1
MINISTÉRIO DO DESENVOLVIMENTO AGRÁRIO - MDA
INSTITUTO NACIONAL DE COLONIZAÇÃO E REFORMA AGRÁRIA - INCRA
SUPERINTENDÊNCIA REGIONAL DO RIO GRANDE DO SUL - SR 11 / RS
MEMORIAL DE CÁLCULO
SANTA MERCEDES – MANOEL VIANA
2
1. Apresentação ................................................................................................................ 3
2. Referências Normativas ............................................................................................... 3
3. Terminologia ................................................................................................................. 4
4. Demanda Hidráulica ................................................................................................. 5
5. Fator de Consumo .................................................................................................... 5
6. Perda de Carga .......................................................................................................... 6
7. Disposição Geral da Rede de Abastecimento ............................................................ 7
8. Comportamento da Rede............................................................................................. 7
3
1. Apresentação
Este memorial tem por finalidade apresentar as bases fundamentadas para o
dimensionamento e escolhas utilizadas no projeto do sistema de abastecimento de água do
assentamento Santa Mercedes, no Município de Manoel Viana - RS.
2. Referências Normativas
A presente especificação técnica possui referências nas seguintes normas:
2.1. Da ABNT:
NBR 5626 – Instalação predial de água fria.
NBR 12211 – Estudos de concepção de sistemas públicos de abastecimento de
água.
NBR 12212 – Projeto de poço para captação de água subterrânea.
NBR 12214 – Projeto de sistema de bombeamento de água para abastecimento
público.
NBR 12217 – Projeto de reservatório de distribuição de água para abastecimento
público.
NBR 12218 – Projeto de rede de distribuição de água para abastecimento
público.
NBR 12266 – Projeto e execução de valas para assentamento de tubulação de
água, esgoto ou drenagem urbana.
2.2. Da CORSAN/RS:
Regulamento dos Serviços de Água e de Esgoto (RSAE) - Resolução 1093 da
Agência Estadual de Regulação dos Serviços Públicos Delegados do Rio Grande
do Sul (AGERGS).
4
2.3. Do INCRA/RS:
Norma de Execução nº 54 – Dispõe sobre a implantação de obras de engenharia
componentes de infra-estrutura básica de projetos de assentamento.
2.4. Atualização:
Cada referência citada neste texto deve ser observada em sua edição em vigor, desde
que mantidos os mesmos objetivos da data de aprovação da presente Norma.
3. Terminologia
Para efeito deste memorial, são adotadas as seguintes definições:
REDE DE DISTRIBUIÇÃO - Parte do sistema de abastecimento formada de tubulações
e órgãos acessórios, destinada a colocar água potável à disposição dos consumidores, de
forma contínua, em quantidade e pressão recomendadas.
CONSUMO – Quantidade de água utilizada por uma unidade consumidora, expressa
em unidade de volume por unidade de tempo;
VAZÃO DE PROJETO – Vazão determinada para funcionamento da rede de
abastecimento na pior hipótese possível de trabalho, expressa em litros por segundo;
PRESSÃO ESTÁTICA – Pressão de trabalho da rede de abastecimento na hipótese de
consumo nulo, expresso em M.C.A. (metro de coluna d’água);
PRESSÃO DINÂMICA – Pressão de trabalho da rede de abastecimento na hipótese de
consumo não nulo, expresso em M.C.A. (metro de coluna d’água);
PERDA DE CARGA – Perda de pressão na rede de abastecimento devido ao atrito da
água com as tubulações e órgãos acessórios, expresso em m/km;
PROJETO EXECUTIVO - Conjunto dos elementos necessários e suficientes à
execução completa da obra, de acordo com as normas pertinentes da Associação Brasileira
de Normas Técnicas – ABNT.
5
4. Demanda Hidráulica
Será estabelecido um consumo por pessoa de 150l/dia (incluindo neste insumo perdas
de água, naturais nestes sistemas), projeção um pouco acima ao creditado a famílias em
zonas de características rurais.
Para fins de cálculo da demanda considerou-se a capacidade máxima do
Assentamento, considerando-se o número de lotes multiplicado por cinco. Portanto, a
população considerada é de 35 pessoas, com um consumo diário teórico total de 5,25 m³ de
água.
A vazão média teórica total no final do plano de atuação será de aproximadamente
(5.250 / 24 x 60 x 60) 0,06205 L/s, muito baixo em comparação a outros sistemas de
abastecimento de água.
Será creditada uma taxa sazonal e diária de pico de consumo de 1.5, razoável para o
tipo de consumo existente, tendo, portanto, um consumo de pico total teórico de
aproximadamente (0,06205 x 1.5) 0,09308L/s.
Como solicita a ABNT, será creditada uma taxa de erro de 1.2 ao cálculo de pico final,
concluindo que, teoricamente, a rede de abastecimento trabalhará no pior caso, com uma
vazão total de aproximadamente (0,09308 x 1.2) 0,11170L/s.
A perda de carga com a vazão requerida pelo sistema é baixa ao utilizar tubulações
de médio diâmetro nos trechos principais.
5. Fator de Consumo
Existem diferenças nas taxas de consumo de uma unidade consumidora de acordo
com o horário, mostrando seu pico durante o dia e baixo consumo durante a noite.
Tendo em vista esta variação, será estabelecido um fator de consumo em relação a
média diária de acordo com o horário analisado:
1:00h = 50% consumo diário;
2:00h = 40% consumo diário;
3:00h = 40% consumo diário;
4:00h = 60% consumo diário;
6
5:00h = 65% consumo diário;
6:00h = 70% consumo diário;
7:00h = 80% consumo diário;
8:00h = 85% consumo diário;
9:00h = 90% consumo diário;
10:00h = 130% consumo diário;
11:00h = 150% consumo diário;
12:00h = 180% consumo diário;
13:00h = 160% consumo diário;
14:00h = 140% consumo diário;
15:00h = 150% consumo diário;
16:00h = 160% consumo diário;
17:00h = 180% consumo diário;
18:00h = 130% consumo diário;
19:00h = 100% consumo diário;
20:00h = 90% consumo diário;
21:00h = 75% consumo diário;
22:00h = 60% consumo diário;
23:00h = 55% consumo diário;
24:00h = 50% consumo diário.
6. Perda de Carga
Para os cálculos de perda de carga foram utilizadas as formulas de Hazen-Williams.
