RELATÓRIO TÉCNICO Nº: RL-9550.00-6521-940-PR2-001 CLIENTE: TAG/DTO FOLHA: 1 de 45 PROGRAMA: ÁREA: SISTEMA DE TRANSPORTE DA MALHA NORDESTE NP-1 TAG/DTO/GTO TÍTULO: RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE ÍNDICE DE REVISÕES REV. DESCRIÇÃO E/OU FOLHAS ATINGIDAS 0 A Emissão original. Revisão geral. REV. 0 REV. A REV. B REV. C REV. D REV. E REV. F REV. G REV. H DATA 31/10/2016 03/07/2017 PROJETO DTO/GTO/COL DTO/GTO/COL EXECUÇÃO Tiago Tiago VERIFICAÇÃO Thiago Thiago APROVAÇÃO Maurício Maurício AS INFORMAÇÕES DESTE DOCUMENTO SÃO PROPRIEDADE DA TRANSPORTADORA ASSOCIADA DE GÁS (TAG), SENDO PROIBIDA A UTILIZAÇÃO FORA DA SUA FINALIDADE. FORMULÁRIO PERTENCENTE A PETROBRAS N-0381 REV. L.

Transcript of Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte...

Page 1: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO TÉCNICO Nº:

RL-9550.00-6521-940-PR2-001

CLIENTE: TAG/DTO

FOLHA: 1 de 45

PROGRAMA:

ÁREA: SISTEMA DE TRANSPORTE DA MALHA NORDESTE NP-1

TAG/DTO/GTO

TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

Í N D I C E D E R E V I S Õ E S

R E V . D E S C R I Ç Ã O E / O U F O L H A S A T I N G I D A S

0

A

Emissão original.

Revisão geral.

REV. 0 REV. A REV. B REV. C REV. D REV. E REV. F REV. G REV. H

DATA 31/10/2016 03/07/2017

PROJETO DTO/GTO/COL DTO/GTO/COL

EXECUÇÃO Tiago Tiago

VERIFICAÇÃO Thiago Thiago

APROVAÇÃO Maurício Maurício

AS INFORMAÇÕES DESTE DOCUMENTO SÃO PROPRIEDADE DA TRANSPORTADORA ASSOCIADA DE GÁS (TAG), SENDO PROIBIDA A UTILIZAÇÃO FORA DA SUA FINALIDADE.

FORMULÁRIO PERTENCENTE A PETROBRAS N-0381 REV. L.

Page 2: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

2 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

ÍNDICE

1. OBJETIVO .................................................................................................................... 3

2. DESCRIÇÃO DO SISTEMA .......................................................................................... 3

3. DADOS BÁSICOS DE SIMULAÇÃO ............................................................................. 7

3.1 CONDIÇÕES DE SIMULAÇÃO ................................................................................ 7

3.2 COMPOSIÇÃO MOLAR DO GÁS NATURAL ........................................................... 7

3.3 GÁS PARA USO DO SISTEMA ............................................................................... 8

3.4 MARGEM OPERACIONAL E PERDAS DE CARGA ................................................ 8

3.5 DADOS BÁSICOS DOS GASODUTOS.................................................................... 8

4. CENÁRIOS DE TRANSPORTE .................................................................................. 15

5. RESULTADOS ............................................................................................................ 18

6. CONCLUSÃO ............................................................................................................. 26

ANEXO I – STEADY STATE REPORT .............................................................................. 27

Page 3: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

3 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

1. OBJETIVO

O presente relatório tem como objetivo apresentar o escoamento da atual capacidade de transporte contratada de gás natural do Segundo Contrato de Transporte de Gás da Malha Nordeste, calculada através de simulação termo-hidráulica em regime permanente.

2. DESCRIÇÃO DO SISTEMA

O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos gasodutos, ramais, pontos de entrega (PEs), pontos de recebimento (PRs) e sistemas de compressão (estações de compressão – ECOMPs e serviços de compressão – SCOMPs), distribuídos entre os estados da Bahia, Sergipe, Alagoas, Pernambuco, Paraíba, Rio Grande do Norte e Ceará. As figuras 1 e 2 apresentam o esquemático deste sistema. Estas figuras também apresentam os ativos integrantes de outros contratos de transporte (Pilar-Ipojuca e GAL), destacados na cor vermelha.

Figura 1 – Fluxograma da Malha Nordeste (CE/RN/PB/PE/AL/SE/BA)

Page 4: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

4 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 2 – Fluxograma da Malha Nordeste (Malha Bahia)

As características técnicas dos gasodutos, ramais, PRs, PEs, ECOMPs e SCOMPs são apresentadas nas tabelas a seguir.

Tabela 1 – Características dos gasodutos e ramais

* PMOA de 40kgf/cm²g no segundo trecho do ramal, à jusante do PE FAFEN-SERGAS

GASODUTO / RAMAL U.F. DIÂMETRO EXTENSÃO PMOA

(kgf/cm²g) (pol) (km)

