1 SUMÁRIO
1 SUMÁRIO ......................................................................................................................................... 1
2 APRESENTAÇÃO ........................................................................................................................... 3
3 MAPAS DE LOCALIZAÇÃO ........................................................................................................ 5
4 INFORMAÇÕES GERAIS ............................................................................................................. 7
4.1 RUA PADRE GABRIEL (BAIRRO NOVA ROSA DA PENHA).............................................................7
4.2 RUA SÃO JORGE (BAIRRO NOVA ROSA DA PENHA)...................................................................10
4.3 RUA 107 (BAIRRO NOVA ROSA DA PENHA)................................................................................11
4.4 RUA 108 (BAIRRO NOVA ROSA DA PENHA)................................................................................13
4.5 RUA 109 (BAIRRO NOVA ROSA DA PENHA)................................................................................15
4.6 RUA 51 (BAIRRO NOVA ROSA DA PENHA).................................................................................18
5 ESTUDOS DESENVOLVIDOS .................................................................................................... 20
5.1 ESTUDO DE TRÁFEGO...................................................................................................................20
5.2 ESTUDO TOPOGRÁFICO................................................................................................................29
5.3 ESTUDO GEOTÉCNICO...................................................................................................................32
5.4 ESTUDO HIDROLÓGICO.................................................................................................................35
5.5 ESTUDO PARA DRENAGEM............................................................................................................42
6 PROJETOS EXECUTIVOS .......................................................................................................... 47
6.1 PROJETO GEOMÉTRICO E DE TERRAPLENAGEM........................................................................47
6.2 PROJETO DE DRENAGEM..............................................................................................................67
6.3 PROJETO DE PAVIMENTAÇÃO......................................................................................................76
6.4 PROJETO DE SINALIZAÇÃO..........................................................................................................84
7 ELEMENTOS GRÁFICOS ........................................................................................................... 86
1
8 CONSIDERAÇÕES GERAIS ....................................................................................................... 88
9 ESTIMATIVA DE CUSTOS E PLANO DE EXECUÇÃO ........................................................ 90
9.1 PLANO DE EXECUÇÃO...................................................................................................................90
9.2 QUANTITATIVOS DE SERVIÇOS.....................................................................................................92
9.3 CUSTOS DE IMPLANTAÇÃO...........................................................................................................94
9.4 CRONOGRAMA FÍSICO FINANCEIRO.............................................................................................96
10 ESPECIFICAÇÕES TÉCNICAS ............................................................................................... 97
11 RESPONSÁVEL TÉCNICO PELO PROJETO ....................................................................... 98
2
2 APRESENTAÇÃO
A STONENGE – Consultoria e Projetos de Engenharia Ltda, empresa contratada
pela Prefeitura Municipal de Cariacica, conforme contrato 158/2012 para Elaboração de
Projeto Final de Engenharia para pavimentação e drenagem da malha viária do município de
Cariacica, apresenta o Volume 1.14A: Relatório Executivo Bairro Nova Rosa da Penha.
O presente volume agrupa as informações necessárias à implantação da
terraplenagem, drenagem e pavimentação dos segmentos mencionados abaixo do Bairro
Nova Rosa da Penha, totalizando uma extensão de 1.833,00m.
EXT. (m)Rua Padre Gabriel (Nova Rosa da Penha) 0 + 0,00 29 + 0,00 580,0Rua São Jorge (Nova Rosa da Penha) 100 + 0,00 110 + 13,00 213,0Rua 107 (Nova Rosa da Penha) - Trecho 1 600 + 0,00 603 + 0,00 60,0Rua 107 (Nova Rosa da Penha) - Trecho 2 603 + 0,00 615 + 1,00 241,0Rua 108 (Nova Rosa da Penha) - Trecho 1 700 + 0,00 703 + 0,00 60,0Rua 108 (Nova Rosa da Penha) - Trecho 2 703 + 0,00 715 + 1,00 241,0Rua 109 (Nova Rosa da Penha) - Trecho 1 800 + 0,00 804 + 0,00 80,0Rua 109 (Nova Rosa da Penha) - Trecho 2 804 + 0,00 816 + 4,00 244,0Rua 51 (Nova Rosa da Penha) 1100 + 0,00 1105 + 14,00 114,0
TRECHO SEGMENTOLIMITES
Este volume foi organizado observando a seguinte itenização:
Sumário;
Apresentação;
Mapa de Localização;
Informações gerais;
Estudos desenvolvidos;
Projetos Executivos;
Elementos gráficos;
Estimativa de custos e plano de execução;
Especificações técnicas;
Responsável técnico pelo projeto.
3
A empresa localiza-se à Rua Darcy Grijó, nº 50, salas 806 e 807I, Ed. Madison Office
Tower, Jardim da Penha, Vitória, ES. Fone: 3345-6758; e-mail: [email protected].
O responsável técnico pelos projetos e orçamento em tela é a Engª Elisiane C. S.
D’Ávilla; Fone: (27) 3345-6758; e-mail: [email protected].
Maio de 2015.
4
3 MAPAS DE LOCALIZAÇÃO
Os mapas de localização e situação dos segmentos em estudo estão apresentados a
seguir.
5
MAPAS DE LOCALIZAÇÃO E SITUAÇÃO
6
4 INFORMAÇÕES GERAIS
Os segmentos em estudo neste relatório referem-se ao Bairro Nova Rosa da Penha
em Cariacica e objetiva atender os moradores dessa região, permitindo o deslocamento de
pessoas e veículos.
Alguns aspectos significativos dos segmentos estão apresentados a seguir
particularizado por rua:
4.1 RUA PADRE GABRIEL (BAIRRO NOVA ROSA DA PENHA)
A rua em questão está situada no Bairro Nova Rosa da Penha com início na estaca
0+0,00 e término na estaca 29+0,00 totalizando uma extensão de 580,00m. A pista de
rolamento terá de 4,00 a 8,55m de largura conforme espaço disponível para a implantação
da pavimentação. A via restringe-se ao tráfego local de moradores.
A pavimentação será em CBUQ acompanhando solução adotada nas ruas
adjacentes já pavimentadas no bairro.
O sistema de drenagem está estruturado com elementos de canalização superficial
(meio-fio), bueiros e caixas para coleta de água pluvial até o devido lançamento.
A implantação da via contará com elementos de sinalização para
orientação/regulamentação do tráfego e calçada nos dois bordos da pista com largura
mínima de 1,10m até o limite dos terrenos. As calçadas contarão ainda com rampas de
acessibilidade para os pedestres.
As fotos em seguida ilustram a situação atual da via em questão:
7
Figura 4.1 - Vista geral da Rua Padre Gabriel
Figura 4.2 - Vista geral da Rua Padre Gabriel
8
Figura 4.3 - Vista geral da Rua Padre Gabriel
Figura 4.4 - - Vista geral da Rua Padre Gabriel
9
Figura 4.5 - Vista geral da Rua Padre Gabriel
4.2 RUA SÃO JORGE (BAIRRO NOVA ROSA DA PENHA)
A rua em questão está situada no Bairro Nova Rosa da Penha com início na estaca
100+0,00 e término na estaca 110+13,00 totalizando uma extensão de 213,00m. A pista de
rolamento terá de 4,0 a 6,0m de largura conforme espaço disponível para a implantação da
pavimentação. A via restringe-se ao tráfego local de moradores.
A pavimentação será em bloco intertravado devido a forte rampa existente.
O sistema de drenagem está estruturado com elementos de canalização superficial
(meio-fio), bueiros e caixas para coleta de água pluvial até o devido lançamento.
A implantação da via contará com elementos de sinalização para
orientação/regulamentação do tráfego e calçada nos dois bordos da pista com largura
mínima de 1,10m até o limite dos terrenos. As calçadas contarão ainda com rampas de
acessibilidade para os pedestres.
As fotos em seguida ilustram a situação atual da via em questão:
10
Figura 4.6 - Vista geral da Rua São Jorge
Figura 4.7 - Vista geral da Rua São Jorge
4.3 RUA 107 (BAIRRO NOVA ROSA DA PENHA)
A rua em questão está situada no Bairro Nova Rosa da Penha com início na estaca
600+0,00 e término na estaca 615+1,00 (Rua 51) totalizando uma extensão de 301,00m. A
11
pista de rolamento terá de 5,1 a 6,0m de largura conforme espaço disponível para a
implantação da pavimentação. A via restringe-se ao tráfego local de moradores.
Da estaca 600+0,00 a estaca 603+0,00 a pavimentação será em bloco intertravado
devido a forte rampa existente. E da estaca 603+0,00 a 615+1,00 a pavimentação será em
CBUQ acompanhando solução adotada nas ruas adjacentes já pavimentadas no bairro.
O sistema de drenagem está estruturado com elementos de canalização superficial
(meio-fio), bueiros e caixas para coleta de água pluvial até o devido lançamento.
A implantação da via contará com elementos de sinalização para
orientação/regulamentação do tráfego e calçada nos dois bordos da pista com largura
mínima de 1,40m até o limite dos terrenos. As calçadas contarão ainda com rampas de
acessibilidade para os pedestres.
As fotos em seguida ilustram a situação atual da via em questão:
Figura 4.8 - Vista geral da Rua 107
12
Figura 4.9 - Vista geral da Rua 107
Figura 4.10 - Vista geral da Rua 107
4.4 RUA 108 (BAIRRO NOVA ROSA DA PENHA)
A rua em questão está situada no Bairro Nova Rosa da Penha com início na estaca
700+0,00 e término na estaca 715+1,00 (Rua 51) totalizando uma extensão de 301,00m. A
pista de rolamento terá 6,0m de largura conforme espaço disponível para a implantação da
pavimentação. A via restringe-se ao tráfego local de moradores.
13
Da estaca 700+0,00 a estaca 703+0,00 a pavimentação será em bloco intertravado
devido a forte rampa existente. E da estaca 703+0,00 a 715+1,00 a pavimentação será em
CBUQ acompanhando solução adotada nas ruas adjacentes já pavimentadas no bairro.
O sistema de drenagem está estruturado com elementos de canalização superficial
(meio-fio), bueiros e caixas para coleta de água pluvial até o devido lançamento.
A implantação da via contará com elementos de sinalização para
orientação/regulamentação do tráfego e calçada nos dois bordos da pista com largura
mínima de 1,10m até o limite dos terrenos. As calçadas contarão ainda com rampas de
acessibilidade para os pedestres.
As fotos em seguida ilustram a situação atual da via em questão:
Figura 4.11 - Vista geral da Rua 108
14
Figura 4.12 - Vista geral da Rua 108
Figura 4.13 - Vista geral da Rua 108
4.5 RUA 109 (BAIRRO NOVA ROSA DA PENHA)
A rua em questão está situada no Bairro Nova Rosa da Penha com início na estaca
800+0,00 e término na estaca 816+4,00 (Rua 51) totalizando uma extensão de 324,00m. A
pista de rolamento terá de 4,6 a 7,0m de largura conforme espaço disponível para a
implantação da pavimentação. A via restringe-se ao tráfego local de moradores.
15
Da estaca 800+0,00 a estaca 804+0,00 a pavimentação será em bloco intertravado
devido a forte rampa existente. E da estaca 804+0,00 a 816+4,00 a pavimentação será em
CBUQ acompanhando solução adotada nas ruas adjacentes já pavimentadas no bairro.
O sistema de drenagem está estruturado com elementos de canalização superficial
(meio-fio), bueiros e caixas para coleta de água pluvial até o devido lançamento.
A implantação da via contará com elementos de sinalização para
orientação/regulamentação do tráfego e calçada nos dois bordos da pista com largura
mínima de 1,10m até o limite dos terrenos. As calçadas contarão ainda com rampas de
acessibilidade para os pedestres.
As fotos em seguida ilustram a situação atual da via em questão:
Figura 4.14 - Vista geral da Rua 109
16
Figura 4.15 - Vista geral da Rua 109
Figura 4.16 - Vista geral da Rua 109
17
Figura 4.17 - Vista geral da Rua 109
4.6 RUA 51 (BAIRRO NOVA ROSA DA PENHA)
A rua em questão está situada no Bairro Nova Rosa da Penha com início na estaca
1100+0,00 (Rua 55) e término na estaca 1105+14,00 totalizando uma extensão de 114,00m.
A pista de rolamento terá de 3,8 a 4,0m de largura conforme espaço disponível para a
implantação da pavimentação. A via restringe-se ao tráfego local de moradores.
A pavimentação será em bloco intertravado devido a forte rampa existente.
O sistema de drenagem está estruturado com elementos de canalização superficial
(meio-fio), bueiros e caixas para coleta de água pluvial até o devido lançamento.
A implantação da via contará com elementos de sinalização para
orientação/regulamentação do tráfego e calçada onde a largura da pista permitiu com
largura mínima de 1,00m até o limite dos terrenos. As calçadas contarão ainda com rampas
de acessibilidade para os pedestres.
As fotos em seguida ilustram a situação atual da via em questão:
18
Figura 4.18 - Vista geral da Rua 51
Figura 4.19 - Vista geral da Rua 51
19
5 ESTUDOS DESENVOLVIDOS
Os estudos desenvolvidos observaram os aspectos metodológicos preconizados no
Volume 03: Especificações e aspectos metodológicos. As informações a seguir
simplesmente traduzem os resultados das investigações assim consubstanciados:
Estudo de tráfego;
Estudo topográfico;
Estudo geotécnico;
Estudo hidrológico.
5.1 ESTUDO DE TRÁFEGO
O estudo de tráfego foi estruturado objetivando estimar a geração de viagens e
definir o Número “N” de solicitações do eixo simples padrão (ESP) na estrutura do
pavimento. Em sua totalidade o desenvolvimento desta disciplina considerou os seguintes
aspectos:
Previsão de viagens;
Distribuição modal;
Projeção do tráfego;
Determinação do Número “N”.
5.1.1 Previsão de Viagens
O modelo de previsão de viagens foi adotado tendo em vista o fato de que na maioria
das ruas não há atualmente fluxo de tráfego veicular efetivamente consolidado em
decorrência das condições de circulação na via.
No presente estudo, a estimativa de previsão de viagens objetivou exclusivamente
subsidiar a estimativa de circulação de veículos e sua ação deletéria à estrutura do
pavimento.
No presente estudo a estimativa foi estruturada considerando-se as taxas de geração
de viagem da publicação do Trip Generation (ITE, 1977). Evidentemente que a adoção
deste critério é bastante simplificadora e consiste na aplicação de uma taxa de geração de
20
tráfego à determinada unidade geradora de tráfego que está associada ao tipo de uso do
solo.
As taxas de geração de viagens (TGV) obtidas no ITE, 1977 e aplicadas no presente
estudo foram às seguintes:
Área residencial: TGVR = 2,50 X Nº unidades residenciais;
Área comercial: TGVC = 195,11 x Área [acres] → TGVC = 0,049 x Área[m²];
Área de uso comum: TGVu= TGVC = 0,049 x Área [m²].
Além da simplificação na obtenção das taxas, a análise foi estruturada admitindo
inúmeras simplificações. As hipóteses simplificadoras, bem como as diretivas de cálculo,
estão as listadas a seguir:
Estabeleceu-se preliminarmente a hierarquização das vias em: Coletora; Ligação e
Local;
Para cada lote admitiu-se a ocupação com uma unidade residencial;
Admitiu-se largura média dos lotes igual a 10m;
A área média dos lotes é de 200,00m²;
100% dos lotes destinam-se a uso residencial;
As áreas de uso comum, quando existentes, foram apropriadas;
Para vias de ligação e coletoras admitiu-se o tráfego da via com hierarquia inferior, com
maior solicitação;
A via coletora constitui-se de corredor central do bairro que recebe as várias ruas de
ligação. Na determinação do tráfego que circula por esta via considera-se o efeito
acumulativo do tráfego das vias de ligação e vias locais;
As vias de ligação interligam as vias locais à via coletora. Na determinação do tráfego
que circula por esta via considerou-se o efeito acumulativo do tráfego das vias locais;
A via local refere-se às vias de grande acessibilidade, que permitem o acesso direto aos
lotes do empreendimento.
A tabela a seguir ilustra o número de viagens para cada rua, considerando todas as
hipóteses relacionadas anteriormente.
21
Tabela 5.1 - Classificação das ruas e estimativa do número de viagens
Rua Padre Gabriel (Nova Rosa da Penha) Via Local 100Rua São Jorge (Nova Rosa da Penha) Via Local 50Rua 107 (Nova Rosa da Penha) - Trecho 1 Via Local 186Rua 107 (Nova Rosa da Penha) - Trecho 2 Via Local 186Rua 108 (Nova Rosa da Penha) - Trecho 1 Via Local 125Rua 108 (Nova Rosa da Penha) - Trecho 2 Via Local 125Rua 109 (Nova Rosa da Penha) - Trecho 1 Via Local 193Rua 109 (Nova Rosa da Penha) - Trecho 2 Via Local 193Rua 51 (Nova Rosa da Penha) Via Local 57
TRECHO CLASS.DA VIA
NºVIAGENS
5.1.2 Distribuição modal
Após a determinação do nº de viagens, procedeu-se a seleção das categorias
veiculares e sua distribuição percentual da frota. Esta etapa considerou os valores apurados
no Relatório Técnico “Demanda por qualificação profissional para condutores de veículos de
transporte de cargas” do IDT – Instituto de Desenvolvimento dos Transportes (2007).
A compilação dos dados resultou nos seguintes valores, particularizados por rua:
22
Tabela 5.2 - Distribuição percentual da frota para as ruas em estudo
2 eixos 3 eixos 2C 3C 4C 2S1 2S2 2S3 3S2 3S3 2C2 2C3 3C2 3C3 BITRua Padre Gabriel (Nova Rosa da Penha) Via Local 100 83% 8% 2% 6% 1%Rua São Jorge (Nova Rosa da Penha) Via Local 50 83% 8% 2% 6% 1%Rua 107 (Nova Rosa da Penha) - Trecho 1 Via Local 186 83% 8% 2% 6% 1%Rua 107 (Nova Rosa da Penha) - Trecho 2 Via Local 186 83% 8% 2% 6% 1%Rua 108 (Nova Rosa da Penha) - Trecho 1 Via Local 125 83% 8% 2% 6% 1%Rua 108 (Nova Rosa da Penha) - Trecho 2 Via Local 125 83% 8% 2% 6% 1%Rua 109 (Nova Rosa da Penha) - Trecho 1 Via Local 193 83% 8% 2% 6% 1%Rua 109 (Nova Rosa da Penha) - Trecho 2 Via Local 193 83% 8% 2% 6% 1%Rua 51 (Nova Rosa da Penha) Via Local 57 83% 8% 2% 6% 1%
TRECHO CLASS.DA VIA
NºVIAGENS
% DA FROTA PARA AS CATEGORIA DE VEÍCULOS
CPCAMINHÃO SEMI-REBOQUE REBOQUESON
23
Tabela 5.3 - Distribuição da frota para as ruas em estudo (cont.)
2 eixos 3 eixos 2C 3C 4C 2S1 2S2 2S3 3S2 3S3 2C2 2C3 3C2 3C3 BITRua Padre Gabriel (Nova Rosa da Penha) Via Local 100 83 8 2 6 1Rua São Jorge (Nova Rosa da Penha) Via Local 50 42 3 1 3 1Rua 107 (Nova Rosa da Penha) - Trecho 1 Via Local 186 154 15 4 11 2Rua 107 (Nova Rosa da Penha) - Trecho 2 Via Local 186 154 15 4 11 2Rua 108 (Nova Rosa da Penha) - Trecho 1 Via Local 125 104 9 3 8 1Rua 108 (Nova Rosa da Penha) - Trecho 2 Via Local 125 104 9 3 8 1Rua 109 (Nova Rosa da Penha) - Trecho 1 Via Local 193 160 15 4 12 2Rua 109 (Nova Rosa da Penha) - Trecho 2 Via Local 193 160 15 4 12 2Rua 51 (Nova Rosa da Penha) Via Local 57 47 5 1 3 1
TRECHO CLASS.DA VIA
NºVIAGENS
TMD PARA AS CATEGORIA DE VEÍCULOS
CPREBOQUESCAMINHÃO SEMI-REBOQUEON
24
5.1.3 Projeção do tráfego
Os dados históricos coletados objetivaram subsidiar a extrapolação dos valores do
TMD atual para o volume de tráfego no horizonte de projeto. Tal informação foi obtida nos
estudos econômicos encomendados pelo DER-ES e desenvolvidos pela ECR Ltda e foram
obtidas as taxas de crescimento dos trechos em questão e os valores são os apresentados
na tabela a seguir.