O projeto foi concebido para ser executado em PVC, devido as baixas vazões
apresentadas, e nos cálculos foi atribuído um coeficiente de rugosidade para estas
tubulações de 130, caracterizadas para tubos já desgastados.
7
7. Disposição Geral da Rede de Abastecimento
Trecho (ID) Início (Nó) Fim (Nó) Comprimento (m) Diâmetro (mm)
T1 A-1 R1 1174 50
T2 R1 PV-01 102 75
T3 PV-01 U-03 353 75
T4 U-03 U-02 228 75
T5 U-02 U-01 91 75
T6 PV-01 DET-01 152 75
T7 DET-01 DET-02 209 75
T8 DET-02 U-04 469 75
T09 U-04 DET-03 37 75
T10 DET-03 DET-4 313 75
T11 DET-4 U-05 213 75
T12 U-05 U-06 187 75
T13 U-06 DET-05 283 75
T14 DET-05 U-07 278 75
T15 1 U-01 10 50
T16 U-02 2 20 50
T17 U-03 3 20 50
T18 U-04 4 10 50
T19 U-05 5 20 50
T20 U-06 6 10 50
T21 U-07 7 20 50
B-1 P1 A-1 - \
8. Comportamento da Rede
Resultado nos Nós às 0:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.02 116.04 44.04
8
2 0.02 116.04 44.04
3 0.02 116.04 36.04
4 0.02 116.04 42.04
5 0.02 116.04 32.04
6 0.02 116.04 33.04
7 0.02 116.04 25.04
U-01 0.00 116.04 44.04
U-02 0.00 116.04 43.04
U-03 0.00 116.04 35.04
U-04 0.00 116.04 41.04
U-05 0.00 116.04 33.04
U-06 0.00 116.04 32.04
U-07 0.00 116.04 25.04
DET-01 0.00 116.04 2.04
DET-02 0.00 116.04 6.04
DET-03 0.00 116.04 41.04
DET-4 0.00 116.04 38.04
DET-05 0.00 116.04 31.04
PV-01 0.00 116.05 5.05
A-1 0.00 120.29 64.29
P1 -0.66 56.00 0.00
R1 0.55 116.05 8.05
Resultado nos Trechos às 0:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.11 0.02 0.02
T3 0.05 0.01 0.00
T4 0.03 0.01 0.00
T5 0.02 0.00 0.00
T6 0.06 0.01 0.01
T7 0.06 0.01 0.01
T8 0.06 0.01 0.01
T09 0.05 0.01 0.00
T10 0.05 0.01 0.00
T11 0.05 0.01 0.00
T12 0.03 0.01 0.00
T13 0.02 0.00 0.00
T14 0.02 0.00 0.00
T15 -0.02 0.01 0.00
T16 0.02 0.01 0.00
T17 0.02 0.01 0.00
T18 0.02 0.01 0.00
T19 0.02 0.01 0.00
T20 0.02 0.01 0.00
T21 0.02 0.01 0.00
B-1 0.66 0.00 -64.29
9
Resultado nos Nós às 1:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.01 116.04 44.04
2 0.01 116.04 44.04
3 0.01 116.04 36.04
4 0.01 116.04 42.04
5 0.01 116.04 32.04
6 0.01 116.04 33.04
7 0.01 116.04 25.04
U-01 0.00 116.04 44.04
U-02 0.00 116.04 43.04
U-03 0.00 116.04 35.04
U-04 0.00 116.04 41.04
U-05 0.00 116.04 33.04
U-06 0.00 116.04 32.04
U-07 0.00 116.04 25.04
DET-01 0.00 116.04 2.04
DET-02 0.00 116.04 6.04
DET-03 0.00 116.04 41.04
DET-4 0.00 116.04 38.04
DET-05 0.00 116.04 31.04
PV-01 0.00 116.04 5.04
A-1 0.00 120.28 64.28
P1 -0.66 56.00 0.00
R1 0.57 116.05 8.05
Resultado nos Trechos às 1:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.09 0.02 0.01
T3 0.04 0.01 0.00
T4 0.03 0.01 0.00
T5 0.01 0.00 0.00
T6 0.05 0.01 0.00
T7 0.05 0.01 0.00
T8 0.05 0.01 0.00
T09 0.04 0.01 0.00
T10 0.04 0.01 0.00
T11 0.04 0.01 0.00
T12 0.03 0.01 0.00
T13 0.01 0.00 0.00
T14 0.01 0.00 0.00
T15 -0.01 0.01 0.00
T16 0.01 0.01 0.00
T17 0.01 0.01 0.00
T18 0.01 0.01 0.00
T19 0.01 0.01 0.00
T20 0.01 0.01 0.00
10
T21 0.01 0.01 0.00
B-1 0.66 0.00 -64.28
Resultado nos Nós às 2:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.01 116.06 44.06
2 0.01 116.06 44.06
3 0.01 116.06 36.06
4 0.01 116.06 42.06
5 0.01 116.05 32.05
6 0.01 116.05 33.05
7 0.01 116.05 25.05
U-01 0.00 116.06 44.06
U-02 0.00 116.06 43.06
U-03 0.00 116.06 35.06
U-04 0.00 116.06 41.06
U-05 0.00 116.05 33.05
U-06 0.00 116.05 32.05
U-07 0.00 116.05 25.05
DET-01 0.00 116.06 2.06
DET-02 0.00 116.06 6.06
DET-03 0.00 116.06 41.06
DET-4 0.00 116.05 38.05
DET-05 0.00 116.05 31.05
PV-01 0.00 116.06 5.06
A-1 0.00 120.30 64.30
P1 -0.66 56.00 0.00
R1 0.57 116.06 8.06
Resultado nos Trechos às 2:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.33 3.61
T2 0.09 0.02 0.01
T3 0.04 0.01 0.00
T4 0.03 0.01 0.00
T5 0.01 0.00 0.00
T6 0.05 0.01 0.00
T7 0.05 0.01 0.00
T8 0.05 0.01 0.00
T09 0.04 0.01 0.00
T10 0.04 0.01 0.00
T11 0.04 0.01 0.00
T12 0.03 0.01 0.00
T13 0.01 0.00 0.00
T14 0.01 0.00 0.00
T15 -0.01 0.01 0.00
T16 0.01 0.01 0.00
T17 0.01 0.01 0.00
T18 0.01 0.01 0.00
T19 0.01 0.01 0.00