GASFOR (GUAMARÉ-PECÉM) CE/RN 12/10 382 100

RAMAL TERMOFORTALEZA CE 10 1,8 100

RAMAL ARACATI CE 4 6,2 51

RAMAL AÇU-SERRA DO MEL (GASMEL) RN 14 31,5 100

NORDESTÃO (GUAMARÉ-CABO) RN/PB/PE 12 431,5 100

RAMAL RECIFE PE 12 19,5 75

RAMAL SANTA RITA PB 8 24,7 51

GASALP (PILAR-CABO) AL/PE 12 199 100

RAMAL TERMOPERNAMBUCO PE 16 11 100

CATU-PILAR – (CATU-CARMÓPOLIS) BA/SE/AL 26 263,5 100

CATU-PILAR – (CARMÓPOLIS-PILAR) BA/SE/AL 26 176 100

ATALAIA-ITAPORANGA (GAI) SE 14 29,5 100

RAMAL FAFEN II (RAMAL FAFEN-SERGÁS) SE 8 21,8 100 / 40*

GASEB (SERGIPE-BAHIA) BA/SE 14 225 51

SANTIAGO-CAMAÇARI 14” BA 14 34,6 51

SANTIAGO-CAMAÇARI 18” BA 18 34,6 51

CANDEIAS-CAMAÇARI 12” BA 12 36,9 51

CANDEIAS-CAMAÇARI 14” BA 14 42 51

CANDEIAS-ARATU 12” BA 12 22,9 51

Page 5: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

5 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Tabela 2 – Características dos pontos de recebimento

PONTO DE RECEBIMENTO UF PRESSÃO MÍNIMA

(kgf/cm²g)

PRESSÃO MÁXIMA

(kgf/cm²g)

PR CAUCAIA (GNL PECÉM) CE 58,0 100,0

PR GUAMARÉ I RN 60,0 100,0

PR GUAMARÉ II RN 60,0 100,0

PR MARECHAL DEODORO (UPGN PILAR) AL 66,0 100,0

PR ATALAIA I SE 40,0 100,0

PR ATALAIA II SE 22,0 35,0

PR POJUCA I (UPGN SANTIAGO) BA 25,0 51,0

PR POJUCA II (UPGN SANTIAGO) BA 26,0 33,0

PR SÃO FRANCISCO DO CONDE I (UPGN CANDEIAS) BA 53,0 100,0

PR SÃO FRANCISCO DO CONDE II (EVF MANATI) BA 34,0 38,0

PR SÃO FRANCISCO DO CONDE III (GNL TRBA) BA 23,0 37,0

INTERCONEXÃO PILAR * AL 45,0 100,0

INTERCONEXÃO IPOJUCA * PE 45,0 100,0

INTERCONEXÃO CATU ** BA 50,0 100,0

* Ponto de Interconexão com o Gasoduto Pilar-Ipojuca ** Ponto de Interconexão com o Gasoduto Cacimbas-Catu

Tabela 3 – Características dos pontos de entrega

PONTO DE ENTREGA UF GASODUTO/ ESTAÇÃO VAZÃO

MÁXIMA (mil m³/dia)

PRESSÃO MÍNIMA

(kgf/cm²g)

PE ÁGUAS CLARAS SE GASEB / CATU-PILAR 45 30,0

PE AQUIRAZ CE GASFOR 650 9,0

PE ARACAJU SE EDG ATALAIA 340 14,0

PE ARAÇÁS BA GASEB / CATU-PILAR 30 20,0

PE ARACATI CE RAMAL ARACATI 40 12,0

PE ARATU MANATI BA EDG ARATU 1.000 20,0

PE ARATU RESIDUAL BA EDG ARATU 1.000 20,0

PE CABO PE NORDESTÃO 1.070 25,0

PE CAMAÇARI MANATI BA EDG CAMAÇARI 4.200 21,0

PE CAMAÇARI RESIDUAL BA EDG CAMAÇARI 2.700 21,0

PE CANDEIAS MANATI BA EDG SÃO FRANCISCO DO CONDE 200 23,0

PE CANDEIAS RESIDUAL BA EDG SÃO FRANCISCO DO CONDE 400 23,0

PE CARMÓPOLIS II - SERGÁS SE CATU-PILAR 49 13,5

PE CARMÓPOLIS II - UO-SEAL SE CATU-PILAR 600 8,5

PE CATU BA EDG CATU 200 23,0

PE CAUCAIA CE GASFOR 45 12,0

PE CEXIS BA CANDEIAS-CAMAÇARI 12” 30 20,0

PE DOW-QUÍMICA BA CANDEIAS-CAMAÇARI 14”/ CANDEIAS-ARATU 12” 1.200 21,0

PE ESTÂNCIA SE GASEB / CATU-PILAR 90 30,0

PE FAFEN-BA BA EDG CAMAÇARI 2.960 21,0

PE FAFEN-SE SE RAMAL FAFEN-SERGAS 1.500 22,0

Page 6: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

6 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

PONTO DE ENTREGA UF GASODUTO/ ESTAÇÃO VAZÃO

MÁXIMA (mil m³/dia)

PRESSÃO MÍNIMA

(kgf/cm²g)