CP ON CAM3,89% 3,25% 2,14%
Taxa de Crescimento
Os valores relevantes ao desenvolvimento deste estudo refletem o maior valor
característico para o crescimento do tráfego considerando os valores para o município de
Cariacica. Os valores obtidos a partir da projeção do tráfego, particularizado por trecho,
constam na planilha a seguir.
Tabela 5.4 - Projeção do tráfego até 2023
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023Rua Padre Gabriel (Nova Rosa da Penha) Via Local 100 104 108 112 116 120 124 129 134 139Rua São Jorge (Nova Rosa da Penha) Via Local 50 52 54 56 58 60 62 65 67 69Rua 107 (Nova Rosa da Penha) - Trecho 1 Via Local 186 193 200 207 215 223 231 240 249 257Rua 107 (Nova Rosa da Penha) - Trecho 2 Via Local 186 193 200 207 215 223 231 240 249 257Rua 108 (Nova Rosa da Penha) - Trecho 1 Via Local 125 130 134 139 145 150 156 161 167 174Rua 108 (Nova Rosa da Penha) - Trecho 2 Via Local 125 130 134 139 145 150 156 161 167 174Rua 109 (Nova Rosa da Penha) - Trecho 1 Via Local 193 200 208 215 223 231 240 249 258 268Rua 109 (Nova Rosa da Penha) - Trecho 2 Via Local 193 200 208 215 223 231 240 249 258 268Rua 51 (Nova Rosa da Penha) Via Local 57 59 61 64 66 68 71 74 76 79
TRECHO CLASS.DA VIA
PROJEÇÃO TMD
5.1.4 Determinação do Número “N”
O número “N” de operações do eixo padrão, durante o período de vida útil do
pavimento, foi calculado de acordo com a equação seguinte:
N=VMDc× FV ×K ×365
Onde:
N Número de operações do eixo padrão;
VMDc Volume médio diário de tráfego de veículos comerciais em um sentido;
25
FV Fator médio de veículos;
K Coeficiente da fração de VMD mais representativo (K=1).
O volume médio diário de veículos comerciais foi obtido considerando-se o VMDA,
subtraído do volume de carros de passeio, motos e outros.
A determinação dos Fatores de Veículo para projetos de pavimentação pode ser
efetuada por dois processos:
Determinação das cargas efetivamente transportadas pelos veículos e sua distribuição
por eixo;
Utilização das cargas máximas por eixo permitidas por lei.
Em face da ausência de dados significativos de pesagem, procederam-se os cálculos
considerando-se 80% das cargas máximas permitidas por lei, cujos valores são os
seguintes:
Tabela 5.5 - Cargas máximas
TriploRoda
simplesRoda dupla Especial Não
tanden Tanden Tanden
6,0 8,0 10,8 13,6 13,6 20,4
DuploSimples
Procedeu-se, então, a determinação dos fatores de veículo considerando a
formulação proposta pelo Corpo de Engenheiros Americanos USACE.
Tabela 5.6 - Proposta USACE
26
Os Fatores de Veículos para as categorias de veículo, bem como os valores
ponderados com a composição do tráfego, estão apresentados no quadro a seguir,
particularizado por trecho.
Tabela 5.7 - Classificação da via e Fator Veículo
TRECHO CLASS. DA VIA FV
Rua Padre Gabriel (Nova Rosa da Penha) Via Local 1,156Rua São Jorge (Nova Rosa da Penha) Via Local 1,252Rua 107 (Nova Rosa da Penha) - Trecho 1 Via Local 1,165Rua 107 (Nova Rosa da Penha) - Trecho 2 Via Local 1,165Rua 108 (Nova Rosa da Penha) - Trecho 1 Via Local 1,140Rua 108 (Nova Rosa da Penha) - Trecho 2 Via Local 1,140Rua 109 (Nova Rosa da Penha) - Trecho 1 Via Local 1,161Rua 109 (Nova Rosa da Penha) - Trecho 2 Via Local 1,161Rua 51 (Nova Rosa da Penha) Via Local 1,216
FATOR DE VEÍCULO
Aplicando-se a metodologia e os parâmetros anteriormente explicitados procedeu-se
a determinação do número “N”. Os valores obtidos são os apresentados a seguir:
27
Tabela 5.8 - Determinação do número “N”
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ACUM.Rua Padre Gabriel (Nova Rosa da Penha) Via Local 3,59E+03 3,69E+03 3,79E+03 3,90E+03 4,00E+03 4,12E+03 4,23E+03 4,35E+03 4,47E+03 4,64E+03 4,08E+04Rua São Jorge (Nova Rosa da Penha) Via Local 1,83E+03 1,88E+03 1,93E+03 1,98E+03 2,03E+03 2,09E+03 2,15E+03 2,20E+03 2,26E+03 2,29E+03 2,06E+04Rua 107 (Nova Rosa da Penha) - Trecho 1 Via Local 6,80E+03 6,99E+03 7,19E+03 7,39E+03 7,60E+03 7,81E+03 8,03E+03 8,26E+03 8,49E+03 8,50E+03 7,71E+04Rua 107 (Nova Rosa da Penha) - Trecho 2 Via Local 6,80E+03 6,99E+03 7,19E+03 7,39E+03 7,60E+03 7,81E+03 8,03E+03 8,26E+03 8,49E+03 8,50E+03 7,71E+04Rua 108 (Nova Rosa da Penha) - Trecho 1 Via Local 4,37E+03 4,49E+03 4,62E+03 4,74E+03 4,88E+03 5,01E+03 5,15E+03 5,30E+03 5,44E+03 5,62E+03 4,96E+04Rua 108 (Nova Rosa da Penha) - Trecho 2 Via Local 4,37E+03 4,49E+03 4,62E+03 4,74E+03 4,88E+03 5,01E+03 5,15E+03 5,30E+03 5,44E+03 5,62E+03 4,96E+04Rua 109 (Nova Rosa da Penha) - Trecho 1 Via Local 6,99E+03 7,19E+03 7,39E+03 7,59E+03 7,81E+03 8,02E+03 8,25E+03 8,48E+03 8,72E+03 8,90E+03 7,93E+04Rua 109 (Nova Rosa da Penha) - Trecho 2 Via Local 6,99E+03 7,19E+03 7,39E+03 7,59E+03 7,81E+03 8,02E+03 8,25E+03 8,48E+03 8,72E+03 8,90E+03 7,93E+04Rua 51 (Nova Rosa da Penha) Via Local 2,22E+03 2,28E+03 2,34E+03 2,41E+03 2,48E+03 2,55E+03 2,62E+03 2,69E+03 2,77E+03 2,88E+03 2,53E+04
TRECHO CLASS. DA VIA
"N"
28
5.2 ESTUDO TOPOGRÁFICO
Os cálculos topográficos foram desenvolvidos como auxilio do software POSIÇÃO,
gerando coordenadas 3D de todos os pontos cadastrados e passados para o software
AUTOCAD2014 onde foi confeccionado o desenho final. Os dados da poligonal principal
estão apresentados a seguir:
Rua Padre Gabriel e Rua São Jorge
Poligonal principal
COTA DESCRIÇÃO
AZIMUTE DISTÂNCIA
O1
285°22'49.0"
O2 47 ESTACAO
330°14'31.1" 143,188
O3 42,371 ESTACAO
319°35'37.5" 54,109
O4 47,413 ESTACAO
330°36'55.3" 72,148
O5 51,198 ESTACAO
343°22'54.9" 105,9
O6 51,842 ESTACAO
339°18'41.4" 43,672
O7 50,993 ESTACAO
63°44'22.5" 41,199
O8 54,219 ESTACAO
155°03'45.6" 218,077
O9 47,284 ESTACAO
152°16'57.6" 231,268
O1 48,785 ESTACAO
285°22'49.0" 51,016
O2 47 ESTACAO
354881,842
354832,65
ESTAÇÃO
354645,388
354682,333
354774,279
354726,505
354691,103
354660,817
COORD.NORTE COORD.ESTE
354832,65
354761,579
7760014,626
7759809,898
7759823,43
7760153,285
7760194,142
7760212,369
175°55'40.3"
264°25'29.7"
271°19'09.0"
177°13'09.3"
313°05'56.3"
7759823,43
7759947,737
7759988,941
7760051,807
224°51'39.0"
169°21'02.0"
191°01'08.7"
ÂNGULO HORIZ
192°45'51.7"
A seguir são apresentados os dados de fechamento da poligonal principal:
Perímetro:....... 960.578
ERROS TOLERÂNCIAS
Angular:......... 0°00'54" 0°01'30" Erro Distribuído
Relativo:......... 1:32526 1:10000 Erro Distribuído
Linear:............ 0.0295
Eixo Norte:..... 0.0000
Eixo Este:....... 0.0295
Azimute:........ 89°58'53"
Altimétrico:.... 0.0090 0.0392 Erro Distribuído
29
Rua 51
Poligonal principal
ESTAÇÃO ÂNGULO HORIZ COORD.NORTE COORD.ESTE COTA DESCRIÇÃO
AZIMUTE DISTÂNCIA
B0
122°29'39.0"
B1 272°50'36.0" 7759536,70 355020,76 48,000 ESTACAO
215°20'02.7" 41,74
B2 175°28'38.0" 7759502,70 354996,62 37,742 ESTACAO
210°48'40.5" 51,21
B3 359°05'14.0" 7759458,70 354970,39 21,372 ESTACAO
29°53'56.8" 65,83
B4 175°34'08.0" 7759515,80 355003,20 41,839 ESTACAO
25°28'04.3" 27,33
B0 277°01'26.0" 7759540,40 355014,95 48,118 ESTACAO
122°29'39.1" 6,89
B1 7759536,70 355020,76 48,000 ESTACAO
A seguir são apresentados os dados de fechamento da poligonal principal.
Perímetro:....... 192.998
ERROS TOLERÂNCIAS
Angular:......... -0°00'02" 0°00'22" Erro Distribuído
Relativo:......... 1:16906 1:10000 Erro Distribuído
Linear:............ 0.0114
Eixo Norte:..... 0.0103
Eixo Este:....... 0.0050
Azimute:........ 25°50'38"
Altimétrico:.... -0.0037 0.0044 Erro Distribuído
30
Ruas 107, 108 e 109
Poligonal principal
ÂNGULO HORIZ COORD.NORTE COORD.ESTE COTA DESCRIÇÃO
AZIMUTE DISTÂNCIA
NR0
48°46'30.0"
NR1 81°44'32.3" 7760002,4 355477,55 50 ESTACAO
310°31'18.7" 46,239
NR2 192°26'03.3" 7760032,4 355442,4 48,969 ESTACAO
322°57'34.3" 52,013
NR3 175°06'52.0" 7760073,9 355411,07 48,536 ESTACAO
318°04'34.2" 106,63
NR4 179°21'50.3" 7760153,3 355339,83 50,575 ESTACAO
317°26'33.4" 30,366
NR5 91°21'16.5" 7760175,6 355319,29 49,532 ESTACAO
228°47'51.9" 98,442
NR6 85°44'52.3" 7760110,8 355245,22 45,659 ESTACAO
134°32'48.6" 50,791
NR7 185°35'19.0" 7760075,2 355281,42 51,251 ESTACAO
140°08'12.7" 191,504
NR8 80°40'52.0" 7759928,2 355404,17 48,591 ESTACAO
40°49'17.1" 53,856
NR0 187°57'01.3" 7759968,9 355439,38 52,003 ESTACAO
48°46'30.0" 50,754
NR1 7760002,4 355477,55 50 ESTACAO
ESTAÇÃO
A seguir são apresentados os dados de fechamento da poligonal principal.
Perímetro:....... 680.597
ERROS TOLERÂNCIAS
Angular:......... 0°01'21" 0°01'30" Erro Distribuído
Relativo:......... 1:35640 1:10000 Erro Distribuído
Linear:............ 0.0191
Eixo Norte:..... -0.0090
Eixo Este:....... -0.0168
Azimute:........ 241°47'04"
Altimétrico:.... -0.0312 0.0330 Erro Distribuído
31
5.3 ESTUDO GEOTÉCNICO
Os ensaios geotécnicos de verificação do subleito, o boletim de sondagem, bem
como os resultados dos ensaios de cada um dos trechos em estudo, estão apresentados a
seguir:
Tabela 5.9 - Boletim de sondagem das ruas Rua Furo Profundidade Observação
Rua Padre Gabriel 1 0,00 A 0,60 Argila amarelaRua São Jorge 2 0,00 A 0,60 Argila amarelaRua Cento e sete 3 0,00 A 0,02 Escoria
0,02 A 0,12 Entulho0,12 A 0,60 Argila siltosa misturada
Rua Cento e oito 4 0,00 A 0,04 Escoria e concreto0,04 A 0,60 Argila amarela
Rua Cento e nove 5 0,00 A 0,05 Escoria0,05 A 0,60 Argila amarela
Rua Quatro 6 0,00 A 0,20 Resto de obras0,20 A 0,70 Argila amarela escura
Rua Vinte e Sete 7 0,00 A 0,05 Escoria0,05 A 0,70 Argila Amarela
Rua Vinte e Sete 8 0,00 A 0,60 Argila siltosa variada (Valão a céu aberto)
Rua Cinquenta e Um 9 0,00 A 0,05 Escoria0,05 A 0,60 Argila amarela escura
Rua Sessenta e Um 10 0,00 A 0,05 Escoria0,05 A 0,60 Argila amarela (em frente à escola)
Rua Sessenta e Dois 11 0,00 A 0,08 Escoria com argila (base)0,08 A 0,65 Argila amarela (Regularização)
32
Tabela 5.10 - Resumo dos ensaios realizados
Hotima Dmax EXP. CBR
LL IP 2'' 1'' 3/4'' 3/8'' 4 10 40 200 % Kg/m3 % %
1 Rua Padre Gabriel Regularização 12 45 19 100,0 100,0 100,0 100,0 100,0 97,9 80,8 47,7 6 A-7-6 19,1 1,53 0,55 7,4
2 Rua São Jorge Regularização 12 51 21 100,0 100,0 100,0 98,5 97,8 96,4 78,2 51,6 9 A-7-5 16,8 1,66 0,55 6,53 Rua cento e sete Regularização 12 39 15 100,0 100,0 100,0 99,8 98,8 94,5 69,4 36,8 2 A-6 16,0 1,62 0,70 6,2
4 Rua cento e oito Regularização 12 47 22 100,0 100,0 100,0 100,0 99,9 99,1 79,0 58,2 11 A-7-6 21,4 1,59 0,50 8,4
5 Rua cento e nove Regularização 12 59 20 100,0 100,0 100,0 100,0 100,0 99,0 82,2 69,3 14 A-7-5 20,3 1,53 0,65 8,2
6 Rua Quatro Regularização 26 40 4 100,0 100,0 100,0 100,0 98,4 93,4 73,2 53,5 4 A-4 16,3 1,77 0,13 18,9
7 Rua Vinte e Sete Regularização 26 40 12 100,0 100,0 100,0 100,0 98,4 90,5 64,9 48,9 4 A-6 16,1 1,72 - 8,1
8 Rua Vinte e Sete Regularização 26 46 13 100,0 100,0 100,0 100,0 97,7 94,0 74,9 56,9 7 A-7-5 17,8 1,69 0,04 14,5
9 Cinquenta e Um Regularização 26 43 5 100,0 100,0 100,0 98,2 96,5 90,3 74,3 59,9 6 A-5 19,7 1,73 0,14 10,4
10 Sessenta e Um Regularização 26 38 10 100,0 100,0 100,0 100,0 99,4 94,3 76,1 57,1 5 A-4 17,4 1,68 0,42 13,4
11 Sessenta e Dois Regularização 26 41 14 100,0 100,0 100,0 100,0 97,0 92,2 73,8 54,0 6 A-7-6 16,1 1,97 0,11 18,0
11 Sessenta e Dois Base 55 NL NP 100,0 100,0 100,0 72,8 48,3 28,4 16,0 1,8 0 A-1-a 10,0 2,06 0,03 110,7
Furo Rua Golpes HRBI GÍNDICES FÍSICOS GRANULOMETRIAFinalidade
33
A camada de base será executada em brita graduada faixa “C” DNIT.
Os materiais pétreos e asfálticos a empregar na obra serão provenientes da Pedreira
Brasitália, situada às margens da Rodovia do Contorno (BR-101), km 291, Bairro Nova
Valverde, Cariacica – ES.
Destaca-se que na apresentação da proposta, os valores limites para a execução do
transporte são os estabelecidos na planilha. Deslocamentos superiores deverão admitir
como limite o valor financeiro apresentado na planilha.
Qualquer alteração inerente à obtenção do material pétreo, ou material de mistura
para as camadas granulares deverá ser previamente apresentada. Neste relatório também
deverá ser indicada a unidade que irá fornecer a mistura betuminosa, bem como o traço e
respectivas características da mistura a ser aplicada.
34
5.4 ESTUDO HIDROLÓGICO
Os itens pertinentes a este estudo foram os seguintes:
Aspectos gerais;
Dados utilizados;
Aspectos metodológicos;
Resultados obtidos.
5.4.1 Aspectos gerais
Os Estudos Hidrológicos aqui apresentados tem por objetivo determinar e analisar os
parâmetros de precipitação para o referido projeto. Através desses parâmetros é possível
calcular as vazões dos deflúvios com o objetivo de verificar os bueiros já existentes e
dimensionar os novos dispositivos.
A realização dos estudos foi feita com base nos dados obtidos junto à ANA, Agência
Nacional de Águas, sendo pesquisados os postos pluviométricos próximos à região de
estudo, além disso, consultou-se o Manual de Hidrologia Básica para Estruturas de
Drenagem do DNIT – Departamento Nacional de Infraestrutura de Transportes.
Para a elaboração desse estudo foi necessária à análise dos aspectos climáticos e
geomorfológicos da região do projeto, caracterização das bacias que interceptam o trecho,
ajustamento dos parâmetros e levantamento do histórico pluviométrico, cujos parâmetros,
critérios e metodologia de cálculos utilizados são apresentados a seguir.
5.4.2 Dados utilizados
No desenvolvimento dos estudos hidrológicos foram aplicados, além da bibliografia
existente e informações obtidas diretamente nos levantamentos topográficos, informações
obtidas em mapas cartográficos e dados pluviométricos.
As informações pluviométricas levadas a efeito na determinação da chuva de projeto
foram obtidas na publicação da UFES denominada "Altura x Duração x Frequência das
Chuvas Intensas no Estado do Espírito Santo", de março de 1985, de autoria do professor
Robson Sarmento.
35
A citada publicação foi utilizada por tratar-se de um documento idôneo e que foi
editado para agilizar a efetivação das análises hidrológicas. Neste estudo obteve-se a
expressão para cálculo da Intensidade para a cidade de Vitória, que é a seguinte:
I= 973,47 X T0,19
( t+20 )0,77
Onde:
I: Intensidade da chuva (mm/h);
T: Período de Recorrência (anos);
t: Chuva com duração igual ao tempo de concentração (min).
Para o dimensionamento das redes pluviais urbanas foi utilizada a equação de
intensidade citada acima, entretanto, para os bueiros de transposição de talvegue, foi
utilizado o gráfico de Altura Pluviométrica para a estação Duas Bocas (DNOS) no município
de Cariacica.
5.4.2.1 MAPAS CARTOGRÁFICOS
As bacias de contribuição foram individualizadas a partir das plantas do
“Levantamento aerofotogramétrico, escala 1/8.000 de 1998”, realizado pela Maplan
Aerolevantamentos S.A.