T20 0.01 0.01 0.00
11
T21 0.01 0.01 0.00
B-1 0.66 0.00 -64.30
Resultado nos Nós às 3:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.02 116.05 44.05
2 0.02 116.05 44.05
3 0.02 116.05 36.05
4 0.02 116.05 42.05
5 0.02 116.05 32.05
6 0.02 116.04 33.04
7 0.02 116.04 25.04
U-01 0.00 116.05 44.05
U-02 0.00 116.05 43.05
U-03 0.00 116.05 35.05
U-04 0.00 116.05 41.05
U-05 0.00 116.05 33.05
U-06 0.00 116.04 32.04
U-07 0.00 116.04 25.04
DET-01 0.00 116.05 2.05
DET-02 0.00 116.05 6.05
DET-03 0.00 116.05 41.05
DET-4 0.00 116.05 38.05
DET-05 0.00 116.04 31.04
PV-01 0.00 116.06 5.06
A-1 0.00 120.30 64.30
P1 -0.66 56.00 0.00
R1 0.53 116.06 8.06
Resultado nos Trechos às 3:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.13 0.03 0.03
T3 0.06 0.01 0.01
T4 0.04 0.01 0.00
T5 0.02 0.00 0.00
T6 0.08 0.02 0.01
T7 0.08 0.02 0.01
T8 0.08 0.02 0.01
T09 0.06 0.01 0.01
T10 0.06 0.01 0.01
T11 0.06 0.01 0.01
T12 0.04 0.01 0.00
T13 0.02 0.00 0.00
T14 0.02 0.00 0.00
T15 -0.02 0.01 0.01
T16 0.02 0.01 0.01
T17 0.02 0.01 0.00
T18 0.02 0.01 0.00
T19 0.02 0.01 0.00
T20 0.02 0.01 0.00
12
T21 0.02 0.01 0.01
B-1 0.66 0.00 -64.30
Resultado nos Nós às 4:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.02 116.02 44.02
2 0.02 116.02 44.02
3 0.02 116.02 36.02
4 0.02 116.02 42.02
5 0.02 116.01 32.01
6 0.02 116.01 33.01
7 0.02 116.01 25.01
U-01 0.00 116.02 44.02
U-02 0.00 116.02 43.02
U-03 0.00 116.02 35.02
U-04 0.00 116.02 41.02
U-05 0.00 116.01 33.01
U-06 0.00 116.01 32.01
U-07 0.00 116.01 25.01
DET-01 0.00 116.02 2.02
DET-02 0.00 116.02 6.02
DET-03 0.00 116.02 41.02
DET-4 0.00 116.02 38.02
DET-05 0.00 116.01 31.01
PV-01 0.00 116.03 5.03
A-1 0.00 120.27 64.27
P1 -0.66 56.00 0.00
R1 0.52 116.03 8.03
Resultado nos Trechos às 4:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.14 0.03 0.03
T3 0.06 0.01 0.01
T4 0.04 0.01 0.00
T5 0.02 0.00 0.00
T6 0.08 0.02 0.01
T7 0.08 0.02 0.01
T8 0.08 0.02 0.01
T09 0.06 0.01 0.01
T10 0.06 0.01 0.01
T11 0.06 0.01 0.01
T12 0.04 0.01 0.00
T13 0.02 0.00 0.00
T14 0.02 0.00 0.00
T15 -0.02 0.01 0.01
T16 0.02 0.01 0.01
T17 0.02 0.01 0.01
T18 0.02 0.01 0.01
T19 0.02 0.01 0.01
T20 0.02 0.01 0.01
13
T21 0.02 0.01 0.01
B-1 0.66 0.00 -64.27
Resultado nos Nós às 5:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.02 116.02 44.02
2 0.02 116.02 44.02
3 0.02 116.02 36.02
4 0.02 116.02 42.02
5 0.02 116.01 32.01
6 0.02 116.01 33.01
7 0.02 116.01 25.01
U-01 0.00 116.02 44.02
U-02 0.00 116.02 43.02
U-03 0.00 116.02 35.02
U-04 0.00 116.02 41.02
U-05 0.00 116.01 33.01
U-06 0.00 116.01 32.01
U-07 0.00 116.01 25.01
DET-01 0.00 116.02 2.02
DET-02 0.00 116.02 6.02
DET-03 0.00 116.02 41.02
DET-4 0.00 116.01 38.01
DET-05 0.00 116.01 31.01
PV-01 0.00 116.03 5.03
A-1 0.00 120.27 64.27
P1 -0.66 56.00 0.00
R1 0.50 116.03 8.03
Resultado nos Trechos às 5:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.15 0.03 0.03
T3 0.07 0.01 0.01
T4 0.04 0.01 0.00
T5 0.02 0.00 0.00
T6 0.09 0.02 0.01
T7 0.09 0.02 0.01
T8 0.09 0.02 0.01
T09 0.07 0.01 0.01
T10 0.07 0.01 0.01
T11 0.07 0.01 0.01
T12 0.04 0.01 0.00
T13 0.02 0.00 0.00
T14 0.02 0.00 0.00
T15 -0.02 0.01 0.01
T16 0.02 0.01 0.01
T17 0.02 0.01 0.01
T18 0.02 0.01 0.01
T19 0.02 0.01 0.01
T20 0.02 0.01 0.01
14
T21 0.02 0.01 0.01
B-1 0.66 0.00 -64.27
Resultado nos Nós às 6:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.03 116.01 44.01
2 0.03 116.01 44.01
3 0.03 116.02 36.02
4 0.03 116.01 42.01
5 0.03 116.00 32.00
6 0.03 116.00 33.00
7 0.03 116.00 25.00
U-01 0.00 116.01 44.01
U-02 0.00 116.01 43.01
U-03 0.00 116.02 35.02
U-04 0.00 116.01 41.01
U-05 0.00 116.00 33.00
U-06 0.00 116.00 32.00
U-07 0.00 116.00 25.00
DET-01 0.00 116.02 2.02
DET-02 0.00 116.01 6.01
DET-03 0.00 116.01 41.01
DET-4 0.00 116.00 38.00
DET-05 0.00 116.00 31.00
PV-01 0.00 116.02 5.02
A-1 0.00 120.26 64.26
P1 -0.66 56.00 0.00
R1 0.48 116.02 8.02
Resultado nos Trechos às 6:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.17 0.04 0.04
T3 0.08 0.02 0.01