PE FAZENDA ALVORADA BA GASEB / CATU-PILAR 60 25,0

PE FAZENDA BÁLSAMO BA GASEB / CATU-PILAR 30 25,0

PE FAZENDA BELÉM CE GASFOR 202 12,0

PE FORTALEZA CE GASFOR 550 9,0

PE GOIANIA II PE NORDESTÃO 1.000 35,5

PE GOIANINHA RN NORDESTÃO 40 30,0

PE IELMO MARINHO RN NORDESTÃO 8 20,0

PE IGARASSU PE NORDESTÃO 129 25,0

PE IGARASSU II PE NORDESTÃO 93 25,0

PE ITAPORANGA SE GASEB / CATU-PILAR 35 30,0

PE JABOATÃO PE NORDESTÃO 358 35,0

PE MACAÍBA RN NORDESTÃO 1.010 29,0

PE MAMANGUAPE PB NORDESTÃO 25 30,0

PE MANGUINHOS SE RAMAL FAFEN-SERGAS 100 24,0

PE MARECHAL DEODORO AL GASALP 600 38,0

PE MOSSORÓ RN GASFOR 300 32,0

PE PACAJUS CE GASFOR 225 10,0

PE PAULISTA PE NORDESTÃO 202 25,0

PE PECÉM CE GASFOR 90 12,0

PE PEDRAS DE FOGO PB NORDESTÃO 264 29,0

PE PENEDO AL CATU-PILAR 50 31,0

PE RECIFE PE NORDESTÃO 389 25,0

PE RIO LARGO AL GASALP 230 37,0

PE RLAM 14'' BA EDG SÃO FRANCISCO DO CONDE 2.400 23,0

PE RLAM 6” BA EDG SÃO FRANCISCO DO CONDE 400 23,0

PE RNEST PE RAMAL TERMOPERNAMBUCO 2.800 31,5

PE SANTA RITA CG PB NORDESTÃO 200 35,0

PE SANTA RITA JP PB NORDESTÃO 375 26,0

PE SÃO MIGUEL DOS CAMPOS AL CATU-PILAR 50 31,0

PE SOCORRO SE RAMAL FAFEN-SERGAS 200 24,0

PE SUAPE PE GASALP 1.200 45,0

PE UPGN CANDEIAS BA EDG SÃO FRANCISCO DO CONDE 1.500 34,0

PE UTE CHESF BA EDG CAMAÇARI 3.100 21,0

PE UTE FAFEN-BA BA EDG CAMAÇARI 2.960 21,0

PE UTE JOSÉ DE ALENCAR CE GASFOR 1.580 31,5

PE UTE PERNAMBUCO PE RAMAL TERMOPERNAMBUCO 2.600 32,5

PE UTE TERMOAÇU RN RAMAL AÇU-SERRA DO MEL 2500 34,0

PE UTE TERMOBAHIA - RLAM 10'' BA EDG SÃO FRANCISCO DO CONDE 1.500 23,0

PE UTE TERMOCEARÁ CE GASFOR 1.450 31,5

PE UTE TERMOFORTALEZA CE RAMAL TERMOFORTALEZA 1.630 31,5

Page 7: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

7 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Tabela 4 – Características dos sistemas de compressão

SISTEMA DE COMPRESSÃO UF

PRESSÃO MÍNIMA DE

SUCÇÃO (kgf/cm²g)

PRESSÃO MÁXIMA DE DESCARGA (kgf/cm²g)

VAZÃO MÁXIMA

(mil m³/dia)

GÁS COMBUSTÍVEL

(mil m³/d)

ECOMP CATU BA 60,0 100,0 21.000 152

SCOMP ARACATI CE 68,0 100,0 1.756 13

SCOMP MACAÍBA RN 47,0 100,0 2.720 24

SCOMP SANTA RITA PB 67,0 100,0 2.500 14

SCOMP PILAR AL 55,0 100,0 9.000 62

SCOMP CATU BA 16,0 - 23,0 50,0 – 65,0 2.000 21

SCOMP CANDEIAS BA 20,0 51,0 5.580 24

3. DADOS BÁSICOS DE SIMULAÇÃO

3.1 CONDIÇÕES DE SIMULAÇÃO

Os seguintes dados básicos foram utilizados na simulação termo-hidráulica:

Software utilizado: PipelineStudio, versão 4.2

Regime de escoamento: permanente

Condições de referência de vazão: 20 ºC e 1 atm

Coeficiente global de transferência de calor: 1,5 W/m²K

Temperatura ambiente média (verão): 27 °C

Equação de fator de atrito: Colebrook

Equação de estado do gás: BWRS

Equação de viscosidade do gás: LGE

3.2 COMPOSIÇÃO MOLAR DO GÁS NATURAL

As seguintes composições foram adotadas, de acordo com a origem do gás, conforme tabela abaixo.

Tabela 5 – Tabela composicional nos pontos de recebimento

PONTO DE RECEBIMENTO N2 CO2 C1 C2 C3 nC4 iC4 nC5 iC5 C6+

GNL PECÉM 0,04 0,00 92,42 6,42 0,89 0,10 0,09 0,01 0,01 0,01

UPGN GUAMARÉ 1,14 0,66 90,76 6,14 1,10 0,10 0,07 0,01 0,01 0,01

UPGN PILAR 1,45 1,00 91,62 5,89 0,04 0,00 0,00 0,00 0,00 0,00

UPGN ATALAIA 1,46 2,88 87,85 7,76 0,04 0,00 0,00 0,00 0,00 0,01

UPGN SANTIAGO 0,87 1,27 88,61 9,13 0,11 0,00 0,00 0,00 0,00 0,01

UPGN CANDEIAS 4,29 0,49 89,82 5,22 0,16 0,00 0,00 0,00 0,00 0,01

Page 8: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

8 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

PONTO DE RECEBIMENTO N2 CO2 C1 C2 C3 nC4 iC4 nC5 iC5 C6+

EVF MANATI 5,94 0,37 88,83 3,52 0,66 0,21 0,14 0,09 0,07 0,17

GNL BAHIA 0,01 0,00 92,43 5,42 1,60 0,27 0,27 0,00 0,01 0,00

3.3 GÁS PARA USO DO SISTEMA

Os valores de consumo de gás combustível dos sistemas de compressão, utilizados nas simulações, foram obtidos das folhas de dados dos acionadores, considerando a utilização dos compressores na máxima potência. Esses valores são apresentados na tabela 4. O volume de gás utilizado nos aquecedores de pontos de entrega e estações podem ser considerados desprezíveis em relação aos volumes movimentados e, portanto, não foram considerados. 3.4 MARGEM OPERACIONAL E PERDAS DE CARGA

A simulação considerou uma margem operacional de 5,0%, em vazão, da capacidade de transporte dos gasodutos. Sobre o recebimento de gás nos gasodutos, considerou-se uma perda de carga de 1 kgf/cm²g nas saídas dos pontos de recebimento e dos sistemas de compressão, devido à perda de carga nas tubulações e nos equipamentos existentes nessas instalações (medidores de vazão, gás coolers, controles contra sobre-pressão, etc.). Para cada PE, foi considerada uma perda de carga de 3 a 5 kgf/cm²g, conforme as instalações existentes em cada ponto (1 kgf/cm²g para cada subsistema da estação - filtragem, aquecimento, regulagem, medição e tubulações). 3.5 DADOS BÁSICOS DOS GASODUTOS

Na simulação foram adotadas, para gasodutos e ramais, as rugosidades indicadas na tabela 6.