5.4.3 Aspectos metodológicos
O estudo das vazões afluentes das bacias hidrográficas permitiu aferir a grandeza
das descargas máximas possibilitando então estabelecer o dimensionamento das novas
obras de drenagem e verificar as já existentes.
No cálculo das descargas foram considerados os seguintes aspectos:
Determinação das bacias de contribuição;
Tempo de concentração;
Coeficiente de escoamento superficial;
Período de recorrência;
36
Cálculo das descargas de pico das bacias.
5.4.3.1 CÁLCULO DAS DESCARGAS DE PROJETO
Para o dimensionamento dos dispositivos de drenagem foi necessário o estudo das
vazões afluentes das bacias hidrográficas interceptadas pelo projeto, sendo determinadas
as descargas máximas decorrentes de cada uma.
Determinação das bacias de contribuição
A bacia hidrográfica pode ser definida como um conjunto de áreas com declividades
no sentido de determinada seção transversal de um curso d’água, cujo escoamento
superficial ou subterrâneo alimenta o deflúvio em determinada seção transversal do curso
d’água.
Para a sua determinação envolveu-se com um polígono a área que topograficamente
contribui para o segmento em estudo. Tais polígonos foram definidos considerando-se a
linha dos divisores de água e a diretriz do curso d’água e suas áreas foram determinadas
eletronicamente utilizando – software AutoCad. Para cada área de contribuição determinou-
se ainda sua cota máxima, cota mínima e o comprimento do talvegue principal.
Em face da natureza do sistema de drenagem projetado, constituído
predominantemente de redes longitudinais, os parâmetros das bacias contribuintes sempre
foram obtidos considerando-se o acréscimo de área decorrente do avanço da rede
projetada, esta linha de ação resultou no dimensionamento mais econômico da rede tendo
em vista que, quanto mais à jusante o segmento em análise maior o tempo de
concentração, resultando em uma menor intensidade e consequentemente uma menor
vazão.
Esta prerrogativa de análise foi adotada concomitantemente à supressão do cálculo
do tempo de percurso dentro da galeria admitido sempre igual à zero.
Tempo de concentração
O Tempo de concentração - Tc é obtido pela soma entre o tempo de entrada e o
tempo de percurso na obra:
T c=T c+T p
37
Onde;
Tc : Tempo de escoamento superficial ou de entrada;
Tp : Tempo de percurso dentro da obra.
De acordo com conclusão do Manual de Hidrologia Básica para Estruturas de
Drenagem do DNIT 2005, o método de Kirpich modificado é o mais recomendado para
qualquer tamanho de bacia e o Método do LAG para bacias com área superior a 10 km²
para determinação do tempo de escoamento superficial ou tempo de entrada.
Para obras de simples transposição o Tempo de percurso Tp é nulo, desta forma é
usual denominar o tempo de escoamento superficial simplesmente de Tempo de
Concentração. A fórmula de KIRPICH modificada para determinação do Tc é a seguinte:
T c=1,42 X ( L3H )0,385
Onde:
Tc : Tempo escoamento superficial [h];
L : Comprimento do curso d`água [km];
H : Desnível máximo na bacia [m];
1,42 : Coeficiente unificador das unidades.
A fórmula para o método do LAG é a seguinte:
T c=14,43×Kn×[ L× Lc√ HL ]0,33
Onde:
Tc : Tempo escoamento superficial [h];
L : Comprimento do curso d’água [km];
Lc : Comprimento do posto de medição ao centro de gravidade [km];
38
H : Desnível máximo na bacia [m];
Kn : Média do coeficiente de Rugosidade de Manning no curso d’água.
Avaliando-se os valores obtidos com a expressão, admitiu-se como premissa para o
desenvolvimento deste projeto valores nunca inferiores a 10 min, conforme preconiza o
PLANEPAR para avaliação de sistemas de drenagem inseridos no contexto urbano.
Coeficiente de escoamento superficial
A fixação do coeficiente de escoamento consiste em se verificar, de todas as formas
possíveis, o comportamento do solo sob a chuva, a retenção da água pela cobertura
vegetal, além da análise da bacia contribuinte (forma, declividade, comprimento do talvegue
principal e rede de drenagem, etc.).
A fixação deste coeficiente é de obvia importância na obtenção das vazões das
bacias hidrográficas interceptadas pelo projeto em questão. A seguir são apresentadas as
tabelas contendo os valores de “C” em função da natureza do solo e sua cobertura vegetal.
Tabela 5.11 - Coeficiente de escoamento superficial / Run-offDescrição das Áreas das Bacias Tributárias Coeficiente de Deflúvio "C"
Comércio:
Áreas Centrais 0,70 a 0,95
Áreas da periferia do centro 0,50 a 0,70
39
Residencial:
Áreas de uma única família 0,30 a 0,50
Multi-unidades, isoladas 0,40 a 0,60
Multi-unidades, ligadas 0,60 a 0,75
Residencial (suburbana) 0,25 a 0,40
Área de alagamentos 0,50 a 0,70
Industrial
Áreas leves 0,50 a 0,80
Áreas densas 0,60 a 0,90
40
Parques, cemitérios 0,10 a 0,25
Playgrounds 0,20 a 0,35
Pátio e espaço de serviços de estrada de ferro 0,20 a 0,40
Terrenos baldios 0,10 a 0,30
Período de Recorrência
Para obras de engenharia a segurança e durabilidade associam-se ao tempo ou
período de recorrência, cujo significado refere-se ao período em anos em que ocorrerá uma
precipitação de grande magnitude. No dimensionamento hidráulico as obras são projetadas
de forma a comportar esta magnitude de escoamento sem risco de superação. Este
escoamento é designado descarga de projeto.
A definição do período de recorrência - TR deve considerar os aspectos técnicos e
econômicos de sua adoção. Na IS-203 do DNIT é recomendado adotar para vazão crítica de
escoamento TR = 10 anos e verificação do nível d`água a montante para enchente de 20
anos.
41
Para definição do risco de ruptura de uma obra, onde a probabilidade [J] de ocorrer
uma descarga de projeto com tempo de recorrência TR dentro na vida útil da obra, fixada
em anos, utiliza-se a equação abaixo:
J=1−(1− 1TR )
n
Onde,
n: Vida útil [anos];
J: Risco [%];
TR: Período de recorrência [anos].
O gráfico a seguir ilustra este comportamento.
Gráfico 5-1 - Risco de ocorrer enchente maior
Para os bueiros tubulares foi utilizado um tempo de recorrência igual a 15 anos
(canal) e para os celulares, 25 anos (orifício).
Cálculo das descargas de pico das bacias
42
O método utilizado para os cálculos das descargas de projeto levou em consideração
a área de contribuição, sendo adotado para bacias com área inferior a 10 km² o método
racional, com Tempo de Concentração obtido pelo método de Kirpich.
Método racional
Para determinação das descargas das bacias com área inferior a 10 km² adotou-se o
método racional, cuja expressão é enunciada pela seguinte fórmula:
Qc=C×I × A3,60
Onde:
Qc : Descarga de projeto [m³/s];
C : Coeficiente de escoamento superficial;
I : Intensidade para chuva com duração igual ao TC [mm/h];
A : Área da bacia drenada [km²];
3,6 : Fator de conversão de unidades.
5.4.4 Resultados obtidos
Os dados referentes às bacias de contribuição constam no dimensionamento dos
bueiros tubulares e são apresentados no capitulo referente ao projeto de drenagem,
particularizadas por trecho.
5.5 ESTUDO PARA DRENAGEM
O presente item de estudo objetivou proteger o segmento viário em estudo das
águas que, de algum modo, possam prejudicá-lo ou que ao traçado intercepta.
Com este intuito foi desenvolvido um plano de escoamento de águas visando à
captação, condução e deságue em local seguro, das águas que se precipitem diretamente
sobre o corpo estradal ou a ele afluam provenientes de áreas adjacentes.
Em se tratando de projetos viários geralmente há segmentos já implantados, sempre
que possível, o estudo objetivou aproveitar a rede existente, adaptando para tanto os
43
dispositivos já implantados mediante previsão do seu integral aproveitamento ou
remanejamento e adaptação.
Os bueiros tubulares foram projetados de forma a permitir o escoamento das águas
drenadas pelo sistema superficial da via ou permitir a transposição de cursos de água já
existentes.
Para a verificação hidráulica, inicialmente efetivou-se o pré-dimensionamento
utilizando a fórmula:
Onde:
D Diâmetro pré-dimensionado;
Q Vazão de contribuição para;
n Coeficiente de Manning;
I Declividade.
O diâmetro pré-dimensionado foi ajustado para um diâmetro comercial e este
verificado quanto ao regime crítico, ou seja, a capacidade de escoamento.
Procedeu-se em seguida a verificação da velocidade de escoamento de forma a ter-
se um bueiro que apresentasse uma velocidade mínima que permitisse a auto limpeza,
estabeleceu-se para tanto a velocidade de 2,00m/s. A expressão utilizada para verificar a
velocidade obtida foi a seguinte:
V = [0,397 x D2/3 x I1/2] / n
V Velocidade média [m/s];
D Diâmetro [m];
I Declividade [%];
n Coeficiente de rugosidade de Manning [n =0,015].
44
O dimensionamento ou verificação da capacidade hidráulica dos bueiros celulares
(retangulares) fundamentou-se nas vazões obtidas no âmbito dos estudos hidrológicos,
considerando-se o período de recorrência e vazões calculadas.
O sistema constituído por calhas retangulares de concreto foi calculado
considerando-se a expressão básica de Manning para condutos livres, admitindo-se regime
de escoamento uniforme.
O dimensionamento desenvolvido considerou o modelo proposto por SANTOS,
M.J.M. dos, que se constitui de adaptação prática a expressão de Manning.
Neste modelo, conhecendo-se a vazão a escoar e a declividade do dispositivo, pode-
se determinar os elementos da seção transversal a partir da determinação da profundidade
hidráulica, calculada por:
Onde:
Z Profundidade hidráulica;
n Coeficiente de rugosidade de Manning;
I Declividade do dispositivo [m/m];
Q Vazão de contribuição.
De posse da profundidade hidráulica e dos fatores de forma K e K1, obtidos pelas
expressões apresentadas a seguir, dimensionam-se as dimensões Y (altura) e B (base) do
dispositivo.
45
Onde:
b base do dispositivo;
y altura do dispositivo;
z inclinação do talude.
As dimensões do canal, considerando-se a profundidade hidráulica Z, são dadas por:
Os dispositivos de drenagem superficial foram projetados de forma a permitir o
rápido escoamento das águas pluviais que afluem sobre a pista. No âmbito deste Projeto
foram previstos os seguintes dispositivos:
Meio fios tipo pré-moldado de concreto;
A capacidade de vazão dos dispositivos, anteriormente relacionados, foi calculada
pela equação da continuidade, associada à fórmula de Manning. A equação de
continuidade é expressa pela fórmula:
Onde:
Q Vazão [m³/ s];
A Seção de vazão do dispositivo [m²];
V Velocidade de escoamento, obtida pela expressão de Manning [m/s]:
Onde:
46
n Coeficiente de rugosidade de Manning;
R Raio hidráulico;
I Declividade [m/m].
O cálculo dos deflúvios superficiais relativos às áreas a serem drenadas pelos
dispositivos de drenagem superficial foi determinado pelo método racional, tendo sido
adotado o coeficiente de escoamento C = 0,50 para os segmentos relativos à drenagem da
pista pavimentada.
Para os bueiros tubulares foi utilizado um tempo de recorrência igual a 15 anos
(canal) e para os celulares, 25 anos (orifício).
Admitiu-se como premissa para o desenvolvimento deste projeto valores nunca
inferiores a 10 min, conforme preconiza o PLANEPAR para avaliação de sistemas de
drenagem inseridos no contexto urbano.
Conhecendo-se os parâmetros de dimensionamento, procedeu-se o cálculo do
dimensionamento hidráulico dos dispositivos determinando-se o comprimento crítico dos
vários dispositivos, que é a extensão em que o dispositivo atinge sua capacidade hidráulica,
cuja determinação foi efetuada dividindo-se a capacidade de escoamento do dispositivo
(variável em função da declividade longitudinal) pela vazão contribuinte, conforme consta na
tabela a seguir.
47
Tabela 5.12 - Comprimento crítico MFC 05
Seção tipo:B1 = 0,000 mB2 = 1,500 mY = 0,030 m
Am = 0,023 m²Pm = 1,543 mRh = 0,015 m
n = 0,015Q = 0,090 I1/2
Obs.: Cotas em centimetros.
Tangente Curva Tangente6,00 12,00 1,66E-04
0,25 0,004 26,9 0,50 0,006 38,1 0,75 0,008 46,6 1,00 0,009 53,9 1,50 0,011 66,0 2,00 0,013 76,2 2,50 0,014 85,2 3,00 0,016 93,3 4,00 0,018 107,7 5,00 0,020 120,4 6,00 0,022 131,9 7,00 0,024 142,5 8,00 0,025 152,3 9,00 0,027 161,6
10,00 0,028 170,3 85,2
53,9 60,2 66,0 71,2 76,2 80,8
23,3 26,9 33,0 38,1 42,6 46,6
i (%) Q (m³/s) Tangente Curva
13,5 19,0
Vazão de Contribuíção
Área de Cont. (m²/m) Qcont. (m³/s)/mCurva
3,33E-04
Comprimentos críticos (m)
Capacidade hidráulica
Geometria(Trapézio)
0
10
20
30
40
50
60
70
80
90
100
0 5 10
Com
prim
ento
crí
tico
(m)
i (%)
48
6 PROJETOS EXECUTIVOS
Os projetos desenvolvidos observaram os aspectos metodológicos e deverão ser
implantados conforme informações constantes do Volume 3: Especificações e aspectos
metodológicos. As informações a seguir simplesmente apresentam os resultados dos vários
itens de projeto desenvolvidos.
Os itens de projeto desenvolvidos são os seguintes:
Projeto geométrico e terraplenagem;
Projeto de drenagem;
Projeto de pavimentação
Projeto de sinalização.
6.1 PROJETO GEOMÉTRICO E DE TERRAPLENAGEM
6.1.1 Projeto geométrico
O projeto geométrico contemplou a implantação da pista com caimento único para
um dos bordos com o objetivo de otimizar a rede de drenagem.
A largura da pista de rolamento foi projetada de acordo com o espaço disponível
para a implantação da pavimentação.
As vias restringem-se ao tráfego local de moradores.
Foram projetadas calçadas nas ruas onde a largura permitiu, em um lado ou nos dois
lados da pista com no mínimo 1,00m de largura ou até o limite dos terrenos, e ainda
contarão com rampas de acessibilidade para os pedestres.