T4 0.05 0.01 0.00
T5 0.03 0.01 0.00
T6 0.10 0.02 0.02
T7 0.10 0.02 0.02
T8 0.10 0.02 0.02
T09 0.08 0.02 0.01
T10 0.08 0.02 0.01
T11 0.08 0.02 0.01
T12 0.05 0.01 0.00
T13 0.03 0.01 0.00
T14 0.03 0.01 0.00
T15 -0.03 0.01 0.01
T16 0.03 0.01 0.01
T17 0.03 0.01 0.01
T18 0.03 0.01 0.01
T19 0.03 0.01 0.01
T20 0.03 0.01 0.01
15
T21 0.03 0.01 0.01
B-1 0.66 0.00 -64.26
Resultado nos Nós às 7:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.03 116.00 44.00
2 0.03 116.00 44.00
3 0.03 116.00 36.00
4 0.03 115.99 41.99
5 0.03 115.99 31.99
6 0.03 115.99 32.99
7 0.03 115.99 24.99
U-01 0.00 116.00 44.00
U-02 0.00 116.00 43.00
U-03 0.00 116.00 35.00
U-04 0.00 115.99 40.99
U-05 0.00 115.99 32.99
U-06 0.00 115.99 31.99
U-07 0.00 115.99 24.99
DET-01 0.00 116.01 2.01
DET-02 0.00 116.00 6.00
DET-03 0.00 115.99 40.99
DET-4 0.00 115.99 37.99
DET-05 0.00 115.99 30.99
PV-01 0.00 116.01 5.01
A-1 0.00 120.25 64.25
P1 -0.66 56.00 0.00
R1 0.47 116.01 8.01
Resultado nos Trechos às 7:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.19 0.04 0.05
T3 0.08 0.02 0.01
T4 0.05 0.01 0.00
T5 0.03 0.01 0.00
T6 0.11 0.02 0.02
T7 0.11 0.02 0.02
T8 0.11 0.02 0.02
T09 0.08 0.02 0.01
T10 0.08 0.02 0.01
T11 0.08 0.02 0.01
T12 0.05 0.01 0.00
T13 0.03 0.01 0.00
T14 0.03 0.01 0.00
T15 -0.03 0.01 0.01
T16 0.03 0.01 0.01
T17 0.03 0.01 0.01
T18 0.03 0.01 0.01
T19 0.03 0.01 0.01
T20 0.03 0.01 0.01
16
T21 0.03 0.01 0.01
B-1 0.66 0.00 -64.25
Resultado nos Nós às 8:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.03 116.00 44.00
2 0.03 116.00 44.00
3 0.03 116.00 36.00
4 0.03 115.99 41.99
5 0.03 115.98 31.98
6 0.03 115.98 32.98
7 0.03 115.98 24.98
U-01 0.00 116.00 44.00
U-02 0.00 116.00 43.00
U-03 0.00 116.00 35.00
U-04 0.00 115.99 40.99
U-05 0.00 115.98 32.98
U-06 0.00 115.98 31.98
U-07 0.00 115.98 24.98
DET-01 0.00 116.00 2.00
DET-02 0.00 116.00 6.00
DET-03 0.00 115.99 40.99
DET-4 0.00 115.99 37.99
DET-05 0.00 115.98 30.98
PV-01 0.00 116.01 5.01
A-1 0.00 120.25 64.25
P1 -0.66 56.00 0.00
R1 0.46 116.01 8.01
Resultado nos Trechos às 8:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.20 0.04 0.05
T3 0.08 0.02 0.01
T4 0.06 0.01 0.01
T5 0.03 0.01 0.00
T6 0.11 0.03 0.02
T7 0.11 0.03 0.02
T8 0.11 0.03 0.02
T09 0.08 0.02 0.01
T10 0.08 0.02 0.01
T11 0.08 0.02 0.01
T12 0.06 0.01 0.01
T13 0.03 0.01 0.00
T14 0.03 0.01 0.00
T15 -0.03 0.01 0.01
T16 0.03 0.01 0.01
T17 0.03 0.01 0.01
T18 0.03 0.01 0.01
T19 0.03 0.01 0.01
T20 0.03 0.01 0.01
17
T21 0.03 0.01 0.01
B-1 0.66 0.00 -64.25
Resultado nos Nós às 9:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.04 115.99 43.99
2 0.04 115.99 43.99
3 0.04 115.99 35.99
4 0.04 115.96 41.96
5 0.04 115.95 31.95
6 0.04 115.95 32.95
7 0.04 115.95 24.95
U-01 0.00 115.99 43.99
U-02 0.00 115.99 42.99
U-03 0.00 115.99 34.99
U-04 0.00 115.97 40.97
U-05 0.00 115.95 32.95
U-06 0.00 115.95 31.95
U-07 0.00 115.95 24.95
DET-01 0.00 115.99 1.99
DET-02 0.00 115.98 5.98
DET-03 0.00 115.96 40.96
DET-4 0.00 115.96 37.96
DET-05 0.00 115.95 30.95
PV-01 0.00 116.00 5.00
A-1 0.00 120.25 64.25
P1 -0.66 56.00 0.00
R1 0.37 116.01 8.01
Resultado nos Trechos às 9:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.28 0.06 0.11
T3 0.12 0.03 0.02
T4 0.08 0.02 0.01
T5 0.04 0.01 0.00
T6 0.16 0.04 0.04
T7 0.16 0.04 0.04
T8 0.16 0.04 0.04
T09 0.12 0.03 0.02
T10 0.12 0.03 0.02
T11 0.12 0.03 0.02
T12 0.08 0.02 0.01
T13 0.04 0.01 0.00
T14 0.04 0.01 0.00
T15 -0.04 0.02 0.02
T16 0.04 0.02 0.02
T17 0.04 0.02 0.02
T18 0.04 0.02 0.02
T19 0.04 0.02 0.02
T20 0.04 0.02 0.02
18
T21 0.04 0.02 0.02
B-1 0.66 0.00 -64.25
Resultado nos Nós às 10:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.05 115.95 43.95
2 0.05 115.95 43.95
3 0.05 115.95 35.95
4 0.05 115.92 41.92
5 0.05 115.90 31.90
6 0.05 115.90 32.90
7 0.05 115.90 24.90
U-01 0.00 115.95 43.95
U-02 0.00 115.95 42.95
U-03 0.00 115.95 34.95
U-04 0.00 115.92 40.92
U-05 0.00 115.90 32.90
U-06 0.00 115.90 31.90
U-07 0.00 115.90 24.90