Tabela 6 – Rugosidade dos gasodutos e ramais

GASODUTO / RAMAL RUGOSIDADE

(microns)

GASFOR (GUAMARÉ-PECÉM) 45

RAMAL TERMOFORTALEZA 45

RAMAL ARACATI 45

RAMAL AÇU-SERRA DO MEL (GASMEL) 18

NORDESTÃO (GUAMARÉ-CABO) 45

RAMAL RECIFE 45

RAMAL SANTA RITA 45

GASALP (PILAR-CABO) 45

RAMAL TERMOPERNAMBUCO 45

CATU-PILAR – (CATU-CARMÓPOLIS) 9

Page 9: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

9 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

GASODUTO / RAMAL RUGOSIDADE

(microns)

CATU-PILAR – (CARMÓPOLIS-PILAR) 9

ATALAIA-ITAPORANGA (GAI) 9

RAMAL FAFEN II (RAMAL FAFEN-SERGÁS) 9

GASEB (SERGIPE-BAHIA) 45

SANTIAGO-CAMAÇARI 14” 45

SANTIAGO-CAMAÇARI 18” 45

CANDEIAS-CAMAÇARI 12” 45

CANDEIAS-CAMAÇARI 14” 45

CANDEIAS-ARATU 12” 45

Para o perfil de elevação, foram consideradas as curvas apresentadas nas figuras de 3 a 10, obtidas a partir de dados de georreferenciamento dos gasodutos e ramais.

Figura 3 – Perfil de elevação do gasoduto GASFOR

Figura 4 – Perfil de elevação do ramal Termofortaleza

Page 10: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

10 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 5 – Perfil de elevação do ramal Aracati

Figura 6 – Perfil de elevação do ramal Termoaçu (GASMEL)

Figura 7 – Perfil de elevação do gasoduto Nordestão

Page 11: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

11 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 8 – Perfil de elevação do ramal Recife

Figura 9 – Perfil de elevação do ramal Santa Rita

Figura 10 – Perfil de elevação do gasoduto GASALP

Page 12: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

12 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 11 – Perfil de elevação do ramal Termopernambuco

Figura 12 – Perfil de elevação do gasoduto Catu-Carmópolis

Figura 13 – Perfil de elevação do gasoduto Carmópolis-Pilar

Page 13: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

13 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 14 – Perfil de elevação do gasoduto Atalaia-Itaporanga (GAI)

Figura 15 – Perfil de elevação do ramal FAFEN II

Figura 16 – Perfil de elevação do gasoduto GASEB

Page 14: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

14 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 17 – Perfil de elevação do gasoduto Santiago-Camaçari 14”

Figura 18 – Perfil de elevação do gasoduto Santiago-Camaçari 18”

Figura 19 – Perfil de elevação do gasoduto Candeias-Camaçari 12”

Page 15: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

15 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 20 – Perfil de elevação do gasoduto Candeias-Camaçari 14”

Figura 21 – Perfil de elevação do gasoduto Candeias-Aratu

4. CENÁRIOS DE TRANSPORTE

O cenário adotado para o escoamento da capacidade contratada da Malha Nordeste de transporte considerou as vazões informadas no relatório RT-PSL-13.12=B (reduzido proporcionalmente para obtenção da QDC contratual – fator de correção 0,67004), que representa um cenário de distribuição definido pelo Carregador. Adicionalmente, foi considerado o volume de 259 mil m³/d como gás de uso do sistema, referente ao gás combustível dos sistemas de compressão. As tabelas a seguir apresentam o cenário de oferta e consumo adotado.

Page 16: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

16 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Tabela 7 – Tabela de distribuição de vazão nos pontos de recebimento

PONTO DE RECEBIMENTO VAZÃO

(mil m³/dia)

PR CAUCAIA (GNL PECÉM) 3.351

PR GUAMARÉ I 682

PR GUAMARÉ II 118

PR MARECHAL DEODORO (UPGN PILAR) 529

PR ATALAIA I 249

PR ATALAIA II 300

PR POJUCA I (UPGN SANTIAGO) 0

PR POJUCA II (UPGN SANTIAGO) 371

PR SÃO FRANCISCO DO CONDE I (UPGN CANDEIAS) 747

PR SÃO FRANCISCO DO CONDE II (EVF MANATI) 1.961

PR SÃO FRANCISCO DO CONDE III (GNL TRBA) 3.236

INTERCONEXÃO PILAR * 0

INTERCONEXÃO IPOJUCA * 3.490

INTERCONEXÃO CATU ** 6.809

TOTAL 21.843 * Ponto de Interconexão com o Gasoduto Pilar-Ipojuca ** Ponto de Interconexão com o Gasoduto Cacimbas-Catu

Tabela 8 – Tabela de distribuição de vazão da Malha Nordeste

PONTO DE ENTREGA VAZÃO

(mil m³/dia)