O projeto geométrico desenvolvido apresenta as seguintes características:
49
0 + 0,00 29 + 0,00 580,0 4,0 a 8,6 D/E mín. 1,10 10 30 1000 Esquerdo Sim100 + 0,00 110 + 13,00 213,0 4,0 a 6,0 D/E mín. 1,10 5 15 300 Direito Sim600 + 0,00 615 + 1,00 301,0 5,1 a 6,0 D/E mín. 1,40 2 500 5000 Direito Sim700 + 0,00 715 + 1,00 301,0 6,0 D/E mín. 1,10 1 500 500 Direito Sim800 + 0,00 816 + 4,00 324,0 4,6 a 7,0 D/E mín. 1,10 1 500 500 Esquerdo Sim
1100 + 0,00 1105 + 14,00 114,0 3,8 a 4,0 D/E mín. 1,00 1 50 50 Esquerdo Sim
RAIOMÁXIMO
CAIMENTO DRENAGEMCALÇADA LARGURA DACALÇADA
LARGURA DAPLATAFORMA
ESTACAS EXT. (m) QUANTIDADEDE CURVAS
RAIOMÍNIMO
A nota de serviço de regularização para os segmentos em estudo, definida observando a conformação geométrica em planta e
perfil, esta apresentada a seguir:
50
Tabela 6.13 - Nota de Serviço de Regularização - Ramo 0
COTA(FIM)
DIST COTA(INÍCIO)
COTA DIST X Y DIST COTA COTA(INÍCIO)
DIST COTA(FIM)
0 + 0,00 43,921 -2,00 -2,00% 354.624,800 7.760.298,000 43,961 2,00% 2,00 44,0010 + 10,00 44,475 -2,00 -2,00% 354.626,600 7.760.288,000 44,515 2,00% 2,00 44,5551 + 0,00 45,272 -2,00 -2,00% 354.628,400 7.760.278,000 45,312 2,00% 3,82 45,3881 + 10,00 46,364 -2,00 -2,00% 354.630,000 7.760.268,000 46,404 2,00% 2,00 46,4442 + 0,00 47,444 -2,00 -2,00% 354.631,000 7.760.258,000 47,484 2,00% 2,00 47,5242 + 10,00 48,205 -2,00 -2,00% 354.632,600 7.760.248,000 48,245 2,00% 2,00 48,2853 + 0,00 48,645 -2,00 -2,00% 354.634,400 7.760.238,000 48,685 2,00% 2,00 48,7253 + 10,00 48,925 -2,00 -2,00% 354.636,200 7.760.229,000 48,965 2,00% 2,00 49,0054 + 0,00 49,206 -2,00 -2,00% 354.638,000 7.760.219,000 49,246 2,00% 2,00 49,2864 + 10,00 49,502 -2,00 -2,00% 354.641,000 7.760.209,000 49,542 2,00% 2,00 49,5825 + 0,00 51,920 -10,00 01:00,2 354.644,400 7.760.200,000 50,356 2,00% 2,00 50,3965 + 10,00 50,927 -3,02 -2,00% 354.647,600 7.760.190,000 50,987 2,00% 2,00 51,0276 + 0,00 51,137 -2,00 -2,00% 354.650,500 7.760.181,000 51,177 2,00% 2,00 51,2176 + 10,00 51,314 -2,00 -2,00% 354.653,400 7.760.171,000 51,354 2,00% 2,00 51,3947 + 0,00 51,491 -2,00 -2,00% 354.656,200 7.760.162,000 51,531 2,00% 2,00 51,5717 + 10,00 51,668 -2,00 -2,00% 354.659,000 7.760.152,000 51,708 2,00% 2,00 51,7488 + 0,00 51,845 -2,00 -2,00% 354.662,000 7.760.142,000 51,885 2,00% 2,00 51,9258 + 10,00 52,014 -2,00 -2,00% 354.665,000 7.760.133,000 52,054 2,00% 2,00 52,0949 + 0,00 52,132 -2,00 -2,00% 354.668,100 7.760.123,000 52,172 2,00% 2,00 52,2129 + 10,00 52,191 -2,00 -2,00% 354.671,400 7.760.114,000 52,231 2,00% 2,00 52,271
10 + 0,00 52,190 -2,04 -2,00% 354.674,700 7.760.105,000 52,230 2,00% 2,02 52,27110 + 10,00 52,121 -2,49 -2,00% 354.678,100 7.760.095,000 52,171 2,00% 2,31 52,21711 + 0,00 51,996 -2,83 -2,00% 354.681,600 7.760.086,000 52,052 2,00% 2,70 52,10611 + 10,00 51,815 -3,00 -2,00% 354.685,200 7.760.076,000 51,875 2,00% 3,00 51,93512 + 0,00 51,578 -3,00 -2,00% 354.688,800 7.760.067,000 51,638 2,00% 3,00 51,69812 + 10,00 51,282 -3,00 -2,00% 354.692,400 7.760.058,000 51,342 2,00% 3,00 51,402 51,402 3,67 51,41613 + 0,00 50,880 -5,40 50,928 50,928 -3,00 -2,00% 354.696,200 7.760.049,000 50,988 2,00% 3,00 51,048 51,048 4,81 51,08413 + 10,00 50,466 -5,40 50,514 50,514 -3,00 -2,00% 354.700,300 7.760.039,000 50,574 2,00% 3,00 50,634 50,634 4,72 50,66814 + 0,00 50,000 -5,05 50,041 50,041 -3,00 -2,00% 354.704,700 7.760.030,000 50,101 2,00% 3,00 50,161 50,161 4,79 50,19614 + 10,00 49,469 -4,97 49,509 49,509 -3,00 -2,00% 354.709,500 7.760.022,000 49,569 2,00% 3,00 49,629 49,629 5,16 49,672
BORDO PISTAi
(%)
COORDENADASCOTA i
(%)
BORDO PISTA
Ramo 0
CALÇADALADO ESQUERDO EIXO LADO DIREITO
CALÇADAESTACAS
51
Tabela 6.14 - Nota de Serviço - Ramo 0 (continuação)
COTA(FIM)
DIST COTA(INÍCIO)
COTA DIST X Y DIST COTA COTA(INÍCIO)
DIST COTA(FIM)
15 + 0,00 48,886 -4,57 48,917 48,917 -3,00 -2,00% 354.714,600 7.760.013,000 48,977 2,00% 3,00 49,037 49,037 5,33 49,08415 + 10,00 48,284 -4,25 48,309 48,309 -3,00 -2,00% 354.719,900 7.760.005,000 48,369 2,00% 2,09 48,411 48,411 3,09 48,43116 + 0,00 47,780 -4,43 47,798 47,798 -3,56 -2,00% 354.725,200 7.759.996,000 47,869 2,00% 2,10 47,911 47,911 3,10 47,93116 + 10,00 47,343 -4,60 47,363 47,363 -3,60 -2,00% 354.730,500 7.759.988,000 47,435 2,00% 5,00 47,535 47,535 6,00 47,55517 + 0,00 46,688 -3,91 46,718 46,718 -2,40 -2,00% 354.735,900 7.759.979,000 46,766 2,00% 3,00 46,82617 + 10,00 45,748 -3,63 45,773 45,773 -2,40 -2,00% 354.741,200 7.759.971,000 45,821 2,00% 3,00 45,88118 + 0,00 44,732 -4,10 44,766 44,766 -2,40 -2,00% 354.746,600 7.759.962,000 44,814 2,00% 3,00 44,87418 + 10,00 43,483 -4,10 43,505 43,505 -3,00 -2,00% 354.752,400 7.759.954,000 43,565 2,00% 3,00 43,62519 + 0,00 42,042 -4,10 42,064 42,064 -3,00 -2,00% 354.758,900 7.759.947,000 42,124 2,00% 3,00 42,18419 + 10,00 41,251 -4,10 41,273 41,273 -3,00 -2,00% 354.765,100 7.759.939,000 41,333 2,00% 3,00 41,39320 + 0,00 41,280 -4,10 41,302 41,302 -3,00 -2,00% 354.770,800 7.759.931,000 41,362 2,00% 3,00 41,42220 + 10,00 41,624 -4,10 41,646 41,646 -3,00 -2,00% 354.776,100 7.759.922,000 41,706 2,00% 3,00 41,76621 + 0,00 42,283 -4,10 42,305 42,305 -3,00 -2,00% 354.781,100 7.759.913,000 42,365 2,00% 3,00 42,42521 + 10,00 43,076 -4,10 43,098 43,098 -3,00 -2,00% 354.786,100 7.759.905,000 43,158 2,00% 3,00 43,21822 + 0,00 43,567 -4,10 43,589 43,589 -3,00 -2,00% 354.791,100 7.759.896,000 43,649 2,00% 3,00 43,70922 + 10,00 43,815 -4,10 43,837 43,837 -3,00 -2,00% 354.796,100 7.759.887,000 43,897 2,00% 3,00 43,95723 + 0,00 44,058 -4,10 44,080 44,080 -3,00 -2,00% 354.801,100 7.759.879,000 44,140 2,00% 3,00 44,20023 + 10,00 44,354 -4,10 44,376 44,376 -3,00 -2,00% 354.806,100 7.759.870,000 44,436 2,00% 3,00 44,49624 + 0,00 44,754 -4,10 44,775 44,775 -3,00 -2,00% 354.811,100 7.759.861,000 44,835 2,00% 2,03 44,87624 + 10,00 45,206 -4,10 45,227 45,227 -3,00 -2,00% 354.816,100 7.759.853,000 45,287 2,00% 2,00 45,32725 + 0,00 45,658 -4,10 45,679 45,679 -3,00 -2,00% 354.821,100 7.759.844,000 45,739 2,00% 2,00 45,77925 + 10,00 46,110 -4,09 46,131 46,131 -3,00 -2,00% 354.826,100 7.759.835,000 46,191 2,00% 2,00 46,23126 + 0,00 46,561 -4,11 46,584 46,584 -3,00 -2,00% 354.831,600 7.759.827,000 46,644 2,00% 2,00 46,68426 + 10,00 47,014 -4,10 47,036 47,036 -3,00 -2,00% 354.839,400 7.759.821,000 47,096 2,00% 3,00 47,15627 + 0,00 47,466 -4,10 47,488 47,488 -3,00 -2,00% 354.848,700 7.759.818,000 47,548 2,00% 2,79 47,60327 + 10,00 47,920 -3,98 47,942 47,942 -2,88 -2,00% 354.858,600 7.759.816,000 48,000 2,00% 7,99 48,15928 + 0,00 48,266 -4,69 48,291 48,291 -3,46 -2,00% 354.868,000 7.759.812,000 48,360 2,00% 3,34 48,427 48,427 4,34 48,44728 + 10,00 48,625 -10,00 0,89% 354.876,500 7.759.807,000 48,536 2,00% 3,82 48,613 48,613 4,82 48,63329 + 0,00 48,870 -4,50 48,538 48,538 -4,17 -2,00% 354.884,400 7.759.801,000 48,621 2,00% 4,04 48,702 48,702 5,04 48,722
BORDO PISTAi
(%)
COORDENADASCOTA i
(%)
BORDO PISTA
Ramo 0
CALÇADALADO ESQUERDO EIXO LADO DIREITO
CALÇADAESTACAS
52
Tabela 6.15 - Nota de Serviço - Ramo 100
COTA(FIM)
DIST COTA(INÍCIO)
COTA DIST X Y DIST COTA COTA(INÍCIO)
DIST COTA(FIM)
100 + 0,00 37,598 -3,00 37,578 37,578 -2,00 2,00% 354.682,600 7.759.960,000 37,538 -2,00% 2,00 37,498 37,498 3,00 37,478100 + 10,00 38,407 -7,66 38,387 38,387 -6,66 2,00% 354.692,500 7.759.958,000 38,254 -2,00% 3,91 38,176 38,176 4,91 38,156101 + 0,00 39,459 -5,43 39,439 39,439 -4,43 2,00% 354.702,100 7.759.960,000 39,350 -2,00% 3,82 39,274 39,274 6,19 39,226101 + 10,00 41,626 -3,99 41,606 41,606 -2,99 2,00% 354.709,300 7.759.967,000 41,546 -2,00% 3,00 41,486 41,486 4,43 41,457102 + 0,00 43,874 -3,09 43,854 43,854 -2,09 2,00% 354.716,000 7.759.974,000 43,812 -2,00% 3,00 43,752 43,752 4,15 43,729102 + 10,00 46,147 -3,50 46,119 46,119 -2,10 2,00% 354.722,700 7.759.982,000 46,077 -2,00% 3,00 46,017 46,017 4,14 45,995103 + 0,00 47,593 -3,10 47,573 47,573 -2,10 2,00% 354.729,200 7.759.989,000 47,531 -2,00% 3,00 47,471 47,471 4,00 47,451103 + 10,00 48,402 -5,16 48,352 48,352 -2,66 2,00% 354.736,200 7.759.996,000 48,299 -2,00% 3,00 48,239 48,239 4,72 48,204104 + 0,00 48,917 -4,88 48,879 48,879 -3,00 2,00% 354.744,600 7.760.002,000 48,819 -2,00% 3,00 48,759 48,759 4,25 48,734104 + 10,00 48,642 -4,75 48,607 48,607 -3,00 2,00% 354.753,100 7.760.007,000 48,547 -2,00% 2,50 48,497 48,497 3,75 48,472105 + 0,00 48,104 -4,39 48,076 48,076 -2,98 2,00% 354.761,700 7.760.012,000 48,016 -2,00% 2,98 47,957 47,957 4,67 47,923105 + 10,00 47,389 -4,01 47,369 47,369 -3,01 2,00% 354.770,400 7.760.017,000 47,308 -2,00% 9,99 47,108 47,108 10,00 47,273106 + 0,00 46,148 -4,56 46,117 46,117 -3,00 2,00% 354.778,900 7.760.022,000 46,057 -2,00% 2,67 46,003 46,003 4,08 45,975106 + 10,00 44,331 -4,01 44,310 44,310 -3,00 2,00% 354.787,400 7.760.028,000 44,250 -2,00% 2,67 44,197 44,197 3,77 44,175107 + 0,00 42,137 -3,51 42,127 42,127 -3,00 2,00% 354.795,800 7.760.033,000 42,067 -2,00% 2,55 42,016 42,016 3,83 41,990107 + 10,00 39,932 -3,00 2,00% 354.804,200 7.760.039,000 39,872 -2,00% 2,42 39,824 39,824 4,36 39,785108 + 0,00 37,738 -3,00 2,00% 354.812,700 7.760.044,000 37,678 -2,00% 2,80 37,622 37,622 8,10 37,516108 + 10,00 35,530 -3,00 2,00% 354.821,100 7.760.049,000 35,470 -2,00% 3,00 35,410 35,410 4,00 35,390109 + 0,00 33,032 -2,99 2,00% 354.829,500 7.760.055,000 32,972 -2,00% 3,00 32,912 32,912 4,00 32,892109 + 10,00 30,127 -2,99 2,00% 354.837,900 7.760.060,000 30,068 -2,00% 3,00 30,008 30,008 4,00 29,988110 + 0,00 26,932 -2,99 2,00% 354.846,400 7.760.065,000 26,872 -2,00% 3,01 26,812 26,812 4,00 26,792110 + 10,00 24,325 -3,50 2,00% 354.854,800 7.760.071,000 24,255 -2,00% 2,87 24,198 24,198 4,00 24,175
BORDO PISTAi
(%)
COORDENADASCOTA i
(%)
BORDO PISTA
Ramo 100
CALÇADALADO ESQUERDO EIXO LADO DIREITO
CALÇADAESTACAS
53
Tabela 6.16 - Nota de Serviço - Ramo 600
COTA(FIM)
DIST COTA(INÍCIO)
COTA DIST X Y DIST COTA COTA(INÍCIO)
DIST COTA(FIM)
600 + 0,00 0,000 0,00 0,000 28,640 -3,00 2,00% 355.203,500 7.760.158,000 28,580 -2,00% 3,00 28,520 28,520 4,00 28,500600 + 10,00 31,607 -4,97 31,567 31,567 -3,00 2,00% 355.210,400 7.760.151,000 31,507 -2,00% 3,00 31,447 31,447 4,43 31,419601 + 0,00 34,532 -4,85 34,495 34,495 -3,00 2,00% 355.217,200 7.760.143,000 34,435 -2,00% 3,00 34,375 34,375 4,65 34,342601 + 10,00 37,466 -5,18 37,422 37,422 -3,00 2,00% 355.224,100 7.760.136,000 37,362 -2,00% 3,00 37,302 37,302 4,41 37,274602 + 0,00 40,393 -5,36 40,346 40,346 -3,00 2,00% 355.231,000 7.760.129,000 40,286 -2,00% 2,98 40,227 40,227 4,07 40,205602 + 10,00 42,992 -5,44 42,943 42,943 -3,00 2,00% 355.237,800 7.760.122,000 42,883 -2,00% 2,11 42,841 42,841 3,63 42,810603 + 0,00 45,038 -5,47 44,988 44,988 -3,00 2,00% 355.244,400 7.760.114,000 44,928 -2,00% 2,10 44,886 44,886 3,35 44,862603 + 10,00 46,537 -5,56 46,489 46,489 -3,17 2,00% 355.250,900 7.760.106,000 46,426 -2,00% 3,25 46,361 46,361 5,21 46,322604 + 0,00 47,814 -5,72 47,758 47,758 -2,93 2,00% 355.257,400 7.760.099,000 47,700 -2,00% 3,00 47,640 47,640 5,13 47,597604 + 10,00 49,076 -5,10 49,033 49,033 -2,95 2,00% 355.263,900 7.760.091,000 48,974 -2,00% 3,00 48,914 48,914 5,08 48,873605 + 0,00 50,347 -4,93 31,567 50,308 -2,97 2,00% 355.270,400 7.760.084,000 50,248 -2,00% 3,00 50,188 50,188 5,15 50,145605 + 10,00 51,105 -4,79 51,069 51,069 -3,00 2,00% 355.276,900 7.760.076,000 51,009 -2,00% 3,00 50,949 50,949 5,20 50,906606 + 0,00 51,640 -4,87 51,602 51,602 -3,00 2,00% 355.283,400 7.760.068,000 51,542 -2,00% 3,00 51,482 51,482 5,01 51,442606 + 10,00 51,982 -4,83 51,946 51,946 -3,00 2,00% 355.290,000 7.760.061,000 51,886 -2,00% 3,00 51,826 51,826 4,93 51,787607 + 0,00 52,138 -4,95 52,099 52,099 -3,00 2,00% 355.296,500 7.760.053,000 52,039 -2,00% 3,00 51,979 51,979 5,16 51,936607 + 10,00 52,106 -5,11 52,064 52,064 -3,00 2,00% 355.303,000 7.760.046,000 52,004 -2,00% 3,00 51,944 51,944 5,01 51,904608 + 0,00 51,877 -4,92 51,839 51,839 -3,00 2,00% 355.309,600 7.760.038,000 51,779 -2,00% 3,00 51,719 51,719 4,88 51,681608 + 10,00 51,533 -5,38 51,485 51,485 -3,00 2,00% 355.316,100 7.760.031,000 51,425 -2,00% 3,00 51,365 51,365 4,72 51,331609 + 0,00 51,168 -5,01 51,128 51,128 -3,00 2,00% 355.322,700 7.760.023,000 51,068 -2,00% 3,00 51,008 51,008 4,81 50,971609 + 10,00 50,810 -4,97 50,770 50,770 -3,00 2,00% 355.329,200 7.760.016,000 50,710 -2,00% 3,00 50,650 50,650 4,87 50,613610 + 0,00 50,453 -5,01 50,413 50,413 -3,00 2,00% 355.335,800 7.760.008,000 50,353 -2,00% 3,00 50,293 50,293 4,62 50,260610 + 10,00 50,168 -5,05 50,127 50,127 -3,00 2,00% 355.342,300 7.760.000,000 50,067 -2,00% 3,00 50,007 50,007 4,81 49,971611 + 0,00 50,026 -5,05 49,985 49,985 -3,00 2,00% 355.348,900 7.759.993,000 49,925 -2,00% 3,00 49,865 49,865 4,93 49,827611 + 10,00 49,957 -5,08 49,915 49,915 -3,00 2,00% 355.355,400 7.759.985,000 49,855 -2,00% 3,00 49,795 49,795 5,09 49,754612 + 0,00 49,884 -4,90 49,846 49,846 -3,00 2,00% 355.362,000 7.759.978,000 49,786 -2,00% 3,00 49,726 49,726 4,93 49,687612 + 10,00 49,816 -5,03 49,776 49,776 -3,00 2,00% 355.368,500 7.759.970,000 49,716 -2,00% 3,00 49,656 49,656 4,93 49,617613 + 0,00 49,735 -5,01 49,695 49,695 -3,00 2,00% 355.375,100 7.759.963,000 49,635 -2,00% 3,00 49,575 49,575 4,84 49,538613 + 10,00 49,575 -5,00 49,535 49,535 -3,00 2,00% 355.381,600 7.759.955,000 49,475 -2,00% 3,00 49,415 49,415 4,88 49,378