DET-01 0.00 115.95 1.95
DET-02 0.00 115.94 5.94
DET-03 0.00 115.92 40.92
DET-4 0.00 115.91 37.91
DET-05 0.00 115.90 30.90
PV-01 0.00 115.96 4.96
A-1 0.00 120.22 64.22
P1 -0.66 56.00 0.00
R1 0.33 115.98 7.98
Resultado nos Trechos às 10:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.33 0.07 0.14
T3 0.14 0.03 0.03
T4 0.09 0.02 0.01
T5 0.05 0.01 0.00
T6 0.19 0.04 0.05
T7 0.19 0.04 0.05
T8 0.19 0.04 0.05
T09 0.14 0.03 0.03
T10 0.14 0.03 0.03
T11 0.14 0.03 0.03
T12 0.09 0.02 0.01
T13 0.05 0.01 0.00
T14 0.05 0.01 0.00
T15 -0.05 0.02 0.03
T16 0.05 0.02 0.03
T17 0.05 0.02 0.03
T18 0.05 0.02 0.03
T19 0.05 0.02 0.03
T20 0.05 0.02 0.03
19
T21 0.05 0.02 0.03
B-1 0.66 0.00 -64.22
Resultado nos Nós às 11:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.06 115.96 43.96
2 0.06 115.96 43.96
3 0.06 115.96 35.96
4 0.06 115.92 41.92
5 0.06 115.90 31.90
6 0.06 115.89 32.89
7 0.06 115.89 24.89
U-01 0.00 115.96 43.96
U-02 0.00 115.96 42.96
U-03 0.00 115.96 34.96
U-04 0.00 115.92 40.92
U-05 0.00 115.90 32.90
U-06 0.00 115.89 31.89
U-07 0.00 115.89 24.89
DET-01 0.00 115.97 1.97
DET-02 0.00 115.95 5.95
DET-03 0.00 115.92 40.92
DET-4 0.00 115.91 37.91
DET-05 0.00 115.89 30.89
PV-01 0.00 115.98 4.98
A-1 0.00 120.24 64.24
P1 -0.66 56.00 0.00
R1 0.26 116.00 8.00
Resultado nos Trechos às 11:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.39 0.09 0.19
T3 0.17 0.04 0.04
T4 0.11 0.03 0.02
T5 0.06 0.01 0.01
T6 0.23 0.05 0.07
T7 0.23 0.05 0.07
T8 0.23 0.05 0.07
T09 0.17 0.04 0.04
T10 0.17 0.04 0.04
T11 0.17 0.04 0.04
T12 0.11 0.03 0.02
T13 0.06 0.01 0.01
T14 0.06 0.01 0.01
T15 -0.06 0.03 0.04
T16 0.06 0.03 0.04
T17 0.06 0.03 0.04
T18 0.06 0.03 0.04
T19 0.06 0.03 0.04
T20 0.06 0.03 0.04
20
T21 0.06 0.03 0.04
B-1 0.66 0.00 -64.24
Resultado nos Nós às 12:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.05 115.95 43.95
2 0.05 115.95 43.95
3 0.05 115.96 35.96
4 0.05 115.92 41.92
5 0.05 115.90 31.90
6 0.05 115.90 32.90
7 0.05 115.90 24.90
U-01 0.00 115.95 43.95
U-02 0.00 115.95 42.95
U-03 0.00 115.96 34.96
U-04 0.00 115.92 40.92
U-05 0.00 115.90 32.90
U-06 0.00 115.90 31.90
U-07 0.00 115.90 24.90
DET-01 0.00 115.96 1.96
DET-02 0.00 115.95 5.95
DET-03 0.00 115.92 40.92
DET-4 0.00 115.91 37.91
DET-05 0.00 115.90 30.90
PV-01 0.00 115.97 4.97
A-1 0.00 120.23 64.23
P1 -0.66 56.00 0.00
R1 0.31 115.98 7.98
Resultado nos Trechos às 12:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.35 0.08 0.16
T3 0.15 0.03 0.03
T4 0.10 0.02 0.02
T5 0.05 0.01 0.00
T6 0.20 0.05 0.06
T7 0.20 0.05 0.06
T8 0.20 0.05 0.06
T09 0.15 0.03 0.03
T10 0.15 0.03 0.03
T11 0.15 0.03 0.03
T12 0.10 0.02 0.02
T13 0.05 0.01 0.00
T14 0.05 0.01 0.00
T15 -0.05 0.03 0.03
T16 0.05 0.03 0.03
T17 0.05 0.03 0.03
T18 0.05 0.03 0.03
T19 0.05 0.03 0.03
T20 0.05 0.03 0.03
21
T21 0.05 0.03 0.03
B-1 0.66 0.00 -64.23
Resultado nos Nós às 13:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.04 115.97 43.97
2 0.04 115.97 43.97
3 0.04 115.97 35.97
4 0.04 115.94 41.94
5 0.04 115.93 31.93
6 0.04 115.93 32.93
7 0.04 115.92 24.92
U-01 0.00 115.97 43.97
U-02 0.00 115.97 42.97
U-03 0.00 115.97 34.97
U-04 0.00 115.94 40.94
U-05 0.00 115.93 32.93
U-06 0.00 115.93 31.93
U-07 0.00 115.93 24.93
DET-01 0.00 115.97 1.97
DET-02 0.00 115.96 5.96
DET-03 0.00 115.94 40.94
DET-4 0.00 115.93 37.93
DET-05 0.00 115.93 30.93
PV-01 0.00 115.98 4.98
A-1 0.00 120.23 64.23
P1 -0.66 56.00 0.00
R1 0.35 115.99 7.99
Resultado nos Trechos às 13:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.31 0.07 0.12
T3 0.13 0.03 0.03
T4 0.09 0.02 0.01
T5 0.04 0.01 0.00
T6 0.17 0.04 0.04
T7 0.17 0.04 0.04
T8 0.17 0.04 0.04
T09 0.13 0.03 0.03
T10 0.13 0.03 0.03
T11 0.13 0.03 0.03
T12 0.09 0.02 0.01
T13 0.04 0.01 0.00
T14 0.04 0.01 0.00
T15 -0.04 0.02 0.02
T16 0.04 0.02 0.02
T17 0.04 0.02 0.02
T18 0.04 0.02 0.02
T19 0.04 0.02 0.02
T20 0.04 0.02 0.02
22
T21 0.04 0.02 0.02
B-1 0.66 0.00 -64.23
Resultado nos Nós às 14:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.05 115.96 43.96