PE PECÉM 6

PE UTE JOSÉ DE ALENCAR 0

PE UTE TERMOFORTALEZA 1.045

PE UTE TERMOCEARÁ 972

PE CAUCAIA 9

PE FORTALEZA 362

PE AQUIRAZ 40

PE PACAJUS 40

PE ARACATI 9

PE FAZENDA BELÉM 0

PE MOSSORÓ 72

PE UTE TERMOAÇU 1.474

PE IELMO MARINHO 1

PE MACAÍBA 281

PE GOIANINHA 9

PE MAMANGUAPE 7

PE SANTA RITA CG 56

Page 17: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

17 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

PONTO DE ENTREGA VAZÃO

(mil m³/dia)

PE SANTA RITA JP 161

PE PEDRAS DE FOGO 143

PE GOIANA II 231

PE IGARASSU 48

PE IGARASSU II 26

PE PAULISTA 76

PE RECIFE 163

PE JABOATÃO 103

PE CABO 417

PE RNEST 1.434

PE UTE PERNAMBUCO 1.441

PE SUAPE 0

PE RIO LARGO 103

PE INTERCONEXÃO PILAR * 3737

PE MARECHAL DEODORO 0

PE SÃO MIGUEL DOS CAMPOS 2

PE PENEDO 2

PE CARMÓPOLIS II - UO-SEAL 0

PE CARMÓPOLIS II - SERGÁS 33

PE FAFEN-SE 612

PE MANGUINHOS 67

PE SOCORRO 134

PE INTERCONEXÃO FAFEN (GAL-EDG ATALAIA) ** 300

PE ARACAJU 228

PE ITAPORANGA 23

PE ÁGUAS CLARAS 30

PE ESTÂNCIA 60

PE FAZENDA ALVORADA 0

PE FAZENDA BÁLSAMO 0

PE ARAÇAS 0

PE CATU 47

PE CAMAÇARI RESIDUAL 720

PE CAMAÇARI MANATI 930

PE UTE CHESF 1.813

PE UTE FAFEN-BA 0

PE FAFEN-BA 1.561

PE ARATU MANATI 0

PE ARATU RESIDUAL 228

PE CEXIS 0

PE DOW-QUÍMICA 287

PE UPGN CANDEIAS 0

PE CANDEIAS MANATI 0

PE CANDEIAS RESIDUAL 177

Page 18: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

18 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

PONTO DE ENTREGA VAZÃO

(mil m³/dia)

PE RLAM 6” 194

PE UTE TERMOBAHIA - RLAM 10'' 905

PE RLAM 14'' 765

TOTAL 21.584 * Ponto de Interconexão com o Gasoduto Pilar-Ipojuca ** Ponto de Interconexão com o Gasoduto Atalaia-Laranjeiras

5. RESULTADOS

A seguir são apresentados os valores resultantes de vazão e pressão na entrada dos pontos de entrega e as condições operacionais dos sistemas de compressão, obtidos na simulação termo-hidráulica.

Tabela 9 – Tabela das vazões e pressões resultantes

PONTO DE ENTREGA VAZÃO

(mil m³/dia) PRESSÃO

(kgf/cm²g)

PE PECÉM 6 97,2

PE UTE JOSÉ DE ALENCAR 0 97,2

PE UTE TERMOFORTALEZA 1.045 97,0

PE UTE TERMOCEARÁ 972 97,3

PE CAUCAIA 9 94,7

PE FORTALEZA 362 96,6

PE AQUIRAZ 40 88,9

PE PACAJUS 40 86,8

PE ARACATI 9 38,9

PE FAZENDA BELÉM 0 78,3

PE MOSSORÓ 72 76,5

PE UTE TERMOAÇU 1.474 73,7

PE IELMO MARINHO 1 77,1

PE MACAÍBA 281 77,3

PE GOIANINHA 9 77,2

PE MAMANGUAPE 7 76,8

PE SANTA RITA CG 56 77,2

PE SANTA RITA JP 161 77,2

PE PEDRAS DE FOGO 143 77,4

PE GOIANA II 231 77,6

PE IGARASSU 48 78,5

PE IGARASSU II 26 78,4

PE PAULISTA 76 78,7

PE RECIFE 163 56,3

PE JABOATÃO 103 56,0

PE CABO 417 82,0

Page 19: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

19 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

PONTO DE ENTREGA VAZÃO

(mil m³/dia) PRESSÃO

(kgf/cm²g)

PE RNEST 1.434 83,0

PE UTE PERNAMBUCO 1.441 82,9

PE SUAPE 0 83,5

PE RIO LARGO 103 89,7

PE INTERCONEXÃO PILAR 3.737 91,0

PE MARECHAL DEODORO 0 80,9

PE SÃO MIGUEL DOS CAMPOS 2 82,2

PE PENEDO 2 83,1

PE CARMÓPOLIS II - UO-SEAL 0 84,7

PE CARMÓPOLIS II - SERGÁS 33 84,7

PE FAFEN-SE 612 83,4

PE MANGUINHOS 67 25,5

PE SOCORRO 134 25,5

PE INTERCONEXÃO FAFEN (GAL-EDG ATALAIA) 300 34,0

PE ARACAJU 228 86,2

PE ITAPORANGA 23 85,8

PE ÁGUAS CLARAS 30 86,2

PE ESTÂNCIA 60 86,6

PE FAZENDA ALVORADA 0 88,3

PE FAZENDA BÁLSAMO 0 88,6

PE ARAÇAS 0 89,2

PE CATU 47 32,0

PE CAMAÇARI RESIDUAL 720 42,6

PE CAMAÇARI MANATI 930 42,6

PE UTE CHESF 1.813 42,6

PE UTE FAFEN-BA 0 42,6

PE FAFEN-BA 1.561 42,6

PE ARATU MANATI 0 36,0

PE ARATU RESIDUAL 228 36,0

PE CEXIS 0 48,4

PE DOW-QUÍMICA 287 47,1

PE UPGN CANDEIAS 0 36,0

PE CANDEIAS MANATI 0 36,0

PE CANDEIAS RESIDUAL 177 36,0

PE RLAM 6” 194 36,0

PE UTE TERMOBAHIA - RLAM 10'' 905 36,0

PE RLAM 14'' 765 36,0

TOTAL 21.584 -

Page 20: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

20 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Tabela 10 – Condições operacionais resultantes nos sistemas de compressão