BORDO PISTAi
(%)
COORDENADASCOTA i
(%)
Ramo 600
BORDO PISTA CALÇADALADO ESQUERDO EIXO LADO DIREITO
CALÇADAESTACAS
54
Tabela 6.17 - Nota de Serviço - Ramo 600 (continuação)
COTA(FIM)
DIST COTA(INÍCIO)
COTA DIST X Y DIST COTA COTA(INÍCIO)
DIST COTA(FIM)
614 + 0,00 49,328 -5,09 49,286 49,286 -3,00 2,00% 355.388,200 7.759.947,000 49,226 -2,00% 3,00 49,166 49,166 4,92 49,128614 + 10,00 48,990 -5,17 48,947 48,947 -3,00 2,00% 355.394,700 7.759.940,000 48,887 -2,00% 3,00 48,827 48,827 4,92 48,789615 + 0,00 48,559 -4,50 48,539 48,539 -3,50 2,00% 355.401,300 7.759.932,000 48,469 -2,00% 3,50 48,399 48,399 4,50 48,379615 + 1,00 48,517 -4,50 48,497 48,497 -3,50 2,00% 355.401,912 7.759.931,615 48,427 -2,00% 3,50 48,357 48,357 4,50 48,337
BORDO PISTAi
(%)
COORDENADASCOTA i
(%)
Ramo 600
BORDO PISTA CALÇADALADO ESQUERDO EIXO LADO DIREITO
CALÇADAESTACAS
Tabela 6.18 - Nota de Serviço - Ramo 700
COTA(FIM)
DIST COTA(INÍCIO)
COTA DIST X Y DIST COTA COTA(INÍCIO)
DIST COTA(FIM)
700 + 0,00 33,111 -3,00 -2,00% 355.241,809 7.760.191,365 33,051 2,00% 3,00 32,991700 + 10,00 36,088 -3,00 -2,00% 355.248,379 7.760.183,829 36,028 2,00% 3,00 35,968 35,968 4,04 35,947701 + 0,00 38,991 -3,32 38,668 38,668 -3,00 -2,00% 355.254,951 7.760.176,291 38,608 2,00% 3,00 38,548 38,548 4,17 38,525701 + 10,00 41,118 -4,75 41,083 41,083 -3,00 -2,00% 355.261,522 7.760.168,753 41,023 2,00% 3,00 40,963 40,963 4,18 40,939702 + 0,00 43,654 -5,33 43,608 43,608 -3,00 -2,00% 355.268,094 7.760.161,216 43,548 2,00% 3,00 43,488 43,488 4,18 43,464702 + 10,00 45,332 -5,44 45,284 45,284 -3,00 -2,00% 355.274,665 7.760.153,678 45,224 2,00% 3,00 45,164 45,164 3,98 45,144703 + 0,00 47,427 -5,35 47,380 47,380 -3,00 -2,00% 355.281,237 7.760.146,141 47,320 2,00% 2,32 47,274 47,274 4,32 47,234703 + 10,00 48,183 -6,76 48,109 48,109 -3,08 -2,00% 355.287,808 7.760.138,603 48,048 2,00% 3,08 47,986 47,986 5,59 47,936704 + 0,00 49,285 -5,18 49,242 49,242 -3,00 -2,00% 355.294,380 7.760.131,065 49,182 2,00% 3,00 49,122 49,122 4,75 49,087704 + 10,00 50,073 -5,02 50,032 50,032 -3,00 -2,00% 355.300,951 7.760.123,528 49,972 2,00% 3,00 49,912 49,912 4,66 49,879705 + 0,00 50,765 -5,28 50,719 50,719 -3,00 -2,00% 355.307,523 7.760.115,990 50,659 2,00% 3,00 50,599 50,599 4,72 50,565705 + 10,00 51,187 -5,31 51,140 51,140 -3,00 -2,00% 355.314,094 7.760.108,453 51,080 2,00% 3,00 51,020 51,020 4,59 50,989706 + 0,00 51,354 -5,38 51,306 51,306 -3,00 -2,00% 355.320,666 7.760.100,915 51,246 2,00% 3,00 51,186 51,186 4,51 51,156706 + 10,00 51,181 -5,46 51,132 51,132 -3,00 -2,00% 355.327,237 7.760.093,377 51,072 2,00% 3,00 51,012 51,012 4,62 50,980
BORDO PISTAi
(%)
Ramo 700
COORDENADASCOTA i
(%)
BORDO PISTA CALÇADALADO ESQUERDO EIXO LADO DIREITO
CALÇADAESTACAS
55
Tabela 6.19 - Nota de Serviço - Ramo 700 (continuação)
COTA(FIM)
DIST COTA(INÍCIO)
COTA DIST X Y DIST COTA COTA(INÍCIO)
DIST COTA(FIM)
707 + 0,00 50,772 -5,28 50,726 50,726 -3,00 -2,00% 355.333,809 7.760.085,840 50,666 2,00% 3,00 50,606 50,606 4,64 50,573707 + 10,00 50,073 -3,95 50,054 50,054 -3,00 -2,00% 355.340,380 7.760.078,302 49,994 2,00% 3,00 49,934 49,934 4,66 49,901708 + 0,00 49,628 -4,88 49,591 49,591 -3,00 -2,00% 355.346,952 7.760.070,765 49,531 2,00% 3,00 49,471 49,471 4,70 49,437708 + 10,00 49,503 -4,97 49,463 49,463 -3,00 -2,00% 355.353,523 7.760.063,227 49,403 2,00% 3,00 49,343 49,343 4,67 49,310709 + 0,00 49,470 -5,04 49,429 49,429 -3,00 -2,00% 355.360,095 7.760.055,689 49,369 2,00% 3,00 49,309 49,309 4,82 49,273709 + 10,00 49,478 -5,13 49,436 49,436 -3,00 -2,00% 355.366,666 7.760.048,152 49,376 2,00% 3,00 49,316 49,316 4,94 49,277710 + 0,00 49,487 -5,05 49,446 49,446 -3,00 -2,00% 355.373,238 7.760.040,614 49,386 2,00% 3,00 49,326 49,326 5,07 49,285710 + 10,00 49,577 -5,01 49,537 49,537 -3,00 -2,00% 355.379,809 7.760.033,077 49,477 2,00% 3,00 49,417 49,417 4,90 49,379711 + 0,00 49,797 -5,00 49,757 49,757 -3,00 -2,00% 355.386,381 7.760.025,539 49,697 2,00% 3,00 49,637 49,637 4,56 49,606711 + 10,00 50,203 -5,39 50,155 50,155 -3,00 -2,00% 355.392,952 7.760.018,001 50,095 2,00% 3,00 50,035 50,035 4,68 50,002712 + 0,00 50,963 -5,36 50,916 50,916 -3,00 -2,00% 355.399,524 7.760.010,464 50,856 2,00% 3,00 50,796 50,796 4,78 50,760712 + 10,00 51,641 -5,39 51,594 51,594 -3,00 -2,00% 355.406,095 7.760.002,926 51,534 2,00% 3,00 51,474 51,474 4,48 51,444713 + 0,00 52,077 -5,01 52,037 52,037 -3,00 -2,00% 355.412,667 7.759.995,389 51,977 2,00% 3,00 51,917 51,917 4,54 51,886713 + 10,00 52,219 -5,06 52,177 52,177 -3,00 -2,00% 355.419,238 7.759.987,851 52,117 2,00% 3,00 52,057 52,057 4,67 52,024714 + 0,00 52,242 -5,12 52,200 52,200 -3,00 -2,00% 355.425,810 7.759.980,313 52,140 2,00% 3,00 52,080 52,080 4,99 52,040714 + 10,00 52,208 -5,18 52,164 52,164 -3,00 -2,00% 355.432,381 7.759.972,776 52,104 2,00% 3,00 52,044 52,044 5,15 52,001715 + 0,00 52,034 -4,50 52,014 52,014 -3,50 -2,00% 355.438,953 7.759.965,238 51,944 2,00% 3,50 51,874715 + 1,00 52,024 -4,50 52,004 52,004 -3,50 -2,00% 355.439,610 7.759.964,484 51,934 2,00% 3,50 51,864
BORDO PISTAi
(%)
Ramo 700
COORDENADASCOTA i
(%)
BORDO PISTA CALÇADALADO ESQUERDO EIXO LADO DIREITO
CALÇADAESTACAS
56
Tabela 6.20 - Nota de Serviço - Ramo 800
COTA(FIM)
DIST COTA(INÍCIO)
COTA DIST X Y DIST COTA COTA(INÍCIO)
DIST COTA(FIM)
800 + 0,00 38,466 -3,50 38,490 38,490 -2,30 -2,00% 355.266,225 7.760.242,402 38,536 2,00% 2,30 38,582 38,582 3,50 38,606800 + 10,00 40,334 -3,97 40,367 40,367 -2,30 -2,00% 355.272,463 7.760.234,586 40,413 2,00% 2,30 40,459 40,459 3,90 40,491801 + 0,00 42,046 -4,28 42,086 42,086 -2,30 -2,00% 355.278,701 7.760.226,771 42,132 2,00% 2,30 42,178 42,178 4,28 42,218801 + 10,00 43,599 -4,42 43,641 43,641 -2,30 -2,00% 355.284,943 7.760.218,958 43,687 2,00% 2,30 43,733 43,733 4,34 43,774802 + 0,00 44,977 -5,11 45,009 45,009 -3,51 -2,00% 355.291,294 7.760.211,234 45,079 2,00% 2,30 45,125 45,125 4,47 45,168802 + 10,00 46,200 -5,34 46,237 46,237 -3,50 -2,00% 355.297,797 7.760.203,637 46,307 2,00% 3,50 46,377 46,377 4,76 46,402803 + 0,00 47,267 -5,20 47,302 47,302 -3,50 -2,00% 355.304,368 7.760.196,099 47,372 2,00% 3,50 47,442 47,442 5,06 47,473803 + 10,00 48,171 -5,07 48,203 48,203 -3,50 -2,00% 355.310,939 7.760.188,561 48,273 2,00% 3,50 48,343 48,343 5,03 48,373804 + 0,00 48,904 -5,28 48,940 48,940 -3,50 -2,00% 355.317,510 7.760.181,023 49,010 2,00% 3,50 49,080 49,080 5,28 49,116804 + 10,00 49,494 -4,50 49,514 49,514 -3,50 -2,00% 355.324,081 7.760.173,485 49,584 2,00% 3,50 49,654 49,654 4,50 49,674805 + 0,00 49,896 -5,19 49,929 49,929 -3,50 -2,00% 355.330,651 7.760.165,947 49,999 2,00% 3,50 50,069 50,069 4,58 50,091805 + 10,00 50,267 -5,09 50,299 50,299 -3,49 -2,00% 355.337,222 7.760.158,408 50,369 2,00% 3,27 50,434 50,434 4,45 50,458806 + 0,00 50,635 -4,95 50,664 50,664 -3,49 -2,00% 355.343,793 7.760.150,870 50,734 2,00% 3,50 50,804 50,804 4,70 50,828806 + 10,00 50,887 -5,12 50,920 50,920 -3,49 -2,00% 355.350,364 7.760.143,332 50,989 2,00% 3,50 51,059 51,059 4,82 51,086807 + 0,00 50,992 -5,09 51,024 51,024 -3,49 -2,00% 355.356,935 7.760.135,794 51,094 2,00% 3,50 51,164 51,164 4,94 51,193807 + 10,00 50,945 -5,08 50,977 50,977 -3,49 -2,00% 355.363,506 7.760.128,256 51,047 2,00% 3,50 51,117 51,117 5,00 51,147
BORDO PISTAi
(%)
COORDENADASCOTA i
(%)
BORDO PISTA
Ramo 800
CALÇADALADO ESQUERDO EIXO LADO DIREITO
CALÇADAESTACAS
57
Tabela 6.21 - Nota de Serviço - Ramo 800 (continuação)
COTA(FIM)
DIST COTA(INÍCIO)
COTA DIST X Y DIST COTA COTA(INÍCIO)
DIST COTA(FIM)
808 + 0,00 50,747 -5,08 50,778 50,778 -3,49 -2,00% 355.370,076 7.760.120,717 50,848 2,00% 3,50 50,918 50,918 5,07 50,950808 + 10,00 50,400 -4,92 50,428 50,428 -3,49 -2,00% 355.376,647 7.760.113,179 50,498 2,00% 3,50 50,568 50,568 6,05 50,619809 + 0,00 49,942 -4,84 49,969 49,969 -3,49 -2,00% 355.383,218 7.760.105,641 50,039 2,00% 3,50 50,109 50,109 6,18 50,163809 + 10,00 49,479 -4,82 49,506 49,506 -3,49 -2,00% 355.389,789 7.760.098,103 49,576 2,00% 3,50 49,646 49,646 5,74 49,690810 + 0,00 49,060 -4,80 49,086 49,086 -3,49 -2,00% 355.396,360 7.760.090,565 49,156 2,00% 3,50 49,226 49,226 5,21 49,260810 + 10,00 48,729 -4,80 48,756 48,756 -3,49 -2,00% 355.402,930 7.760.083,026 48,825 2,00% 3,50 48,895 48,895 5,28 48,931811 + 0,00 48,493 -4,50 48,513 48,513 -3,50 -2,00% 355.409,501 7.760.075,488 48,583 2,00% 3,50 48,653 48,653 5,11 48,685811 + 10,00 48,359 -3,48 -2,00% 355.416,072 7.760.067,950 48,429 2,00% 3,50 48,499 48,499 5,09 48,531812 + 0,00 48,294 -3,48 -2,00% 355.422,643 7.760.060,412 48,364 2,00% 3,50 48,434 48,434 5,11 48,466812 + 10,00 48,317 -3,48 -2,00% 355.429,214 7.760.052,874 48,387 2,00% 3,50 48,457 48,457 5,12 48,489813 + 0,00 48,406 -4,59 48,429 48,429 -3,48 -2,00% 355.435,785 7.760.045,335 48,498 2,00% 3,50 48,568 48,568 5,14 48,601813 + 10,00 48,607 -4,56 48,629 48,629 -3,45 -2,00% 355.442,355 7.760.037,797 48,698 2,00% 3,50 48,768 48,768 5,16 48,802814 + 0,00 48,899 -4,38 48,930 48,930 -2,84 -2,00% 355.448,926 7.760.030,259 48,987 2,00% 3,50 49,057 49,057 5,18 49,091814 + 10,00 49,222 -4,87 49,250 49,250 -3,48 -2,00% 355.455,497 7.760.022,721 49,320 2,00% 3,50 49,390 49,390 5,18 49,423815 + 0,00 49,558 -4,73 49,583 49,583 -3,48 -2,00% 355.462,068 7.760.015,183 49,653 2,00% 3,50 49,723 49,723 5,17 49,756815 + 10,00 49,870 -5,54 49,911 49,911 -3,48 -2,00% 355.468,639 7.760.007,644 49,981 2,00% 3,50 50,051 50,051 5,15 50,084816 + 0,00 49,397 -10,00 50,128 50,128 -3,50 -2,00% 355.475,209 7.760.000,106 50,198 2,00% 3,50 50,268 50,268 4,50 50,288816 + 4,00 50,154 -4,50 50,174 50,174 -3,50 -2,00% 355.477,838 7.759.997,091 50,244 2,00% 3,50 50,314 50,314 4,50 50,334
BORDO PISTAi
(%)
COORDENADASCOTA i
(%)
BORDO PISTA
Ramo 800
CALÇADALADO ESQUERDO EIXO LADO DIREITO
CALÇADAESTACAS
58
Tabela 6.22 - Nota de Serviço - Ramo 1100
COTA(FIM)
DIST COTA(INÍCIO)
COTA DIST X Y DIST COTA COTA(INÍCIO)
DIST COTA(FIM)
1100 + 0,00 47,231 -3,45 47,209 47,209 -2,35 2,00% 355.016,014 7.759.533,375 47,162 -2,00% 1,65 47,129 47,129 2,75 47,1071100 + 10,00 44,690 -3,45 44,670 44,670 -2,35 2,00% 355.010,604 7.759.524,965 44,628 -2,00% 1,65 44,589 44,589 2,75 44,5671101 + 0,00 42,150 -3,45 42,128 42,128 -2,35 2,00% 355.005,193 7.759.516,556 42,081 -2,00% 1,65 42,048 42,048 2,75 42,0261101 + 10,00 39,609 -3,45 39,587 39,587 -2,35 2,00% 354.999,783 7.759.508,146 39,540 -2,00% 1,65 39,507 39,507 2,75 39,4851102 + 0,00 36,727 -2,35 36,728 36,728 -2,26 2,16% 354.994,372 7.759.499,736 36,680 -2,00% 1,65 36,647 36,647 2,75 36,6251102 + 10,00 33,225 -2,35 2,00% 354.988,962 7.759.491,326 33,178 -2,00% 1,65 33,145 33,145 2,75 33,1231103 + 0,00 29,411 -2,76 2,00% 354.983,551 7.759.482,916 29,356 -2,00% 1,25 29,331 29,331 2,35 29,3091103 + 10,00 25,723 -3,15 2,00% 354.978,377 7.759.474,365 25,660 -2,00% 0,86 25,643 25,643 1,96 25,6211104 + 0,00 22,892 -2,17 2,00% 354.974,798 7.759.465,045 22,849 -2,00% 1,83 22,812 22,812 2,93 22,7901104 + 10,00 21,089 -2,00 2,00% 354.973,142 7.759.455,200 21,047 -2,00% 2,00 21,008 21,008 3,10 20,9871105 + 0,00 20,171 -2,00 2,00% 354.973,474 7.759.445,223 20,131 -2,00% 1,00 20,1111105 + 10,00 19,380 -2,00 2,00% 354.974,935 7.759.435,330 19,340 -2,00% 1,00 19,3201105 + 14,00 19,065 -2,00 2,00% 354.975,505 7.759.431,487 19,025 -2,00% 1,00 19,005
BORDO PISTAi
(%)
COORDENADASCOTA i
(%)
BORDO PISTA
Ramo 1100
CALÇADALADO ESQUERDO EIXO LADO DIREITO
CALÇADAESTACAS
59
6.1.2 Projeto de terraplenagem
A movimentação de terra apurada no projeto de terraplenagem destaca os seguintes
valores:
Volume de corte: 2.696,44m³;
Volume de aterro: 656,59m³;
Volume de Empréstimo: 0,00m³;
Volume Bota-fora: 1.810,05m³ (Material a ser aplicado no
escoramento de meios-fios e adequação de calçadas).
Em consonância com as especificações da Norma DNIT 108/2009-ES, para efeito de
execução do corpo do aterro, o material deverá apresentar capacidade de suporte adequada
(ISC>2%) e expansão menor ou igual a 4% e energia de compactação a 95% do Proctor
Normal, já para a execução da camada final dos aterros, o material deverá apresentar
capacidade de suporte ISC>6% e expansão menor ou igual a 2% e energia a 100% do
Proctor Intermediário.
O material que for classificado como não adequado para utilização deverá ser
destinado ao bota-fora.