2 0.05 115.96 43.96
3 0.05 115.96 35.96
4 0.05 115.93 41.93
5 0.05 115.91 31.91
6 0.05 115.91 32.91
7 0.05 115.91 24.91
U-01 0.00 115.96 43.96
U-02 0.00 115.96 42.96
U-03 0.00 115.96 34.96
U-04 0.00 115.93 40.93
U-05 0.00 115.91 32.91
U-06 0.00 115.91 31.91
U-07 0.00 115.91 24.91
DET-01 0.00 115.96 1.96
DET-02 0.00 115.95 5.95
DET-03 0.00 115.93 40.93
DET-4 0.00 115.92 37.92
DET-05 0.00 115.91 30.91
PV-01 0.00 115.97 4.97
A-1 0.00 120.23 64.23
P1 -0.66 56.00 0.00
R1 0.33 115.98 7.98
Resultado nos Trechos às 14:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.33 0.07 0.14
T3 0.14 0.03 0.03
T4 0.09 0.02 0.01
T5 0.05 0.01 0.00
T6 0.19 0.04 0.05
T7 0.19 0.04 0.05
T8 0.19 0.04 0.05
T09 0.14 0.03 0.03
T10 0.14 0.03 0.03
T11 0.14 0.03 0.03
T12 0.09 0.02 0.01
T13 0.05 0.01 0.00
T14 0.05 0.01 0.00
T15 -0.05 0.02 0.03
T16 0.05 0.02 0.03
T17 0.05 0.02 0.03
T18 0.05 0.02 0.03
T19 0.05 0.02 0.03
T20 0.05 0.02 0.03
23
T21 0.05 0.02 0.03
B-1 0.66 0.00 -64.23
Resultado nos Nós às 15:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.05 115.96 43.96
2 0.05 115.96 43.96
3 0.05 115.96 35.96
4 0.05 115.93 41.93
5 0.05 115.91 31.91
6 0.05 115.91 32.91
7 0.05 115.90 24.90
U-01 0.00 115.96 43.96
U-02 0.00 115.96 42.96
U-03 0.00 115.96 34.96
U-04 0.00 115.93 40.93
U-05 0.00 115.91 32.91
U-06 0.00 115.91 31.91
U-07 0.00 115.90 24.90
DET-01 0.00 115.97 1.97
DET-02 0.00 115.95 5.95
DET-03 0.00 115.93 40.93
DET-4 0.00 115.92 37.92
DET-05 0.00 115.91 30.91
PV-01 0.00 115.97 4.97
A-1 0.00 120.23 64.23
P1 -0.66 56.00 0.00
R1 0.31 115.99 7.99
Resultado nos Trechos às 15:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.35 0.08 0.16
T3 0.15 0.03 0.03
T4 0.10 0.02 0.02
T5 0.05 0.01 0.00
T6 0.20 0.05 0.06
T7 0.20 0.05 0.06
T8 0.20 0.05 0.06
T09 0.15 0.03 0.03
T10 0.15 0.03 0.03
T11 0.15 0.03 0.03
T12 0.10 0.02 0.02
T13 0.05 0.01 0.00
T14 0.05 0.01 0.00
T15 -0.05 0.03 0.03
T16 0.05 0.03 0.03
T17 0.05 0.03 0.03
T18 0.05 0.03 0.03
T19 0.05 0.03 0.03
T20 0.05 0.03 0.03
24
T21 0.05 0.03 0.03
B-1 0.66 0.00 -64.23
Resultado nos Nós às 16:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.06 115.95 43.95
2 0.06 115.95 43.95
3 0.06 115.95 35.95
4 0.06 115.91 41.91
5 0.06 115.88 31.88
6 0.06 115.88 32.88
7 0.06 115.88 24.88
U-01 0.00 115.95 43.95
U-02 0.00 115.95 42.95
U-03 0.00 115.95 34.95
U-04 0.00 115.91 40.91
U-05 0.00 115.89 32.89
U-06 0.00 115.88 31.88
U-07 0.00 115.88 24.88
DET-01 0.00 115.95 1.95
DET-02 0.00 115.94 5.94
DET-03 0.00 115.91 40.91
DET-4 0.00 115.89 37.89
DET-05 0.00 115.88 30.88
PV-01 0.00 115.96 4.96
A-1 0.00 120.23 64.23
P1 -0.66 56.00 0.00
R1 0.26 115.98 7.98
Resultado nos Trechos às 16:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.39 0.09 0.19
T3 0.17 0.04 0.04
T4 0.11 0.03 0.02
T5 0.06 0.01 0.01
T6 0.23 0.05 0.07
T7 0.23 0.05 0.07
T8 0.23 0.05 0.07
T09 0.17 0.04 0.04
T10 0.17 0.04 0.04
T11 0.17 0.04 0.04
T12 0.11 0.03 0.02
T13 0.06 0.01 0.01
T14 0.06 0.01 0.01
T15 -0.06 0.03 0.04
T16 0.06 0.03 0.04
T17 0.06 0.03 0.04
T18 0.06 0.03 0.04
T19 0.06 0.03 0.04
T20 0.06 0.03 0.04
25
T21 0.06 0.03 0.04
B-1 0.66 0.00 -64.23
Resultado nos Nós às 17:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.04 115.98 43.98
2 0.04 115.98 43.98
3 0.04 115.98 35.98
4 0.04 115.96 41.96
5 0.04 115.95 31.95
6 0.04 115.95 32.95
7 0.04 115.94 24.94
U-01 0.00 115.98 43.98
U-02 0.00 115.98 42.98
U-03 0.00 115.98 34.98
U-04 0.00 115.96 40.96
U-05 0.00 115.95 32.95
U-06 0.00 115.95 31.95
U-07 0.00 115.95 24.95
DET-01 0.00 115.99 1.99
DET-02 0.00 115.98 5.98
DET-03 0.00 115.96 40.96
DET-4 0.00 115.95 37.95
DET-05 0.00 115.95 30.95
PV-01 0.00 115.99 4.99
A-1 0.00 120.24 64.24
P1 -0.66 56.00 0.00
R1 0.37 116.00 8.00
Resultado nos Trechos às 17:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.28 0.06 0.11
T3 0.12 0.03 0.02
T4 0.08 0.02 0.01
T5 0.04 0.01 0.00
T6 0.16 0.04 0.04
T7 0.16 0.04 0.04
T8 0.16 0.04 0.04
T09 0.12 0.03 0.02