ECOMP / SCOMP VAZÃO

(mil m³/d)

PRESSÃO DE DESCARGA (kgf/cm²g)

PRESSÃO DE SUCÇÃO (kgf/cm²g)

GÁS COMBUSTÍVEL

(mil m³/d)

ECOMP CATU 5.300 90,0 55,0 152

SCOMP ARACATI DESLIGADA 80,2 80,2 DESLIGADA

SCOMP MACAÍBA DESLIGADA 77,3 77,3 DESLIGADA

SCOMP SANTA RITA DESLIGADA 77,2 77,2 DESLIGADA

SCOMP PILAR 4.825 91,0 80,8 62

SCOMP CATU 303 55,0 32,0 21

SCOMP CANDEIAS 415 50,2 36,0 24

A seguir são apresentados os perfis resultantes de pressão e vazão dos gasodutos, obtidos na simulação termo-hidráulica.

Figura 22 – Perfis de vazão e pressão do gasoduto GASFOR

Figura 23 – Perfis de vazão e pressão do ramal Termofortaleza

Page 21: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

21 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 24 – Perfis de vazão e pressão do ramal Aracati

Figura 25 – Perfis de vazão e pressão do ramal Termoaçu (GASMEL)

Figura 26 – Perfis de vazão e pressão do gasoduto Nordestão

Page 22: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

22 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 27 – Perfis de vazão e pressão do ramal Recife

Figura 28 – Perfis de vazão e pressão do ramal Santa Rita

Figura 29 – Perfis de vazão e pressão do gasoduto GASALP

Page 23: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

23 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 30 – Perfis de vazão e pressão do ramal Termopernambuco

Figura 31 – Perfis de vazão e pressão do gasoduto Catu-Carmópolis

Figura 32 – Perfis de vazão e pressão do gasoduto Carmópolis-Pilar

Page 24: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

24 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 33 – Perfis de vazão e pressão do gasoduto Atalaia-Itaporanga (GAI)

Figura 34 – Perfis de vazão e pressão do ramal FAFEN II

Figura 35 – Perfis de vazão e pressão do gasoduto GASEB

Page 25: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

25 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 36 – Perfis de vazão e pressão do gasoduto Santiago-Camaçari 14”

Figura 37 – Perfis de vazão e pressão do gasoduto Santiago-Camaçari 18”

Figura 38 – Perfis de vazão e pressão do gasoduto Candeias-Camaçari 12”

Page 26: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

26 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Figura 39 – Perfis de vazão e pressão do gasoduto Candeias-Camaçari 14”

Figura 40 – Perfis de vazão e pressão do gasoduto Candeias-Aratu

6. CONCLUSÃO

Para o cenário de transporte utilizado no presente relatório, com base nos resultados da simulação, o sistema integrante do Contrato Malha Nordeste possui capacidade técnica para movimentação da capacidade contratada de 21.584 mil m³/d. No cenário adotado, além da capacidade contratada, foi movimentado o volume de 259 mil m³/d de gás de uso do sistema, correspondente ao consumo da ECOMP Catu e dos SCOMPs Candeias, Catu e Pilar.

Page 27: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

27 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

ANEXO I – STEADY STATE REPORT

Default Initial Values Selected

Pressure 50.200

Flow 666.922

Temperature 33.001

% C1 90.255

% C2 6.104

% C3 0.356

% IC4 0.035

% NC4 0.040

% IC5 0.014

% NC5 0.009

% C6 0.018

% CO2 1.052

% N2 2.117

Problem Size Report

Nodes 106

Pipes 92

Supplies 12

Deliveries 70

Block Valves 6

Generic Compressors 7

Regulators 5

Compositional Fluids 16

Steady State Convergence Report

Iteration Number

Tolerance Requested

Greatest Hydraulic Adjustment

Greatest Temperature Adjustment

Greatest Composition Adjustment

Associated Device

0 0.0000100 1.047.668.176 0.0000000 0.0000000 Flux 21-2

1 0.0000100 476.827.397 0.0000000 0.0000000 Flux 21-2

2 0.0000100 160.676.450 0.0000000 0.0000000 Flux 13-2

Starting over with DPMX = 11.250241

3 0.0000100 1.463.620.051 0.0000000 0.0000000 Flux 21-2

4 0.0000100 825.919.326 0.0000000 0.0000000 Flux 21-2

5 0.0000100 288.465.590 0.0000000 0.0000000 Flux 22-2

6 0.0000100 109.118.986 0.0000000 0.0000000 Flux 12-2

Starting over with DPMX = 1.125024

7 0.0000100 1.532.294.159 0.0000000 0.0000000 Flux 21-2

8 0.0000100 787.324.014 0.0000000 0.0000000 Flux 21-2

9 0.0000100 409.130.966 0.0000000 0.0000000 Flux 21-2

10 0.0000100 246.234.394 0.0000000 0.0000000 Flux 21-2

Page 28: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

28 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Steady State Convergence Report

