1,85X1
3,00X1
TOTAL METROS LINEARES = 53,3m
SAPATA CORRIDA = 0,60 x 0,35 x 53,3
Volume= 11,19m
SAPATA ISOLADA = 0,60 x 0,60 x 0,35
Volume= 0,126m x 6 = 0,756m
TOTAL VOLUME= 11,946 m
7/23/2019 oramento civil
3/6
2.2- CONCRETO MAGRO (m)
Sapata isolada= 0,4 x 0,4 x 0,05 = 0,008x6 = 0,048m
Sapata corrida= 0,4 x 53,3 x 0,05 = 1,066 mTOTAL= 1,114m
2.3- CONCRETO ARMADO (m)
Sapata corrida= 0,09m x 53,3m = 4,797m
Sapata isolada= (aplicar frmulas) = 0,0345m x 6 = 0,207m
TOTAL = 5,004m
2.4- ALVENARIA DE 1 VEZ (m)
Altura = 0,30
Comprimento= 53,30
TOTAL= 15,99m
2.5RADIER
0,10 x 53,3 = 5,33m
2.6ATERRO DO CAIXO
8,45 x 8,90 x 0,40 = 30,08m
2.7- REATERRO APLICADO
Vreaterro = Vescavao
Vconcretom
Vconcretoa
Vreaterro = 11,9461,1145,004
Vreaterro = 5,828
2.8REMOO DO MATERIAL
VescavaoVreaterro = 11,9465,828
TOTAL = 6,118 (25%) = 7,6475 m
7/23/2019 oramento civil
4/6
3 ESTRUTURA
Portas
(1x) 0,90 x 2,10 = 1,89m(1x) 0,80 x 2,10 = 1,68m
(1x) 0,70 x 2,10 = 1,47m
(1x) 0,60 x 2,10 = 1,26m
TOTAL = 6,20m
Janelas
(4x) 1,50 x 1,00 = 6,00m
(1x) 1,35 x 0,50 = 0,675m
(1x) 2,50 x 0,50 = 1,25m
TOTAL= 7,925m
TOTAL= 14,225m
3.1 REA DE ALVENARIA
53,3x 2,50 = 139,75m
Tijolo da coberta
4x (4,60 x 1/2)
4 x 2,30 = 9,20 m
3.2 VERGAS E CONTRAVERGAS
3.2.1 VERGAS
Portas
0,90 + 0,20 = 1,10m
0,80 + 0,20 = 1,00m
0,70 + 0,20 = 0,90m
0,60 + 0,20 = 0,80m
7/23/2019 oramento civil
5/6
Janelas
4 x (1,5+0,30) = 7,20m
1,35 + 0,27 = 1,62m
2,50 + 0,50 = 3,00m
TOTAL = 15,62m
3.2.2 CONTRAVERGA
Janelas = Verga
11,82m
4 REVESTIMENTO
4.1 CHAPISCO
139,75 x 2 = 279,50m
4.2 REBOCO
COZINHA
12,60 X 2,50 = 31,50m
Porta = 1,47m
Janela = 1,25m
31,501,471,25 = 28,78m
BWC
10,30 x 2,50 = 25,75m
Porta = 1,26m
Janela = 0,675m
25,751,260,675 = 23,81m
TOTAL= 52,59m
4.3 AZULEJO
Azulejo = Reboco
52,59m
7/23/2019 oramento civil
6/6
4.4 MASSA NICA
139,7531,5025,75 = 82,50
139,75 + 82,50 = 222,25m
4.5 CHAPISCO TETO8,45 x 9,20 = 77,74m
4.6 FORRO DE GESSO
77,74m