T10 0.12 0.03 0.02
T11 0.12 0.03 0.02
T12 0.08 0.02 0.01
T13 0.04 0.01 0.00
T14 0.04 0.01 0.00
T15 -0.04 0.02 0.02
T16 0.04 0.02 0.02
T17 0.04 0.02 0.02
T18 0.04 0.02 0.02
T19 0.04 0.02 0.02
T20 0.04 0.02 0.02
26
T21 0.04 0.02 0.02
B-1 0.66 0.00 -64.24
Resultado nos Nós às 18:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.03 115.97 43.97
2 0.03 115.97 43.97
3 0.03 115.97 35.97
4 0.03 115.95 41.95
5 0.03 115.95 31.95
6 0.03 115.94 32.94
7 0.03 115.94 24.94
U-01 0.00 115.97 43.97
U-02 0.00 115.97 42.97
U-03 0.00 115.97 34.97
U-04 0.00 115.95 40.95
U-05 0.00 115.95 32.95
U-06 0.00 115.94 31.94
U-07 0.00 115.94 24.94
DET-01 0.00 115.97 1.97
DET-02 0.00 115.96 5.96
DET-03 0.00 115.95 40.95
DET-4 0.00 115.95 37.95
DET-05 0.00 115.94 30.94
PV-01 0.00 115.97 4.97
A-1 0.00 120.22 64.22
P1 -0.66 56.00 0.00
R1 0.44 115.98 7.98
Resultado nos Trechos às 18:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.22 0.05 0.07
T3 0.09 0.02 0.01
T4 0.06 0.01 0.01
T5 0.03 0.01 0.00
T6 0.12 0.03 0.02
T7 0.12 0.03 0.02
T8 0.12 0.03 0.02
T09 0.09 0.02 0.01
T10 0.09 0.02 0.01
T11 0.09 0.02 0.01
T12 0.06 0.01 0.01
T13 0.03 0.01 0.00
T14 0.03 0.01 0.00
T15 -0.03 0.02 0.01
T16 0.03 0.02 0.01
T17 0.03 0.02 0.01
T18 0.03 0.02 0.01
T19 0.03 0.02 0.01
T20 0.03 0.02 0.01
27
T21 0.03 0.02 0.01
B-1 0.66 0.00 -64.22
Resultado nos Nós às 19:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.03 116.00 44.00
2 0.03 116.00 44.00
3 0.03 116.00 36.00
4 0.03 115.99 41.99
5 0.03 115.99 31.99
6 0.03 115.98 32.98
7 0.03 115.98 24.98
U-01 0.00 116.00 44.00
U-02 0.00 116.00 43.00
U-03 0.00 116.00 35.00
U-04 0.00 115.99 40.99
U-05 0.00 115.99 32.99
U-06 0.00 115.98 31.98
U-07 0.00 115.98 24.98
DET-01 0.00 116.00 2.00
DET-02 0.00 116.00 6.00
DET-03 0.00 115.99 40.99
DET-4 0.00 115.99 37.99
DET-05 0.00 115.98 30.98
PV-01 0.00 116.01 5.01
A-1 0.00 120.25 64.25
P1 -0.66 56.00 0.00
R1 0.46 116.01 8.01
Resultado nos Trechos às 19:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.20 0.04 0.05
T3 0.08 0.02 0.01
T4 0.06 0.01 0.01
T5 0.03 0.01 0.00
T6 0.11 0.03 0.02
T7 0.11 0.03 0.02
T8 0.11 0.03 0.02
T09 0.08 0.02 0.01
T10 0.08 0.02 0.01
T11 0.08 0.02 0.01
T12 0.06 0.01 0.01
T13 0.03 0.01 0.00
T14 0.03 0.01 0.00
T15 -0.03 0.01 0.01
T16 0.03 0.01 0.01
T17 0.03 0.01 0.01
T18 0.03 0.01 0.01
T19 0.03 0.01 0.01
T20 0.03 0.01 0.01
28
T21 0.03 0.01 0.01
B-1 0.66 0.00 -64.25
Resultado nos Nós às 20:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.02 116.00 44.00
2 0.02 116.00 44.00
3 0.02 116.00 36.00
4 0.02 115.99 41.99
5 0.02 115.99 31.99
6 0.02 115.99 32.99
7 0.02 115.99 24.99
U-01 0.00 116.00 44.00
U-02 0.00 116.00 43.00
U-03 0.00 116.00 35.00
U-04 0.00 115.99 40.99
U-05 0.00 115.99 32.99
U-06 0.00 115.99 31.99
U-07 0.00 115.99 24.99
DET-01 0.00 116.00 2.00
DET-02 0.00 116.00 6.00
DET-03 0.00 115.99 40.99
DET-4 0.00 115.99 37.99
DET-05 0.00 115.99 30.99
PV-01 0.00 116.00 5.00
A-1 0.00 120.25 64.25
P1 -0.66 56.00 0.00
R1 0.49 116.01 8.01
Resultado nos Trechos às 20:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.16 0.04 0.04
T3 0.07 0.02 0.01
T4 0.05 0.01 0.00
T5 0.02 0.01 0.00
T6 0.09 0.02 0.01
T7 0.09 0.02 0.01
T8 0.09 0.02 0.01
T09 0.07 0.02 0.01
T10 0.07 0.02 0.01
T11 0.07 0.02 0.01
T12 0.05 0.01 0.00
T13 0.02 0.01 0.00
T14 0.02 0.01 0.00
T15 -0.02 0.01 0.01
T16 0.02 0.01 0.01
T17 0.02 0.01 0.01
T18 0.02 0.01 0.01
T19 0.02 0.01 0.01
T20 0.02 0.01 0.01
29
T21 0.02 0.01 0.01
B-1 0.66 0.00 -64.25
Resultado nos Nós às 21:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.02 116.02 44.02
2 0.02 116.02 44.02
3 0.02 116.02 36.02
4 0.02 116.01 42.01
5 0.02 116.01 32.01
6 0.02 116.01 33.01
7 0.02 116.01 25.01
U-01 0.00 116.02 44.02
U-02 0.00 116.02 43.02
U-03 0.00 116.02 35.02
U-04 0.00 116.01 41.01
U-05 0.00 116.01 33.01
U-06 0.00 116.01 32.01
U-07 0.00 116.01 25.01
DET-01 0.00 116.02 2.02
DET-02 0.00 116.02 6.02
DET-03 0.00 116.01 41.01
DET-4 0.00 116.01 38.01