11 0.0000100 187.704.225 0.0000000 0.0000000 Flux 21-2

12 0.0000100 171.830.403 0.0000000 0.0000000 Flux 21-2

DPMX increased to 2.250048

13 0.0000100 165.557.260 0.0000000 0.0000000 Flux 21-2

14 0.0000100 155.220.874 0.0000000 0.0000000 Flux 21-2

15 0.0000100 145.394.738 0.0000000 0.0000000 Flux 21-2

16 0.0000100 136.032.458 0.0000000 0.0000000 Flux 21-2

17 0.0000100 126.060.490 0.0000000 0.0000000 Flux 21-2

DPMX increased to 4.500096

18 0.0000100 116.208.006 0.0000000 0.0000000 Flux 21-2

19 0.0000100 96.487.768 0.0000000 0.0000000 Flux 21-2

20 0.0000100 181.202.953 0.0000000 0.0000000 Flux 15-2

21 0.0000100 69.229.110 0.0000000 0.0000000 Flux 15-2

DPMX increased to 9.000192

22 0.0000100 44.753.237 0.0000000 0.0190462 Flux 21-2

23 0.0000100 74.154.649 0.0000000 0.0190462 Flux 15-2

24 0.0000100 0.4520042 0.0000012 0.0039219 Flux 16-2

DPMX increased to 18.000385

25 0.0000100 0.0569670 0.0000012 0.0039219 Pipe

Nordestão-01

26 0.0000100 0.0005022 0.0000011 0.0000065 Node 42

27 0.0000100 0.0610742 0.0000011 0.0000065 Pipe Catu-Pilar-

09

DPMX increased to 36.00077

28 0.0000100 0.0000608 0.0000033 0.0000059 Node 01

29 0.0000100 0.0232036 0.0000033 0.0000059 Pipe Catu-Pilar-

08

30 0.0000100 0.0000066 0.0000014 0.0000051 Node 17-2

DPMX increased to 72.001539

31 0.0000100 0.0005426 0.0000013 0.0000051 Xreg PR UPGN

Santiago

32 0.0000100 0.0000015 0.0000003 0.0000051 QNode 26

33 0.0000100 0.0005155 0.0000008 0.0000051 Xreg PR UPGN

Santiago

DPMX increased to 144.003079

34 0.0000100 0.0000002 0.0000053 0.0000051 QNode 33

35 0.0000100 0.0001223 0.0000025 0.0000007 Xreg PR UPGN

Santiago

36 0.0000100 0.0000000 0.0000008 0.0000007 QNode 32

DPMX increased to 288.006158

37 0.0000100 0.0000201 0.0000001 0.0000001 Xreg PR UPGN

Santiago

38 0.0000100 0.0000008 0.0000031 0.0000001 TNode 19-2

Page 29: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

29 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

NE4-161212-GTA-A1 : 0.000 hours

Reference Conditions Report

Reference Pressure 0.00 kg/cm2g

Reference Temperature 20.00 Deg C

Network Flow Balance Report : 0.000 hours

Network Flow Balance

Mass Units Volumetric Units

kg/s kSm3/d

Total Input Flow 183.967 21.843.000

Total Output Flow 183.967 21.843.000

Network Flow Balance 0.000 0.000

Node Mass Balance Report : 0.000 hours

Node Mass Balance - Threshold = 0.010000

Node Name Mass Balance Error

kSm3/d

No Mass Balance Errors Above Threshold

Pipe Hydraulic Summary Report : 0.000 hours

Pipe Summary

Pipe Name

Pressure kg/cm2g

Flow kSm3/d Line Pack

kSm3

Temperature Deg C

Head Tail Head Tail Head Tail

Nordestão-01 77.54 76.14 122.000 122.000 3.663.048 50.00 32.96

Nordestão-02 76.14 77.17 122.000 122.000 3.887.645 32.96 33.03

Nordestão-03 77.17 77.34 121.000 121.000 1.386.867 33.03 33.02

Nordestão-04 76.68 77.34 160.000 160.000 2.127.389 32.89 33.05

Nordestão-05 77.30 76.68 160.000 160.000 835.420 33.04 32.89

Nordestão-06 76.48 77.30 169.000 169.000 3.130.461 32.89 33.04

Nordestão-07 76.88 76.48 169.000 169.000 533.584 32.98 32.89

Nordestão-09 77.42 77.29 393.000 393.000 1.251.472 32.89 32.99

Nordestão-10 78.01 77.42 536.000 536.000 1.480.634 33.13 32.89

Nordestão-11 77.68 78.01 536.000 536.000 414.660 32.82 33.13

Nordestão-12 78.55 77.68 767.000 767.000 1.602.156 32.86 32.82

Page 30: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

30 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Pipe Name

Pressure kg/cm2g

Flow kSm3/d Line Pack

kSm3

Temperature Deg C

Head Tail Head Tail Head Tail

Nordestão-13 78.55 78.55 815.000 815.000 257.926 32.74 32.86

Nordestão-14 78.79 78.55 841.000 841.000 484.677 32.67 32.74

GASALP-01 83.57 82.05 1.600.000 1.600.000 852.657 32.20 32.06

Nordestão-08 77.29 76.88 176.000 176.000 2.887.684 32.99 32.98

Nordestão-15 79.01 78.79 917.000 917.000 275.586 32.68 32.67

Nordestão-17 56.28 56.00 -163.000 -163.000 319.417 32.07 22.65

Nordestão-18 82.05 80.35 1.183.000 1.183.000 1.409.200 32.06 32.20