60
Tabela 6.23 - Cubação Ramo 0
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
0 + 0,00 0,19 0,26 0 + 10,00 5,00 0,34 0,53 2,65 2,65 0,24 0,50 2,50 2,50 1 + 0,00 5,00 0,91 1,25 6,25 8,90 1,38 1,62 8,10 10,60 1 + 10,00 5,00 1,02 1,93 9,65 18,55 0,56 1,94 9,70 20,30 2 + 0,00 5,00 0,24 1,26 6,30 24,85 0,06 0,62 3,10 23,40 2 + 10,00 5,00 0,30 0,54 2,70 27,55 0,05 0,11 0,55 23,95 3 + 0,00 5,00 0,78 1,08 5,40 32,95 0,71 0,76 3,80 27,75 3 + 10,00 5,00 0,65 1,43 7,15 40,10 3,32 4,03 20,15 47,90 4 + 0,00 5,00 0,39 1,04 5,20 45,30 0,20 3,52 17,60 65,50 4 + 10,00 5,00 0,33 0,72 3,60 48,90 0,06 0,26 1,30 66,80 5 + 0,00 5,00 4,10 4,43 22,15 71,05 0,33 0,39 1,95 68,75 5 + 10,00 5,00 0,63 4,73 23,65 94,70 - 0,33 1,65 70,40 6 + 0,00 5,00 0,06 0,69 3,45 98,15 0,10 0,10 0,50 70,90 6 + 10,00 5,00 0,29 0,35 1,75 99,90 0,03 0,13 0,65 71,55 7 + 0,00 5,00 0,36 0,65 3,25 103,15 - 0,03 0,15 71,70 7 + 10,00 5,00 0,52 0,88 4,40 107,55 8 + 0,00 5,00 0,62 1,14 5,70 113,25 8 + 10,00 5,00 0,36 0,98 4,90 118,15 - 9 + 0,00 5,00 0,14 0,50 2,50 120,65 0,04 0,04 0,20 0,20 9 + 10,00 5,00 0,07 0,21 1,05 121,70 0,12 0,16 0,80 1,00
10 + 0,00 5,00 0,02 0,09 0,45 122,15 0,03 0,15 0,75 1,75 10 + 10,00 5,00 0,01 0,03 0,15 122,30 0,20 0,23 1,15 2,90 11 + 0,00 5,00 0,05 0,06 0,30 122,60 0,47 0,67 3,35 6,25 11 + 10,00 5,00 0,16 0,21 1,05 123,65 0,40 0,87 4,35 10,60 12 + 0,00 5,00 0,16 0,32 1,60 125,25 0,29 0,69 3,45 14,05 12 + 10,00 5,00 0,25 0,41 2,05 127,30 0,23 0,52 2,60 16,65 13 + 0,00 5,00 1,00 1,25 6,25 133,55 0,09 0,32 1,60 18,25 13 + 10,00 5,00 1,66 2,66 13,30 146,85 0,19 0,28 1,40 19,65 14 + 0,00 5,00 2,18 3,84 19,20 166,05 0,01 0,20 1,00 20,65 14 + 10,00 5,00 3,59 5,77 28,85 194,90 - 0,01 0,05 20,70
Ramo 0
Estaca Semi-distância
Corte Aterro
61
Tabela 6.24 - Cubação Ramo 0 (continuação)
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
15 + 0,00 5,00 4,28 7,87 39,35 234,25 15 + 10,00 5,00 3,55 7,83 39,15 273,40 16 + 0,00 5,00 2,56 6,11 30,55 303,95 - 16 + 10,00 5,00 0,73 3,29 16,45 320,40 3,09 3,09 15,45 15,45 17 + 0,00 5,00 1,01 1,74 8,70 329,10 0,85 3,94 19,70 35,15 17 + 10,00 5,00 0,89 1,90 9,50 338,60 0,22 1,07 5,35 40,50 18 + 0,00 5,00 1,15 2,04 10,20 348,80 0,40 0,62 3,10 43,60 18 + 10,00 5,00 2,00 3,15 15,75 364,55 0,10 0,50 2,50 46,10 19 + 0,00 5,00 1,27 3,27 16,35 380,90 0,45 0,55 2,75 48,85 19 + 10,00 5,00 1,57 2,84 14,20 395,10 1,93 2,38 11,90 60,75 20 + 0,00 5,00 1,48 3,05 15,25 410,35 1,29 3,22 16,10 76,85 20 + 10,00 5,00 3,52 5,00 25,00 435,35 0,47 1,76 8,80 85,65 21 + 0,00 5,00 1,64 5,16 25,80 461,15 0,20 0,67 3,35 89,00 21 + 10,00 5,00 1,53 3,17 15,85 477,00 0,66 0,86 4,30 93,30 22 + 0,00 5,00 1,30 2,83 14,15 491,15 0,85 1,51 7,55 100,85 22 + 10,00 5,00 1,89 3,19 15,95 507,10 0,66 1,51 7,55 108,40 23 + 0,00 5,00 2,29 4,18 20,90 528,00 0,66 1,32 6,60 115,00 23 + 10,00 5,00 2,37 4,66 23,30 551,30 0,85 1,51 7,55 122,55 24 + 0,00 5,00 3,17 5,54 27,70 579,00 0,27 1,12 5,60 128,15 24 + 10,00 5,00 2,61 5,78 28,90 607,90 0,07 0,34 1,70 129,85 25 + 0,00 5,00 3,90 6,51 32,55 640,45 0,02 0,09 0,45 130,30 25 + 10,00 5,00 1,63 5,53 27,65 668,10 - 0,02 0,10 130,40 26 + 0,00 5,00 1,07 2,70 13,50 681,60 26 + 10,00 5,00 0,94 2,01 10,05 691,65 - - 27 + 0,00 5,00 - 0,94 4,70 696,35 0,57 0,57 2,85 2,85 27 + 10,00 5,00 - - - 696,35 5,54 6,11 30,55 33,40 28 + 0,00 5,00 0,52 0,52 2,60 698,95 0,05 5,59 27,95 61,35 28 + 10,00 5,00 2,11 2,63 13,15 712,10 - 0,05 0,25 61,60 29 + 0,00 5,00 2,23 4,34 21,70 733,80
Ramo 0
Estaca Semi-distância
Corte Aterro
62
Tabela 6.25 - Cubação Ramo 100
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
100 + 0,00 0,60 0,10 100 + 10,00 5,00 3,93 4,53 22,65 22,65 0,44 0,54 2,70 2,70 101 + 0,00 5,00 2,02 5,95 29,75 52,40 1,76 2,20 11,00 13,70 101 + 10,00 5,00 2,84 4,86 24,30 76,70 0,02 1,78 8,90 22,60 102 + 0,00 5,00 1,71 4,55 22,75 99,45 0,17 0,19 0,95 23,55 102 + 10,00 5,00 3,54 5,25 26,25 125,70 0,14 0,31 1,55 25,10 103 + 0,00 5,00 6,12 9,66 48,30 174,00 0,53 0,67 3,35 28,45 103 + 10,00 5,00 10,24 16,36 81,80 255,80 - 0,53 2,65 31,10 104 + 0,00 5,00 8,71 18,95 94,75 350,55 0,10 0,10 0,50 31,60 104 + 10,00 5,00 7,89 16,60 83,00 433,55 - 0,10 0,50 32,10 105 + 0,00 5,00 3,12 11,01 55,05 488,60 0,09 0,09 0,45 32,55 105 + 10,00 5,00 2,73 5,85 29,25 517,85 - 0,09 0,45 33,00 106 + 0,00 5,00 2,68 5,41 27,05 544,90 0,32 0,32 1,60 34,60 106 + 10,00 5,00 2,47 5,15 25,75 570,65 1,04 1,36 6,80 41,40 107 + 0,00 5,00 1,95 4,42 22,10 592,75 0,06 1,10 5,50 46,90 107 + 10,00 5,00 0,35 2,30 11,50 604,25 1,19 1,25 6,25 53,15 108 + 0,00 5,00 0,41 0,76 3,80 608,05 2,41 3,60 18,00 71,15 108 + 10,00 5,00 0,63 1,04 5,20 613,25 0,43 2,84 14,20 85,35 109 + 0,00 5,00 0,32 0,95 4,75 618,00 0,12 0,55 2,75 88,10 109 + 10,00 5,00 3,91 4,23 21,15 639,15 - 0,12 0,60 88,70 110 + 0,00 5,00 2,74 6,65 33,25 672,40 0,04 0,04 0,20 88,90 110 + 10,00 5,00 0,41 3,15 15,75 688,15 2,20 2,24 11,20 100,10 110 + 13,00 1,50 - 0,41 0,62 688,77 2,02 4,22 6,33 106,43
Ramo 100
Estaca Semi-distância
Corte Aterro
63
Tabela 6.26 - Cubação Ramo 600
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
600 + 0,00 0,04 0,22 600 + 10,00 5,00 0,30 0,34 1,70 1,70 0,52 0,74 3,70 3,70 601 + 0,00 5,00 3,47 3,77 18,85 20,55 - 0,52 2,60 6,30 601 + 10,00 5,00 1,16 4,63 23,15 43,70 - - - 6,30 602 + 0,00 5,00 - 1,16 5,80 49,50 1,25 1,25 6,25 12,55 602 + 10,00 5,00 0,25 0,25 1,25 50,75 1,28 2,53 12,65 25,20 603 + 0,00 5,00 3,40 3,65 18,25 69,00 - 1,28 6,40 31,60 603 + 10,00 5,00 0,11 3,51 17,55 86,55 1,82 1,82 9,10 40,70 604 + 0,00 5,00 2,14 2,25 11,25 97,80 - 1,82 9,10 49,80 604 + 10,00 5,00 3,93 6,07 30,35 128,15 605 + 0,00 5,00 1,10 5,03 25,15 153,30 605 + 10,00 5,00 0,39 1,49 7,45 160,75 0,11 0,11 0,55 0,55 606 + 0,00 5,00 0,83 1,22 6,10 166,85 0,02 0,13 0,65 1,20 606 + 10,00 5,00 0,27 1,10 5,50 172,35 0,40 0,42 2,10 3,30 607 + 0,00 5,00 0,23 0,50 2,50 174,85 0,81 1,21 6,05 9,35 607 + 10,00 5,00 0,28 0,51 2,55 177,40 0,56 1,37 6,85 16,20 608 + 0,00 5,00 0,61 0,89 4,45 181,85 0,27 0,83 4,15 20,35 608 + 10,00 5,00 1,12 1,73 8,65 190,50 - 0,27 1,35 21,70 609 + 0,00 5,00 1,08 2,20 11,00 201,50 0,05 0,05 0,25 21,95 609 + 10,00 5,00 1,15 2,23 11,15 212,65 0,38 0,43 2,15 24,10 610 + 0,00 5,00 1,10 2,25 11,25 223,90 0,44 0,82 4,10 28,20 610 + 10,00 5,00 1,18 2,28 11,40 235,30 0,03 0,47 2,35 30,55 611 + 0,00 5,00 0,62 1,80 9,00 244,30 - 0,03 0,15 30,70 611 + 10,00 5,00 0,61 1,23 6,15 250,45 0,06 0,06 0,30 31,00 612 + 0,00 5,00 0,64 1,25 6,25 256,70 0,04 0,10 0,50 31,50 612 + 10,00 5,00 0,96 1,60 8,00 264,70 - 0,04 0,20 31,70 613 + 0,00 5,00 1,63 2,59 12,95 277,65 0,06 0,06 0,30 32,00 613 + 10,00 5,00 2,15 3,78 18,90 296,55 0,09 0,15 0,75 32,75 614 + 0,00 5,00 1,89 4,04 20,20 316,75 - 0,09 0,45 33,20 614 + 10,00 5,00 0,69 2,58 12,90 329,65 0,13 0,13 0,65 33,85 615 + 0,00 5,00 0,45 1,14 5,70 335,35 1,02 1,15 5,75 39,60 615 + 1,00 0,50 0,70 1,15 0,58 335,93 0,73 1,75 0,88 40,48
Estaca Semi-distância
Corte Aterro
Ramo 600
64
Tabela 6.27 - Cubação Ramo 700
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
700 + 0,00 0,59 0,32 700 + 10,00 5,00 0,90 1,49 7,45 7,45 0,86 1,18 5,90 5,90 701 + 0,00 5,00 0,76 1,66 8,30 15,75 0,10 0,96 4,80 10,70 701 + 10,00 5,00 3,55 4,31 21,55 37,30 0,58 0,68 3,40 14,10 702 + 0,00 5,00 0,67 4,22 21,10 58,40 1,50 2,08 10,40 24,50 702 + 10,00 5,00 0,53 1,20 6,00 64,40 - 1,50 7,50 32,00 703 + 0,00 5,00 0,34 0,87 4,35 68,75 0,22 0,22 1,10 33,10 703 + 10,00 5,00 1,55 1,89 9,45 78,20 0,02 0,24 1,20 34,30 704 + 0,00 5,00 1,72 3,27 16,35 94,55 0,01 0,03 0,15 34,45 704 + 10,00 5,00 0,98 2,70 13,50 108,05 0,01 0,02 0,10 34,55 705 + 0,00 5,00 1,09 2,07 10,35 118,40 0,05 0,06 0,30 34,85 705 + 10,00 5,00 0,77 1,86 9,30 127,70 0,12 0,17 0,85 35,70 706 + 0,00 5,00 0,97 1,74 8,70 136,40 0,24 0,36 1,80 37,50 706 + 10,00 5,00 1,32 2,29 11,45 147,85 0,22 0,46 2,30 39,80 707 + 0,00 5,00 1,80 3,12 15,60 163,45 0,02 0,24 1,20 41,00 707 + 10,00 5,00 1,62 3,42 17,10 180,55 0,01 0,03 0,15 41,15 708 + 0,00 5,00 1,17 2,79 13,95 194,50 0,02 0,03 0,15 41,30 708 + 10,00 5,00 0,36 1,53 7,65 202,15 0,29 0,31 1,55 42,85 709 + 0,00 5,00 0,31 0,67 3,35 205,50 0,46 0,75 3,75 46,60 709 + 10,00 5,00 0,05 0,36 1,80 207,30 0,47 0,93 4,65 51,25 710 + 0,00 5,00 0,38 0,43 2,15 209,45 0,08 0,55 2,75 54,00 710 + 10,00 5,00 0,36 0,74 3,70 213,15 0,32 0,40 2,00 56,00 711 + 0,00 5,00 0,93 1,29 6,45 219,60 0,11 0,43 2,15 58,15 711 + 10,00 5,00 5,40 6,33 31,65 251,25 0,01 0,12 0,60 58,75 712 + 0,00 5,00 1,99 7,39 36,95 288,20 - 0,01 0,05 58,80 712 + 10,00 5,00 1,21 3,20 16,00 304,20 - - - 58,80 713 + 0,00 5,00 0,89 2,10 10,50 314,70 - - - 58,80 713 + 10,00 5,00 0,76 1,65 8,25 322,95 0,03 0,03 0,15 58,95 714 + 0,00 5,00 0,82 1,58 7,90 330,85 0,02 0,05 0,25 59,20 714 + 10,00 5,00 0,46 1,28 6,40 337,25 0,10 0,12 0,60 59,80 715 + 0,00 5,00 0,04 0,50 2,50 339,75 0,08 0,18 0,90 60,70 715 + 1,00 0,50 0,07 0,11 0,06 339,81 0,08 0,16 0,08 60,78
Estaca Semi-distância
Corte Aterro
Ramo 700
65
Tabela 6.28 - Cubação Ramo 800
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
800 + 0,00 1,21 1,89 800 + 10,00 5,00 2,35 3,56 17,80 17,80 0,96 2,85 14,25 14,25 801 + 0,00 5,00 2,24 4,59 22,95 40,75 1,27 2,23 11,15 25,40 801 + 10,00 5,00 1,57 3,81 19,05 59,80 1,05 2,32 11,60 37,00 802 + 0,00 5,00 1,88 3,45 17,25 77,05 1,34 2,39 11,95 48,95 802 + 10,00 5,00 2,92 4,80 24,00 101,05 0,51 1,85 9,25 58,20 803 + 0,00 5,00 1,43 4,35 21,75 122,80 1,20 1,71 8,55 66,75 803 + 10,00 5,00 1,22 2,65 13,25 136,05 0,25 1,45 7,25 74,00 804 + 0,00 5,00 3,43 4,65 23,25 159,30 - 0,25 1,25 75,25 804 + 10,00 5,00 1,15 4,58 22,90 182,20 0,09 0,09 0,45 75,70 805 + 0,00 5,00 0,48 1,63 8,15 190,35 0,41 0,50 2,50 78,20 805 + 10,00 5,00 1,14 1,62 8,10 198,45 0,04 0,45 2,25 80,45 806 + 0,00 5,00 1,27 2,41 12,05 210,50 - 0,04 0,20 80,65 806 + 10,00 5,00 0,84 2,11 10,55 221,05 0,05 0,05 0,25 80,90 807 + 0,00 5,00 0,31 1,15 5,75 226,80 0,14 0,19 0,95 81,85 807 + 10,00 5,00 0,25 0,56 2,80 229,60 0,18 0,32 1,60 83,45 808 + 0,00 5,00 0,40 0,65 3,25 232,85 0,10 0,28 1,40 84,85 808 + 10,00 5,00 1,53 1,93 9,65 242,50 0,20 0,30 1,50 86,35 809 + 0,00 5,00 1,78 3,31 16,55 259,05 0,22 0,42 2,10 88,45 809 + 10,00 5,00 2,38 4,16 20,80 279,85 0,14 0,36 1,80 90,25 810 + 0,00 5,00 2,62 5,00 25,00 304,85 0,01 0,15 0,75 91,00 810 + 10,00 5,00 1,96 4,58 22,90 327,75 - 0,01 0,05 91,05 811 + 0,00 5,00 1,62 3,58 17,90 345,65 0,02 0,02 0,10 91,15 811 + 10,00 5,00 0,93 2,55 12,75 358,40 0,13 0,15 0,75 91,90 812 + 0,00 5,00 0,93 1,86 9,30 367,70 - 0,13 0,65 92,55 812 + 10,00 5,00 1,17 2,10 10,50 378,20 813 + 0,00 5,00 1,26 2,43 12,15 390,35 - 813 + 10,00 5,00 0,67 1,93 9,65 400,00 0,30 0,30 1,50 1,50 814 + 0,00 5,00 0,15 0,82 4,10 404,10 0,58 0,88 4,40 5,90 814 + 10,00 5,00 0,66 0,81 4,05 408,15 - 0,58 2,90 8,80 815 + 0,00 5,00 0,66 1,32 6,60 414,75 0,03 0,03 0,15 8,95 815 + 10,00 5,00 1,61 2,27 11,35 426,10 - 0,03 0,15 9,10 816 + 0,00 5,00 0,64 2,25 11,25 437,35 0,71 0,71 3,55 12,65 816 + 4,00 2,00 0,67 1,31 2,62 439,97 0,69 1,40 2,80 15,45
Estaca Semi-distância
Corte Aterro
Ramo 800
66
Tabela 6.29 - Cubação Ramo 1100
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
Área (m²)
Soma das áreas
Volume (m³)
Volume Acumulado
(m³)
1100 + 0,00 0,26 0,34
1100 + 10,00 5,00 1,68 1,94 9,70 9,70 - 0,34 1,70 1,70 1101 + 0,00 5,00 1,79 3,47 17,35 27,05 - - - 1,70 1101 + 10,00 5,00 0,94 2,73 13,65 40,70 - - - 1,70 1102 + 0,00 5,00 - 0,94 4,70 45,40 0,40 0,40 2,00 3,70 1102 + 10,00 5,00 0,90 0,90 4,50 49,90 - 0,40 2,00 5,70 1103 + 0,00 5,00 3,20 4,10 20,50 70,40 - - - 5,70 1103 + 10,00 5,00 4,74 7,94 39,70 110,10 - - - 5,70 1104 + 0,00 5,00 0,29 5,03 25,15 135,25 0,10 0,10 0,50 6,20 1104 + 10,00 5,00 0,23 0,52 2,60 137,85 - 0,10 0,50 6,70 1105 + 0,00 5,00 1,91 2,14 10,70 148,55 1105 + 10,00 5,00 0,01 1,92 9,60 158,15 1105 + 14,00 2,00 - 0,01 0,02 158,17
Ramo 1100
Estaca Semi-distância
Corte Aterro
67
Figura 6.20: Orientação de Terraplenagem
VOLUME VOLUMEm³ 1ª 2ª 3ª m³ VOLUME DMT VOLUME DMT VOLUME DMT
1 0 + 0,00 29 + 0,00 733,800 100% 0% 0% 0 + 0,00 7 + 0,00 71,70 96,80 220 A-018 + 10,00 14 + 10,00 20,70 27,95 60 A-02
16 + 0,00 25 + 10,00 130,40 176,04 125 A-0326 + 10,00 28 + 10,00 61,60 83,16 260 A-04
349,86 4.500 BF2 100 + 0,00 110 + 13,00 688,765 100% 0% 0% 100 + 0,00 110 + 13,00 106,43 143,68 100 A-05
545,08 4.500 BF3 600 + 0,00 615 + 1,00 335,925 100% 0% 0% 600 + 0,00 604 + 0,00 49,80 67,23 120 A-06
605 + 10,00 615 + 1,00 40,48 54,64 100 A-07214,05 4.500 BF
4 700 + 0,00 715 + 1,00 339,805 100% 0% 0% 700 + 0,00 715 + 1,00 60,78 82,05 100 A-08257,75 4.500 BF
5 800 + 0,00 816 + 4,00 439,970 100% 0% 0% 800 + 10,00 812 + 0,00 92,55 124,94 100 A-09811 + 10,00 816 + 4,00 15,45 20,86 120 A-10
294,17 4.500 BF7 1100 + 0,00 1105 + 14,00 158,170 100% 0% 0% 1100 + 0,00 1104 + 10,00 6,70 9,05 12 A-14
149,13 4.500 BF
ORIGEM DESTINOOBS
nºCLASSIFICAÇÃO 3ª CAT.1ª CAT. 2ª CAT.
ESTACA ESTACAESTACAESTACA
68
6.2 PROJETO DE DRENAGEM
O sistema de drenagem está estruturado com elementos de canalização superficial
(meio-fio), bueiros e caixas para coleta de água pluvial até o devido lançamento.
As planilhas apresentadas a seguir consolidam os pressupostos inerentes ao estudo
hidrológico e projeto de drenagem, bem como estabelece os parâmetros para implantação
das redes projetadas.