DET-05 0.00 116.01 31.01
PV-01 0.00 116.02 5.02
A-1 0.00 120.26 64.26
P1 -0.66 56.00 0.00
R1 0.53 116.03 8.03
Resultado nos Trechos às 21:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.13 0.03 0.03
T3 0.06 0.01 0.01
T4 0.04 0.01 0.00
T5 0.02 0.00 0.00
T6 0.08 0.02 0.01
T7 0.08 0.02 0.01
T8 0.08 0.02 0.01
T8 0.06 0.01 0.01
T10 0.06 0.01 0.01
T11 0.06 0.01 0.01
T12 0.04 0.01 0.00
T13 0.02 0.00 0.00
T14 0.02 0.00 0.00
T15 -0.02 0.01 0.00
T16 0.02 0.01 0.01
T17 0.02 0.01 0.01
T18 0.02 0.01 0.00
T19 0.02 0.01 0.00
T20 0.02 0.01 0.00
30
T21 0.02 0.01 0.01
B-1 0.66 0.00 -64.26
Resultado nos Nós às 22:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.02 116.03 44.03
2 0.02 116.03 44.03
3 0.02 116.03 36.03
4 0.02 116.03 42.03
5 0.02 116.03 32.03
6 0.02 116.03 33.03
7 0.02 116.03 25.03
U-01 0.00 116.03 44.03
U-02 0.00 116.03 43.03
U-03 0.00 116.03 35.03
U-04 0.00 116.03 41.03
U-05 0.00 116.03 33.03
U-06 0.00 116.03 32.03
U-07 0.00 116.03 25.03
DET-01 0.00 116.03 2.03
DET-02 0.00 116.03 6.03
DET-03 0.00 116.03 41.03
DET-4 0.00 116.03 38.03
DET-05 0.00 116.03 31.03
PV-01 0.00 116.04 5.04
A-1 0.00 120.28 64.28
P1 -0.66 56.00 0.00
R1 0.54 116.04 8.04
Resultado nos Trechos às 22:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.12 0.03 0.02
T3 0.05 0.01 0.00
T4 0.03 0.01 0.00
T5 0.02 0.00 0.00
T6 0.07 0.02 0.01
T7 0.07 0.02 0.01
T8 0.07 0.02 0.01
T09 0.05 0.01 0.00
T10 0.05 0.01 0.00
T11 0.05 0.01 0.00
T12 0.03 0.01 0.00
T13 0.02 0.00 0.00
T14 0.02 0.00 0.00
T15 -0.02 0.01 0.00
T16 0.02 0.01 0.00
T17 0.02 0.01 0.00
T18 0.02 0.01 0.00
T19 0.02 0.01 0.00
T20 0.02 0.01 0.00
31
T21 0.02 0.01 0.00
B-1 0.66 0.00 -64.28
Resultado nos Nós às 23:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.02 116.04 44.04
2 0.02 116.04 44.04
3 0.02 116.04 36.04
4 0.02 116.03 42.03
5 0.02 116.03 32.03
6 0.02 116.03 33.03
7 0.02 116.03 25.03
U-01 0.00 116.04 44.04
U-02 0.00 116.04 43.04
U-03 0.00 116.04 35.04
U-04 0.00 116.03 41.03
U-05 0.00 116.03 33.03
U-06 0.00 116.03 32.03
U-07 0.00 116.03 25.03
DET-01 0.00 116.04 2.04
DET-02 0.00 116.04 6.04
DET-03 0.00 116.03 41.03
DET-4 0.00 116.03 38.03
DET-05 0.00 116.03 31.03
PV-01 0.00 116.04 5.04
A-1 0.00 120.28 64.28
P1 -0.66 56.00 0.00
R1 0.55 116.04 8.04
Resultado nos Trechos às 23:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.11 0.02 0.02
T3 0.05 0.01 0.00
T4 0.03 0.01 0.00
T5 0.02 0.00 0.00
T6 0.06 0.01 0.01
T7 0.06 0.01 0.01
T8 0.06 0.01 0.01
T09 0.05 0.01 0.00
T10 0.05 0.01 0.00
T11 0.05 0.01 0.00
T12 0.03 0.01 0.00
T13 0.02 0.00 0.00
T14 0.02 0.00 0.00
T15 -0.02 0.01 0.00
T16 0.02 0.01 0.00
T17 0.02 0.01 0.00
T18 0.02 0.01 0.00
T19 0.02 0.01 0.00
T20 0.02 0.01 0.00
32
T21 0.02 0.01 0.00
B-1 0.66 0.00 -64.28
Resultado nos Nós às 24:00 Horas Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.02 116.04 44.04
2 0.02 116.04 44.04
3 0.02 116.04 36.04
4 0.02 116.04 42.04
5 0.02 116.04 32.04
6 0.02 116.04 33.04
7 0.02 116.04 25.04
U-01 0.00 116.04 44.04
U-02 0.00 116.04 43.04
U-03 0.00 116.04 35.04
U-04 0.00 116.04 41.04
U-05 0.00 116.04 33.04
U-06 0.00 116.04 32.04
U-07 0.00 116.04 25.04
DET-01 0.00 116.04 2.04
DET-02 0.00 116.04 6.04
DET-03 0.00 116.04 41.04
DET-4 0.00 116.04 38.04
DET-05 0.00 116.04 31.04
PV-01 0.00 116.05 5.05
A-1 0.00 120.29 64.29
P1 -0.66 56.00 0.00
R1 0.55 116.05 8.05
Resultado nos Trechos às 24:00 Horas Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.66 0.34 3.61
T2 0.11 0.02 0.02
T3 0.05 0.01 0.00
T4 0.03 0.01 0.00
T5 0.02 0.00 0.00
T6 0.06 0.01 0.01
T7 0.06 0.01 0.01
T8 0.06 0.01 0.01
T09 0.05 0.01 0.00
T10 0.05 0.01 0.00
T11 0.05 0.01 0.00
T12 0.03 0.01 0.00
T13 0.02 0.00 0.00
T14 0.02 0.00 0.00
T15 -0.02 0.01 0.00
T16 0.02 0.01 0.00
T17 0.02 0.01 0.00
T18 0.02 0.01 0.00
T19 0.02 0.01 0.00
T20 0.02 0.01 0.00
33
T21 0.02 0.01 0.00
B-1 0.66 0.00 -64.29
__________________________________________________
BRAZ CAMPOS
Engº Civil – CREA 7044/D-GO
34
RESPONSÁVEL TÉCNICO
Top Related