69
Tabela 6.30 - Dimensionamento Hidráulico dos Bueiros Tubulares - Ramo 0
i Comp. Área tp(ant.) tp(gal.) I Vel. Vazão bacia Dimensões VazãoMontante Jusante (%) (m) (km²) (min) (min) (mm/h) (m/s) (m³/s) Comerciais (m) (m³/s)
0.1 50,480 49,980 2,50 20,00 0,001 0,50 - 0,15 10,00 118,69 2,27 0,019 0,40 0,285 0.2 49,980 49,490 1,49 33,00 0,000 0,50 - 0,31 10,26 117,90 1,75 0,007 0,40 0,220 0.3 49,490 48,050 6,50 22,00 0,001 0,50 - 0,10 10,73 116,52 3,66 0,012 0,40 0,460 0.4 48,050 47,360 3,50 20,00 0,001 0,50 - 0,12 10,89 116,04 2,69 0,015 0,40 0,338 0.5 47,360 46,230 4,52 25,00 0,001 0,50 - 0,14 11,06 115,55 3,05 0,009 0,40 0,384 0.6 46,230 43,920 10,50 22,00 0,001 0,50 - 0,08 11,25 115,03 4,66 0,014 0,40 0,585 0.7 43,920 43,669 3,81 7,00 0,001 0,50 - 0,04 11,36 114,70 2,80 0,013 0,40 0,352 0.8 42,490 40,996 12,50 12,00 0,003 0,50 - 0,04 11,41 114,57 5,08 0,050 0,40 0,638 0.9 50,128 49,086 3,50 30,00 0,001 0,50 - 0,19 10,00 118,69 2,69 0,009 0,40 0,337 0.10 49,086 47,998 5,49 20,00 0,001 0,50 - 0,10 10,42 117,41 3,37 0,010 0,40 0,423 0.11 47,998 46,188 6,50 28,00 0,000 0,50 - 0,13 10,62 116,84 3,66 0,006 0,40 0,460 0.12 46,188 45,829 3,54 10,00 0,000 0,50 - 0,06 10,85 116,15 2,70 0,007 0,40 0,340 0.13 42,672 39,459 9,50 34,00 0,001 0,50 - 0,13 10,00 118,69 4,43 0,019 0,40 0,556 0.14 39,459 39,437 0,53 4,00 0,003 0,50 - 0,06 10,00 118,69 1,05 0,043 0,40 0,132 0.15 46,742 45,498 6,46 19,00 0,001 0,50 - 0,09 10,00 118,69 3,65 0,013 0,40 0,459 0.16 45,498 45,096 4,43 9,00 0,000 0,50 - 0,05 10,20 118,08 3,02 0,007 0,40 0,380 0.17 45,096 44,225 4,48 19,00 0,001 0,50 - 0,10 10,29 117,80 3,04 0,016 0,40 0,382 0.18 44,225 42,875 4,50 30,00 0,002 0,50 - 0,16 10,46 117,29 3,05 0,027 0,40 0,383 0.19 42,875 42,125 2,50 30,00 0,002 0,50 - 0,22 10,69 116,64 2,27 0,028 0,40 0,285 0.20 42,125 39,873 7,50 30,00 0,002 0,50 - 0,13 10,93 115,92 3,94 0,031 0,40 0,494 0.21 40,204 39,747 3,50 13,00 0,000 0,50 - 0,08 11,09 115,47 2,69 - 0,40 0,338 0.22 38,891 39,000 19,50 44,00 0,000 0,50 - 0,12 11,18 115,22 6,34 - 0,40 0,797 0.23 28,778 28,649 2,00 6,00 0,000 0,50 - 0,05 11,27 114,95 2,03 - 0,40 0,255
Rua Padre Gabriel
CARACTERÍSTICAS DA REDE CARACTERÍSTICAS DA CONTRIBUÍÇÃO DIMENSIONAMENTO HIDRÁULICO
Rede Cotas C TC (min)
70
Tabela 6.31 - Dimensionamento Hidráulico dos Bueiros Tubulares - Ramo 100
i Comp. Área tp(ant.) tp(gal.) I Vel. Vazão bacia Dimensões VazãoMontante Jusante (%) (m) (km²) (min) (min) (mm/h) (m/s) (m³/s) Comerciais (m) (m³/s)
1.0 45,755 45,180 10,83 5,00 0,000 0,50 - 0,02 10,00 118,69 4,73 0,008 0,40 0,594 1.1 45,180 44,492 9,79 7,00 0,000 0,50 - 0,03 10,05 118,52 4,50 - 0,40 0,565 1.2 44,492 39,860 19,47 24,00 0,000 0,50 - 0,06 10,13 118,30 6,34 0,004 0,40 0,796 1.3 39,860 36,955 19,68 15,00 0,000 0,50 - 0,04 10,30 117,78 6,37 - 0,40 0,801 1.4 36,931 35,590 14,05 10,00 0,000 0,50 - 0,03 10,41 117,46 5,39 0,002 0,40 0,676 1.5 35,590 35,535 0,50 11,00 0,001 0,50 - 0,18 10,48 117,24 1,02 0,014 0,40 0,128 1.6 46,815 45,271 19,77 8,00 0,001 0,50 - 0,02 10,00 118,69 6,39 0,012 0,40 0,802 1.7 41,741 35,890 19,50 30,00 0,000 0,50 - 0,08 10,00 118,69 6,34 0,006 0,40 0,797 1.8 35,890 34,329 19,50 8,00 0,001 0,50 - 0,02 10,27 117,87 6,35 0,017 0,40 0,797 1.9 31,329 26,064 19,50 27,00 0,000 0,50 - 0,07 10,32 117,73 6,34 0,003 0,40 0,797 1.10 25,044 21,924 19,50 16,00 0,001 0,50 - 0,04 10,47 117,27 6,34 0,010 0,40 0,797 1.11 21,924 21,884 0,51 8,00 0,000 0,50 - 0,13 10,55 117,02 1,03 0,008 0,40 0,129
DIMENSIONAMENTO HIDRÁULICO DOS BUEIROS TUBULARESCARACTERÍSTICAS DA REDE CARACTERÍSTICAS DA CONTRIBUÍÇÃO DIMENSIONAMENTO HIDRÁULICO
Rede Cotas C TC (min)
Rua São Jorge
71
Tabela 6.32 - Dimensionamento Hidráulico dos Bueiros Tubulares - Ramo 600
i Comp. Área tp(ant.) tp(gal.) I Vel. Vazão bacia Dimensões VazãoMontante Jusante (%) (m) (km²) (min) (min) (mm/h) (m/s) (m³/s) Comerciais (m) (m³/s)
6.1 48,000 44,160 12,00 32,00 0,002 0,50 - 0,11 10,00 118,69 4,98 0,032 0,40 0,625 6.2 44,160 42,709 12,00 12,00 0,002 0,50 - 0,04 10,20 118,07 4,98 0,025 0,40 0,625 6.3 42,709 35,641 25,00 28,00 0,001 0,50 - 0,06 10,27 117,87 7,18 0,010 0,40 0,902 6.4 35,641 26,486 30,00 31,00 0,001 0,50 - 0,07 10,38 117,53 7,87 0,016 0,40 0,989 6.5 26,400 22,387 10,00 40,00 0,000 0,50 - 0,15 10,00 118,69 4,54 - 0,40 0,571 6.6 20,887 19,455 5,00 29,00 0,001 0,50 - 0,11 10,00 118,69 4,21 0,023 0,60 1,190 6.7 48,000 47,600 1,00 40,00 0,002 0,50 - 0,46 10,00 118,69 1,44 0,031 0,40 0,181 6.8 47,600 46,297 3,29 40,00 0,002 0,50 - 0,26 10,62 116,83 2,61 0,030 0,40 0,327 6.9 46,247 45,609 2,09 31,00 0,002 0,50 - 0,25 10,95 115,87 2,08 0,031 0,40 0,261 6.10 45,559 45,293 3,37 8,00 0,002 0,50 - 0,05 11,22 115,10 2,64 0,027 0,40 0,331
DIMENSIONAMENTO HIDRÁULICO DOS BUEIROS TUBULARESCARACTERÍSTICAS DA REDE CARACTERÍSTICAS DA CONTRIBUÍÇÃO DIMENSIONAMENTO HIDRÁULICO
Rede Cotas C TC (min)
Rua 107
72
Tabela 6.33 - Dimensionamento Hidráulico dos Bueiros Tubulares - Ramo 700
i Comp. Área tp(ant.) tp(gal.) I Vel. Vazão bacia Dimensões VazãoMontante Jusante (%) (m) (km²) (min) (min) (mm/h) (m/s) (m³/s) Comerciais (m) (m³/s)
7.1 48,715 48,513 0,50 40,00 0,000 0,50 - 0,66 11,28 114,94 1,02 - 0,40 0,128 7.2 48,521 48,362 0,50 32,00 0,002 0,50 - 0,52 10,00 118,69 1,02 0,031 0,40 0,128 7.3 48,356 48,243 0,50 23,00 0,002 0,50 - 0,38 10,80 116,29 1,02 0,032 0,40 0,128 7.4 48,253 48,028 0,50 45,00 0,002 0,50 - 0,74 11,33 114,79 1,02 0,025 0,40 0,128 7.5 48,028 46,249 5,86 30,00 0,001 0,50 - 0,14 11,68 113,82 3,48 0,018 0,40 0,437 7.6 46,249 44,857 14,99 9,00 0,001 0,50 - 0,03 12,34 112,02 5,56 0,014 0,40 0,699 7.7 44,857 36,363 21,18 40,00 0,002 0,50 - 0,10 12,51 111,56 6,61 0,025 0,40 0,831 7.8 35,190 31,199 19,31 21,00 0,000 0,50 - 0,06 12,55 111,47 6,31 0,008 0,40 0,793 7.9 27,000 23,191 20,00 19,00 0,001 0,50 - 0,05 12,68 111,12 6,43 0,021 0,40 0,807 7.10 21,691 14,696 25,00 28,00 0,000 0,50 - 0,06 10,00 118,69 7,18 - 0,40 0,902 7.11 14,696 9,910 20,00 24,00 0,000 0,50 - 0,06 10,00 118,69 6,43 0,007 0,40 0,807 7.12 9,910 9,065 3,32 25,00 0,001 0,50 - 0,12 10,00 118,69 3,43 0,018 0,60 0,970 7.13 45,000 44,876 2,00 6,00 0,000 0,50 - 0,05 10,00 118,69 2,03 - 0,40 0,255
DIMENSIONAMENTO HIDRÁULICO DOS BUEIROS TUBULARESCARACTERÍSTICAS DA REDE CARACTERÍSTICAS DA CONTRIBUÍÇÃO DIMENSIONAMENTO HIDRÁULICO
Rede Cotas C TC (min)
Rua 108
73
Tabela 6.34 - Dimensionamento Hidráulico dos Bueiros Tubulares - Ramo 800
i Comp. Área tp(ant.) tp(gal.) I Vel. Vazão bacia Dimensões VazãoMontante Jusante (%) (m) (km²) (min) (min) (mm/h) (m/s) (m³/s) Comerciais (m) (m³/s)
8.1 48,619 47,382 4,14 30,00 0,000 0,50 - 0,17 10,00 118,69 2,92 0,003 0,40 0,367 8.2 47,382 46,846 5,56 10,00 0,001 0,50 - 0,05 10,00 118,69 3,39 0,017 0,40 0,426 8.3 46,846 42,049 11,93 40,00 0,001 0,50 - 0,13 10,33 117,68 4,96 0,024 0,40 0,623 8.4 41,845 37,588 10,59 40,00 0,000 0,50 - 0,14 10,41 117,45 4,68 0,005 0,40 0,587 8.5 39,748 37,194 9,45 27,00 0,002 0,50 - 0,10 10,64 116,77 4,42 0,036 0,40 0,555 8.6 35,694 31,928 10,00 38,00 0,000 0,50 - 0,14 10,00 118,69 4,54 - 0,40 0,571 8.7 30,428 26,662 10,00 38,00 0,000 0,50 - 0,14 10,00 118,69 4,54 - 0,40 0,571 8.8 25,162 24,060 10,00 11,00 0,000 0,50 - 0,04 10,00 118,69 4,54 - 0,40 0,571 8.9 46,000 45,877 2,00 9,00 0,000 0,50 - 0,07 10,00 118,69 2,03 - 0,40 0,255 8.10 48,051 45,927 5,28 40,00 0,000 0,50 - 0,20 10,00 118,69 3,30 - 0,40 0,415 8.11 46,417 46,119 0,86 35,00 0,002 0,50 - 0,44 10,00 118,69 1,33 0,033 0,40 0,167 8.12 46,119 45,927 0,93 21,00 0,002 0,50 - 0,25 10,00 118,69 1,38 0,034 0,40 0,174 8.13 48,103 45,449 10,00 27,00 0,003 0,50 - 0,10 10,55 117,02 4,54 0,044 0,40 0,571 8.14 43,949 41,917 10,00 20,00 0,000 0,50 - 0,07 10,00 118,69 4,54 - 0,40 0,571 8.15 40,417 37,876 10,00 25,00 0,000 0,50 - 0,09 10,00 118,69 4,54 - 0,40 0,571 8.16 36,376 33,948 10,00 24,00 0,000 0,50 - 0,09 10,00 118,69 4,54 - 0,40 0,571 8.17 32,448 28,015 16,92 26,00 0,000 0,50 - 0,07 10,00 118,69 5,91 - 0,40 0,742 8.18 25,162 23,312 5,00 37,00 0,000 0,50 - 0,15 10,00 118,69 4,21 - 0,60 1,190
DIMENSIONAMENTO HIDRÁULICO DOS BUEIROS TUBULARESCARACTERÍSTICAS DA REDE CARACTERÍSTICAS DA CONTRIBUÍÇÃO DIMENSIONAMENTO HIDRÁULICO
Rede Cotas C TC (min)
Rua 109
74
Tabela 6.35 - Dimensionamento Hidráulico dos Bueiros Tubulares - Ramos 1100
i Comp. Área tp(ant.) tp(gal.) I Vel. Vazão bacia Dimensões VazãoMontante Jusante (%) (m) (km²) (min) (min) (mm/h) (m/s) (m³/s) Comerciais (m) (m³/s)
11.1 45,16 37,54 22,07 30,00 0,11 0,60 10,00 0,09 10,00 118,69 5,71 0,23 0,40 0,2311.2 37,54 27,36 30,60 30,01 0,15 0,60 10,00 0,07 10,09 118,42 6,87 0,06 0,40 0,2911.3 27,36 20,84 27,77 19,88 0,18 0,60 10,00 0,05 10,16 118,20 6,98 0,06 0,40 0,3511.4 20,84 20,01 8,31 9,93 0,20 0,60 10,00 0,04 10,21 118,06 4,53 0,04 0,40 0,3811.5 20,01 19,13 8,82 9,98 0,20 0,60 10,00 0,04 10,24 117,95 4,64 0,00 0,40 0,3811.6 19,13 17,54 7,14 14,00 0,22 0,60 10,00 0,05 10,28 117,84 4,33 0,04 0,40 0,4311.7 17,54 17,24 1,50 20,04 0,23 0,60 10,00 0,13 10,33 117,68 2,49 0,03 0,60 0,4511.8 17,24 16,94 1,50 20,05 0,23 0,60 10,00 0,13 10,47 117,28 2,49 0,00 0,60 0,45
12.1 55,44 52,27 10,50 30,19 0,01 0,60 10,00 0,22 10,00 118,69 2,24 0,02 0,40 0,0212.2 52,27 46,16 20,74 29,49 0,02 0,60 10,00 0,14 10,22 118,01 3,46 0,02 0,40 0,0412.3 46,16 42,34 24,00 15,89 0,03 0,60 10,00 0,06 10,37 117,58 4,08 0,02 0,40 0,0612.4 42,34 41,92 7,17 5,91 0,04 0,60 10,00 0,04 10,43 117,39 2,81 0,01 0,40 0,08
13.1 55,97 54,72 4,17 30,01 0,01 0,60 10,00 0,31 10,00 118,69 1,60 0,02 0,40 0,0213.2 54,72 52,01 9,02 30,01 0,02 0,60 10,00 0,19 10,31 117,74 2,58 0,02 0,40 0,0413.3 52,01 47,37 15,47 30,01 0,03 0,60 10,00 0,14 10,51 117,17 3,51 0,02 0,40 0,0613.4 47,37 41,22 20,51 30,01 0,04 0,60 10,00 0,12 10,65 116,75 4,21 0,02 0,40 0,0913.5 41,22 36,26 20,68 23,98 0,05 0,60 10,00 0,09 10,77 116,40 4,50 0,02 0,40 0,1113.6 36,26 35,42 12,29 6,79 0,07 0,60 10,00 0,03 10,86 116,14 3,94 0,02 0,40 0,13
DIMENSIONAMENTO HIDRÁULICO DOS BUEIROS TUBULARES
RUA 62
Rede Cotas C TC (min)
CARACTERÍSTICAS DA REDE CARACTERÍSTICAS DA CONTRIBUIÇÃO DIMENSIONAMENTO HIDRÁULICO
RUA 51
75
As soluções adotadas no projeto de drenagem estão apresentadas no projeto
geométrico no capitulo de Elementos gráficos deste relatório.
Ramais deverão ser implantados com tubos diâmetro de 0,40m e inclinação mínima
de 1%.
Os projetos tipos dos dispositivos adotados estão apresentados a seguir.
76
PROJETO TIPO DE DRENAGEM
77
6.3 PROJETO DE PAVIMENTAÇÃO
6.3.1 Aspectos metodológicos
No dimensionamento dos pavimentos aplicou-se simultaneamente o Método do
DNER/DNIT e o Método da Resiliência para pavimentos asfálticos e o Método PCA/1984
(Portland Cement Association) para dimensionamento de pavimentos em blocos
Intertravados.
A solução adotada ponderou os valores obtidos com os diferentes métodos e as
características de implantação da via em estudo. Como diretriz de referencia, optou-se pela
implantação em blocos Intertravados para vias com inclinação longitudinal superior a 20%
O Método do DNIT trata da adaptação às condições brasileiras do Método do Corpo
de Engenheiros do Exército Americano, baseado no trabalho "Design of Flexible Paviments
Considering Mixed Loads and Traffic Volume", de autoria de W.J. Turnbull, C.R. Foster e
R.G. Allung.
Neste método, o dimensionamento do pavimento é efetuado utilizando-se a seguinte
expressão:
H t=9,02+(0,231 log10N p+0,05 )×( 7011ISCSLEITO
−234,33)12
Na aplicação deste método pressupõe-se que haverá sempre uma drenagem
superficial adequada e que sejam satisfeitos os seguintes requisitos:
O lençol d'água subterrâneo esteja rebaixado a no mínimo 1,50m em relação à cota do
solo em função do pavimento;
O grau de compactação do material do subleito seja de, no mínimo, 100 % do Proctor
Intermediário;
Os coeficientes de equivalência estrutural para os diferentes materiais constituintes do
pavimento considerados no dimensionamento do pavimento são os seguintes:
Revestimento (KR) = 2,00
Base (KB) = 1,00
Sub-base (KS) = 1,00
78
A espessura mínima a adotar para compactação de camadas granulares é de 10 cm. A
espessura máxima para compactação é de 20 cm.
Uma vez determinadas as espessuras Hm, Hn, as espessuras da base (B), sub-base (h20)
e reforço do subleito (hn) são obtidas pela resolução das seguintes equações:
RKR + BKB> h20
RKR + BKB +h20KS>hn
RKR + BKB +h20KS + hnKRef> hm
O Método da Resiliência permite considerar explicitamente as características
resilientes dos materiais na análise da estrutura do pavimento, mantendo as premissas e os
critérios baseados no valor do CBR das camadas constituintes.
A classificação do subleito quanto à resiliência é função do ISC e da porcentagem de
silte na fração fina (que passa na peneira # 200). Esta classificação agrupa os solos em três
tipos de acordo com o seguinte critério:
<35% 35 a 65% >65%>10 I II III6 a 9 II II III2 a 5 III III III
% de solo na # 200ISC
Solos Tipo I: Solos com baixo grau de resiliência: apresentam bom comportamento como subleito
e reforço de subleito, com possibilidade de utilização em camada de sub-base.
Solos Tipo II: Solos com grau de resiliência intermediário: apresenta comportamento regular
como subleito.
Solos Tipo III: Solos com grau de resiliência elevado: não é aconselhável seu emprego em
camadas de pavimentos, sua aplicação como subleito requer cuidados e estudos especiais.
Conforme a classificação do subleito, as seguintes constantes são definidas:
Tipo I: I1 = 0 I2 = 0
Tipo II: I1 = 1 I2 = 0
Tipo III: I1 = 0 I2 = 1
A deflexão admissível de projeto é definida em função do tráfego, em conformidade
com a especificação a seguir:
log Dadm=3,148−0,188 LogN
79
A espessura mínima do revestimento betuminoso (HCB) está associada às
propriedades resilientes do subleito e à fadiga do revestimento, sendo calculada pela
expressão a seguir:
HCB=−5,737+ 807,961Dadm
+0,972 I 1+4,101 I 2
Onde:
Dadm deflexão admissível de projeto: 0,01 mm
HCB Espessura mínima da camada betuminosa [cm]
A espessura total do pavimento deverá atender os limites estabelecidos pela
equação:
HT=77,67×N0,0482×CBR−0,598
Definida a espessura do revestimento betuminoso e a espessura total equivalente do
pavimento (HT) em função do CBR do subleito, a espessura da camada granular, HCG, é
determinada a partir da equação:
HCB×V E+HCG=HT
O coeficiente estrutural da camada betuminosa, VE, é estabelecido conforme o
quadro abaixo, em função do número N e do tipo de subleito.
1,00E+04 1,00E+05 1,00E+06 1,00E+07 1,00E+08I 4,00 4,00 3,40 2,80 2,80II 3,00 3,00 3,00 2,80 2,80III 2,00 2,00 2,00 2,00 2,00
Tipo de subleito
Número "N"
Recomenda-se a adoção da espessura mínima calculada para o revestimento
betuminoso como referência inicial, podendo ser modificada em função das características
particulares do projeto.
O dimensionamento do pavimento em blocos intertravados foi efetuado utilizando-se
o Método PCA/1984 (Portland Cement Association).
O método baseia-se em pesquisas desenvolvidas na Austrália, África do Sul, Grã-
Bretanha e Estados Unidos, bem como em observações laboratoriais e de pistas
80
experimentais, nas quais o desempenho do pavimento em serviço foi acompanhado. A
proposição final efetuada pelo Corpo de Engenheiros do Exército Americano (USACE).
A adoção deste método é recomendável para segmentos com tráfego médio a
pesado (105< N < 1,5x106), pois fundamenta a estrutura do pavimento em camadas
granulares que proporciona soluções mais seguras. Adotando o princípio de que as
camadas de pavimento, a partir do subleito, sejam dispostas em ordem crescente de
resistência de modo que as deformações por cisalhamento e consolidação dos materiais
reduzam a um mínimo as deformações verticais permanentes (trilhas de roda).
O método é bastante prático no conceito de sua aplicação, em função do número de
solicitações do eixo simples padrão de 8,2t “N”, bem como do valor do Índice Suporte
Califórnia (CBR) do subleito, é determinada através da figura abaixo, a espessura de
material puramente granular (HBG) correspondente à camada de base assentada sobre o
subleito.
Tabela 6.36 – Método PCA
2,0 2,5 3,0 3,5 4,0 5,0 6,0 8,0 10,0 15,0 25,01,00E+03 27 21 17 15 15 15 15 15 15 15 152,00E+03 29 24 20 17 15 15 15 15 15 15 154,00E+03 33 27 23 19 27 15 15 15 15 15 158,00E+03 36 30 25 22 19 15 15 15 15 15 151,00E+04 37 31 26 23 20 15 15 15 15 15 152,00E+04 41 34 29 25 22 17 15 15 15 15 154,00E+04 44 37 32 28 24 19 15 15 15 15 158,00E+04 48 40 35 30 27 21 17 15 15 15 151,00E+05 49 41 36 31 28 22 18 15 15 15 152,00E+05 52 44 36 34 30 24 19 15 15 15 154,00E+05 56 47 41 36 32 26 21 15 15 15 158,00E+05 59 51 44 39 34 28 23 15 15 15 151,00E+06 60 52 45 40 35 29 23 16 15 15 152,00E+06 64 55 47 42 38 30 25 17 15 15 154,00E+06 68 58 50 45 40 33 27 19 15 15 158,00E+06 71 61 53 47 42 34 29 20 15 15 151,00E+07 72 62 54 48 43 35 30 21 15 15 15
Número"N"
ESPESSURA DA BASE (cm)
ISC subleito
Nos segmentos já pavimentados em bloco intertravado e/ou paralelepípedo, foi
avaliado o estado de conservação atual. Em geral as vias estão em boas condições,
contudo serão necessárias intervenções para execução da drenagem, tal fato acarretará na
remoção e reassentamento do pavimento existente.
81
6.3.1 Resultados obtidos
Abaixo estão apresentados os resultados obtidos a partir da aplicação dos métodos de verificação tanto para os trechos com
pavimento em bloco intertravado, como para os trechos com pavimento em CBUQ.
Tabela 6.37 - Dimensionamento para pavimentação tipo bloco intertravado
EXT. (m)Rua São Jorge (Nova Rosa da Penha) 100 + 0,00 110 + 13,00 213,00 2,06E+04 6,5 8 5 15Rua 107 (Nova Rosa da Penha) - Trecho 1 600 + 0,00 603 + 0,00 60,00 7,71E+04 6,2 8 5 17Rua 108 (Nova Rosa da Penha) - Trecho 1 700 + 0,00 703 + 0,00 60,00 4,96E+04 8,4 8 5 15Rua 109 (Nova Rosa da Penha) - Trecho 1 800 + 0,00 804 + 0,00 80,00 7,93E+04 8,2 8 5 15Rua 51 (Nova Rosa da Penha) 1.100 + 0,00 1.105 + 14,00 114,00 2,53E+04 10,4 8 5 15
CBR REVESTIMENTO CAMADA DEASSENTAMENTO
BASETRECHO SEGMENTO NpLIMITES
Tabela 6.38 - Dimensionamento para pavimentação tipo CBUQ
EXT. (m) CBR S% grupo I1 I2 R H20 Hn B h20 R B h20 Ht Dadm HCB VE HCGHC
GR Base Sub-
baseRua Padre Gabriel (Nova Rosa da Penha) 0 + 0,00 29 + 0,00 580,00 4,08E+04 7,4 28,6 II 1 0 5 21 39 11 18 5 20 9 39 191 -0,5 3,0 40,8 35 5 20 7Rua 107 (Nova Rosa da Penha) - Trecho 2 603 + 0,00 615 + 1,00 241,00 7,71E+04 6,2 22,1 II 1 0 5 22 44 12 22 5 20 14 45 170 0,0 3,0 44,9 35 5 20 13Rua 108 (Nova Rosa da Penha) - Trecho 2 703 + 0,00 715 + 1,00 241,00 4,96E+04 8,4 34,9 II 1 0 5 21 37 11 16 5 20 7 37 184 -0,4 3,0 37,8 35 5 20 5Rua 109 (Nova Rosa da Penha) - Trecho 2 804 + 0,00 816 + 4,00 244,00 7,93E+04 8,2 41,6 II 1 0 5 22 38 12 16 5 20 8 38 169 0,0 3,0 37,9 35 5 20 6
SOLUÇÃOSUBLEITOMétodo da ResiliênciaMétodo DNIT
DIMENSIONAMENTO SOLUÇÃOTRECHO
SEGMENTONp
DIMENSION.
LIMITES
82
6.3.1 Soluções adotadas
Segue a solução adotada para cada trecho. Para os ramos 0, 600, 700 e 800, considerando que o tráfego atual é baixo e que as
camadas de terraplenagem serão executadas com energia de compactação do Proctor Intermediário, o que resulta em um CBR maior
para o subleito (nos ensaios foi utilizado o Proctor Normal), foi suprimida a camada de sub-base na pavimentação em CBUQ.
Tabela 6.39 - Solução adotada
EXT. (m) Bloco Camada deAssentamento
Base CBUQ Base Sub-base
Rua Padre Gabriel (Nova Rosa da Penha) CBUQ 0 + 0,00 29 + 0,00 580,00 4,08E+04 7,4 - - - 5 20 - 25Rua São Jorge (Nova Rosa da Penha) Bloco 100 + 0,00 110 + 13,00 213,00 2,06E+04 6,5 8 5 15 - - - 28Rua 107 (Nova Rosa da Penha) - Trecho 1 Bloco 600 + 0,00 603 + 0,00 60,00 7,71E+04 6,2 8 5 15 - - - 28Rua 107 (Nova Rosa da Penha) - Trecho 2 CBUQ 603 + 0,00 615 + 1,00 241,00 7,71E+04 6,2 - - - 5 20 - 25Rua 108 (Nova Rosa da Penha) - Trecho 1 Bloco 700 + 0,00 703 + 0,00 60,00 4,96E+04 8,4 8 5 15 - - - 28Rua 108 (Nova Rosa da Penha) - Trecho 2 CBUQ 703 + 0,00 715 + 1,00 241,00 4,96E+04 8,4 - - - 5 20 - 25Rua 109 (Nova Rosa da Penha) - Trecho 1 Bloco 800 + 0,00 804 + 0,00 80,00 7,93E+04 8,2 8 5 15 - - - 28Rua 109 (Nova Rosa da Penha) - Trecho 2 CBUQ 804 + 0,00 816 + 4,00 244,00 7,93E+04 8,2 - - - 5 20 - 25Rua 51 (Nova Rosa da Penha) Bloco 1.100 + 0,00 1.105 + 14,00 114,00 2,53E+04 10,4 8 5 15 - - - 28
SOLUÇÃO DE PAVIMENTAÇÃO ADOTADABloco intertravadoTipo de
PavimentaçãoTRECHO
SEGMENTONp CBRLIMITES
CBUQ EspessuraTotal
83
Seguem as especificações:
PAVIMENTAÇÃO EM BLOCO INTERTRAVADOREVESTIMENTO = Bloco inter travado Fck> 35Mpa DNER-ES 327/97
CAMADA ASSENTAMENTO = Colchão de areiaBASE = Brita graduada faixa "C"- DNIT 141/2010 - ES
REGULARIZAÇÃO = ISC>CBR Energia 100% P.I., 20cm DNIT 137/2010 - ES
PAVIMENTAÇÃO EM CBUQREVESTIMENTO = CBUQ faixa "C" DNIT 031'/2006 - ES
BASE = Brita graduada faixa "C"- DNIT 141/2010 - ESSUB-BASE = Brita graduada DNIT 139/2010 - ES
REGULARIZAÇÃO = ISC>CBR Energia 100% P.I., 20cm DNIT 137/2010 - ES
Nas vias com pavimentação em bloco intertravado, deverão ser executados
travessões feitos com meio-fio de concreto perpendiculares ao eixo com espaçamento
médio de 5,00 ou 10,00m com o objetivo de manter a integridade do pavimento. Estes
travessões também deverão ser implantados nos encontros do pavimento intertravado com
outro tipo de pavimentação ou com a via sem pavimentação. Para visualização do detalhe e
locação dos travessões, ver desenho de pavimentação.
6.3.1 Seções típicas de pavimentação
As seções típicas de pavimentação estão apresentadas a seguir.
84
SEÇÃO TIPO DE PAVIMENTAÇÃO
85
6.4 PROJETO DE SINALIZAÇÃO
A implantação da via contará com elementos de sinalização para orientação e
regulamentação do tráfego.
6.4.1 Aspectos gerais
O projeto de sinalização abrangeu:
Sinalização vertical;
Sinalização horizontal.
6.4.2 Sinalização Vertical
A sinalização vertical constitui-se de meio de comunicação cujo sinal está na posição
vertical, fixado ao lado pista, transmitindo mensagem de caráter permanente. No
desenvolvimento deste item de estudos foram observadas as disposições da Resolução nº
180, de 26 de agosto de 2005, contidas no Volume I - Sinalização Vertical de
Regulamentação, do Manual Brasileiro de Sinalização de Trânsito e da Resolução nº 243,
de 22 de junho de 2007, contidas no Volume II – Sinalização Vertical de Advertência, do
Manual Brasileiro de Sinalização de Trânsito.
6.4.3 Sinalização Horizontal
A Sinalização horizontal foi projetada observando as disposições da RESOLUÇÃO
Nº 236, DE 11 DE MAIO DE 2007, contidas no Volume IV – Sinalização Horizontal do
Manual Brasileiro de Sinalização de Trânsito.
6.4.4 Resultados obtidos
Os projetos de sinalização estão apresentados a seguir.
86
PROJETO DE SINALIZAÇÃO
87
7 ELEMENTOS GRÁFICOS
A seguir está apresentado o projeto em planta e perfil, bem como a rede de
drenagem a ser implantada para os segmentos em estudo.
88
PROJETOS EM PLANTA E PERFIL
89
8 CONSIDERAÇÕES GERAIS
A seguir são expostas algumas considerações gerais para obra e para conservação
da via:
Cabe destacar que não é possível implantar calçada de maneira contínua ao logo de
toda a extensão das ruas, e em alguns casos não foi possível implantar nenhuma
calçada ao longo da via, isso ocorre principalmente devido à ocupação existente
muitas vezes desordenada e ao espaço disponível para implantação da faixa de
rolamento. Por se tratar de vias locais, restritas ao tráfego de moradores e devido a
largura reduzida das ruas, o projeto de sinalização prevê a redução da velocidade
para 30km/h em todas as ruas, salvo nas vias principais, onde a velocidade máxima
é de 40km/h. Tal medida adotada no projeto, visa garantir a segurança dos usuários;
Foi observado durante a visita de campo que alguns taludes apresentam
escorregamentos, as vias projetadas respeitaram o espaço disponível e, portanto
não houve interferência com os mesmos. Recomenda-se a PMC uma vistoria e
indicar as devidas providências (retaludamento, vegetação ou outro) para não
comprometer as vias projetadas e edificações existentes;
As sondagens SPT e geofísicas não fazem parte do escopo do contrato firmado
entre essa empresa e a PMC, não foi possível determinar a ocorrência de rocha nas
escavações de cavas e valas para drenagem. Na fase de obras, caso seja
identificado à necessidade de escavação de materiais de segunda e terceira
categoria, a fiscalização da PMC deverá ser comunicada e consultada a respeito do
procedimento a ser adotado;
É importante ressaltar que a manutenção periódica da drenagem é imprescindível
para garantir o funcionamento adequado da mesma;
Em todo o segmento viário a que se refere o presente estudo, cuidados especiais
deverão ser empregados na fase de obra, objetivando equacionar as interferências
com as redes subterrâneas de água e esgoto. A empresa executora, antecedendo o
início do serviço deverá contatar a CESAN, buscando minimizar danos às redes
existentes e prejuízos à ocupação lindeira;
A execução dos passeios deverá observar implantação de juntas secas (panos
alternados de concretagem) ou juntas serradas. Tais juntas deverão observar
espaçamento de 2,00m;
90
Nos vários pontos de desague das redes de drenagem projetada, onde a faixa de
servidão não está consolidada é imprescindível à interlocução com a PMC, a fim de
estabelecer junto ao proprietário o uso da área, bem como sua manutenção futura;
É obrigatório o escoramento para valas de profundidade superior a 1,25 m, conforme
estabelece a portaria nº. 3214 do Ministério do Trabalho, de 08/06/1978,
regulamentada pela NR 18 e pela portaria n° 17, de 07/07/83. Em cumprimento a
presente norma, o orçamento quantifica o escoramento de redes com diâmetro e/ou
largura interna de até 1,50m através de gaiolas metálicas, galerias com largura
superior a 1,50m serão executadas com o auxilio de escoramento metálico contínuo
em estacas prancha;
Qualquer alteração nos projetos aqui apresentados deve ser previamente
documentada à fiscalização da PMC.
91
9 ESTIMATIVA DE CUSTOS E PLANO DE EXECUÇÃO
A estimativa orçamentária foi estruturada considerando os quantitativos previstos
para os vários itens de projeto e os custos unitários desenvolvidos no âmbito deste projeto.
Também foram convenientemente considerados os aspectos intervenientes a
implantação destacados no plano de execução.
Desta forma, a estruturação deste item contempla:
Plano de execução;
Quantitativos de serviços;
Custos de implantação;
Cronograma físico financeiro.
9.1 PLANO DE EXECUÇÃO
O plano de execução dos serviços foi estruturado observando a seguinte sequência:
Ataque aos serviços;
Consumo de materiais;
Fonte de suprimentos.
9.1.1 Ataque aos serviços
No efetivo ataque aos serviços deverão ser observados os seguintes aspectos:
Instalação do canteiro de obra;
Implantação de duas placas de obra conforme modelo PMC;
Locação e nivelamento do eixo;
Levantamento de seções transversais e marcação dos offsets;
Mobilização de equipe para execução de rotinas de controle geotécnico dos serviços de
terraplenagem e pavimentação;
92
Elaboração de relatório inicial de obra destacando: a) Plano de ataque aos serviços, b)
Fonte de suprimentos para a fase de obra, inclusive licença ambiental das unidades
industriais relacionadas e c) Análise do projeto destacando eventuais divergências;
Solicitar a PMC intervenções de remanejamento de postes, cercas ou muros de
propriedades ribeirinhas afetadas, se for caso;
Recomenda-se efetuar as movimentações de terra antes da implantação das redes de
drenagem, evitando o tráfego de veículos pesados sobre as redes de tubulação;
A rede de drenagem deverá ser implantada observando o sentido Jusante – Montante;
Concluída a drenagem é que poderá ser implementada a pavimentação;
A construção das Caixas Boca de Lobo e Boca de Lobo Simples deverá observar
rigorosamente o alinhamento do meio fio para posicionamento das guias;
A implantação dos meios-fios poderá ser efetuada após a execução da camada de base
ou após a execução do revestimento.
9.1.2 Consumo de materiais
Os consumos dos materiais especificados no projeto constam no item 8.2 do
presente relatório.
9.1.3 Fonte de suprimento
No âmbito deste projeto, admitiu-se como premissa a utilização da Pedreira Brasitália
como fornecedora de materiais pétreos e asfálticos na implantação do segmento estudado.
Tal procedimento objetiva equalizar a participação dos concorrentes no certame
licitatório. Destaca-se que a ocorrência deverá ser indicada no Relatório Inicial de Obra,
desde que observe rigorosamente as disposições contidas nas especificações técnicas.
93
9.2 QUANTITATIVOS DE SERVIÇOS
As memórias de cálculo dos quantitativos de serviços estão apresentadas a seguir.
94
MEMÓRIA DE CÁLCULO
95
9.3 CUSTOS DE IMPLANTAÇÃO
As planilhas contendo os custos de implantação dos serviços estão apresentadas a
seguir.
Os custos foram orçados levando em consideração a planilha Referencial de Preços
de Serviços Rodoviários do DER-ES com data base de outubro de 2014 com BDI de
26,05%.
Os serviços não contemplados tiveram suas composições unitárias elaboradas tendo
como referência a planilha Referencial de Preços de Serviços Rodoviários do DER-ES com
data base de outubro de 2014.
96
PLANILHA DE QUANTIDADES E CUSTOS
97
98
9.4 CRONOGRAMA FÍSICO FINANCEIRO
O cronograma físico para implantação da obra prevista consta a seguir:
99
Tabela 9.40 - Cronograma físico financeiroSERVIÇO VALOR (R$) 30 60 90 120 150 180 210
24.808,73 22.052,20 8.269,58
45% 40% 15%211.482,37 211.482,37 281.976,49
30% 30% 40%25.650,03 25.650,03 34.200,04
30% 30% 40%453.880,84 340.410,63 340.410,63
40% 30% 30%114.798,48 267.863,12
30% 70%157.603,39 9.850,21 9.850,21 19.700,42
80% 5% 5% 10%31.593,75 31.593,75 31.593,75 31.593,75
25% 25% 25% 25%
667.886,71 641.039,19
ELISIANE C. S. D’ÁVILLACREA: ES-5.038/D
742.055,05 635.333,82TOTAL 2.686.314,77 0,00 0,00 0,00
OBRAS COMPLEMENTARES
382.661,60
INSTALAÇÃO DE CANTEIRO, MOBILIZAÇÃO E
197.004,24
MATERIAL BETUMINOSO
85.500,09
OBRAS DE ARTE CORRENTE E DRENAGEM
1.134.702,10
INSTALAÇÃO DE CANTEIRO, MOBILIZAÇÃO E
126.375,01
TERRAPLENAGEM E SERVIÇOS PRELIMINARES
55.130,50
PAVIMENTAÇÃO 704.941,23
PROCESSO LICITATÓRIO
100
10 ESPECIFICAÇÕES TÉCNICAS
As especificações técnicas a serem observadas na implantação dos serviços são as
efetivamente consolidadas pelo DNIT.
No desenvolvimento dos serviços deverão ser consideradas as seguintes
Especificações:
DNIT 104/2009-ES - SERVIÇOS PRELIMINARES
DNIT 105/2009-ES - CAMINHOS DE SERVIÇO
DNIT 106/2009-ES - CORTES
DNIT 107/2009-ES - EMPRÉSTIMOS
DNIT 108/2009-ES - ATERROS
DNIT 018/2006-ES - SARJETAS E VALETAS DE DRENAGEM
DNIT 020/2006-ES - MEIOS-FIOS E GUIAS
DNIT 021/2004-ES - ENTRADAS E DESCIDAS D'ÁGUA
DNIT 022/2006-ES - DISSIPADORES DE ENERGIA
DNIT 023/2006-ES - BUEIROS TUBULARES DE CONCRETO
DNIT 026/2004-ES - CAIXAS COLETORAS
DNIT 030/2004-ES - DISPOSITIVOS DE DRENAGEM PLUVIAL URBANA
DNIT 137/2010-ES - REGULARIZAÇÃO DO SUBLEITO
DNIT 139/2010-ES - SUB-BASE ESTABILIZADA GRANULOMETRICAMENTE
DNIT 141/2010-ES - BASE ESTABILIZADA GRANULOMETRICAMENTE
DNIT 144/2012-ES - IMPRIMAÇÃO COM LIGANTE ASFÁLTICO
DNIT 145/2012-ES - PINTURA DE LIGAÇÃO COM LIGANTE ASFÁLTICO
DNIT 031/2006-ES - CONCRETO ASFÁLTICO
DNER-ES 327/97 - PAVIMENTO COM PEÇAS PRÉ-MOLDADAS DE CONCRETO
101
11 RESPONSÁVEL TÉCNICO PELO PROJETO
O responsável técnico pelos projetos e orçamento em tela é a Engº Elisiane C. S.
D’Ávilla; Fone: (27) 3345-6758; e-mail: [email protected].
As ART’s referentes aos projetos em questão constam abaixo.
102
Figura 11.21 - ART de projeto
103
Figura 11.22 - ART de projeto (Complementar)
104