Nordestão-16 55.96 56.28 0.000 0.000 604.051 33.00 33.00

GASALP-02 86.20 83.57 985.000 985.000 5.715.892 32.81 32.90

GASALP-05 91.00 91.48 1.088.000 1.088.000 361.276 44.37 42.34

GASFOR-02 77.54 75.55 677.998 677.998 4.423.887 50.00 32.92

GASFOR-04 75.55 74.47 677.998 677.998 566.720 32.92 32.40

GASFOR-05 76.38 74.39 796.000 796.000 930.312 33.00 32.13

GASFOR-06 76.56 76.38 796.000 796.000 930.342 32.82 33.00

GASFOR-07 78.38 76.56 868.000 868.000 3.116.110 32.72 32.82

GASFOR-08 79.74 78.38 868.000 868.000 1.899.020 32.79 32.72

GASFOR-09 80.20 79.74 877.000 877.000 1.043.168 32.55 32.79

GASFOR-17 88.91 86.84 917.000 917.000 1.115.139 32.11 32.31

GASFOR-18 97.31 94.76 1.328.000 1.328.000 785.100 33.00 32.39

GASFOR-19 97.31 97.29 6.000 6.000 73.281 33.00 33.00

GASFOR-20 86.84 80.20 877.000 877.000 3.833.798 32.31 32.55

GASFOR-21 74.39 74.47 796.000 796.000 434.847 32.13 32.63

GASMEL-01 74.47 74.92 1.474.000 1.474.000 482.117 32.53 33.15

Ramal Termofortaleza 97.31 97.08 1.045.000 1.045.000 97.500 33.00 32.93

Ramal Aracati 39.00 38.99 9.000 9.000 20.860 16.31 33.00

GASMEL-02 74.92 73.73 1.474.000 1.474.000 1.842.843 33.15 32.91

GASFOR-22 97.29 97.29 6.000 6.000 620.010 33.00 33.00

GASFOR-23 94.76 90.62 1.319.000 1.319.000 1.322.048 32.39 31.97

GASFOR-24 90.62 88.91 957.000 957.000 830.769 31.97 32.11

GASALP-06 80.90 80.88 529.000 529.000 60.936 50.00 48.22

GASALP-04 91.48 90.09 1.088.000 1.088.000 532.415 42.34 38.90

GASALP-03 90.09 89.69 1.088.000 1.088.000 688.533 38.90 36.71

GASALP-07 89.69 86.20 985.000 985.000 6.063.236 36.71 32.81

Ramal Termopern-01 83.57 83.06 2.875.000 2.875.000 490.121 32.20 32.14

Ramal Termopern-02 83.06 82.93 1.441.000 1.441.000 678.708 32.14 32.36

Variante Nordestão 80.35 79.01 917.000 917.000 2.038.775 32.20 32.68

Catu-Pilar-14 85.86 84.88 5.207.999 5.207.999 7.413.771 33.04 32.66

Catu-Pilar-13 84.88 85.12 5.207.999 5.207.999 4.521.750 32.66 33.04

Catu-Pilar-12 84.32 84.69 4.395.000 4.395.000 4.465.072 32.53 33.00

Catu-Pilar-11 84.69 84.20 4.362.000 4.362.000 1.742.555 33.00 32.70

Ramal FAFEN-01 85.12 83.47 813.000 813.000 261.438 33.04 32.63

Page 31: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

31 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Pipe Name

Pressure kg/cm2g

Flow kSm3/d Line Pack

kSm3

Temperature Deg C

Head Tail Head Tail Head Tail

Ramal FAFEN-02 26.00 25.51 201.000 201.000 91.786 6.49 29.84

Catu-Pilar-15 86.28 85.86 5.209.999 5.209.999 4.100.038 33.26 33.04

Catu-Pilar-17 88.29 87.42 5.299.999 5.300.000 6.864.885 35.78 34.45

Catu-Pilar-18 88.66 88.29 5.299.999 5.299.999 3.360.997 36.63 35.78

Catu-Pilar-19 89.23 88.66 5.300.000 5.299.999 12.282.328 41.23 36.63

Catu-Pilar-20 90.00 89.23 5.299.999 5.300.000 10.195.790 50.00 41.23

Catu-Pilar-16 86.60 86.28 5.239.999 5.239.999 4.538.530 33.45 33.26

GAI 86.20 85.86 21.000 21.000 2.517.970 50.00 33.00

GASEB-02 33.91 33.88 0.000 0.000 429.929 33.00 33.00

GASEB-03 33.90 33.91 0.000 0.000 461.252 33.00 33.00

GASEB-04 33.68 33.90 0.000 0.000 1.843.351 33.00 33.00

GASEB-07 33.68 33.83 0.000 0.000 1.223.504 33.00 33.00

GASEB-08 33.68 33.65 0.000 0.000 1.081.067 33.00 33.00

Catu-Pilar-08 82.39 83.70 4.361.998 4.362.002 7.967.062 31.93 33.34

Catu-Pilar-09 84.53 82.39 4.362.000 4.361.998 6.914.855 33.04 31.93

Catu-Pilar-10 84.20 84.53 4.362.000 4.362.000 2.768.842 32.70 33.04

Ramal FAFEN-03 25.51 25.49 67.000 67.000 25.699 29.84 32.36

GASEB-01 33.88 34.00 0.000 0.000 904.683 33.00 33.00

GASEB-06 33.83 33.79 0.000 0.000 356.837 33.00 33.00

GASEB-05 33.79 33.68 0.000 0.000 696.605 33.00 33.00

Catu-Pilar-12b 85.12 84.32 4.395.000 4.395.000 1.927.494 33.04 32.53

Catu-Pilar-16b 87.42 86.60 5.300.000 5.299.999 17.901.146 34.45 33.45

Catu-Pilar-01 81.36 80.88 4.358.000 4.357.999 9.596.764 32.66 32.79

Catu-Pilar-02 82.20 81.36 4.358.000 4.358.000 426.631 33.31 32.66

Catu-Pilar-03 81.46 82.20 4.360.000 4.360.000 996.015 32.70 33.31

Catu-Pilar-06 83.70 83.13 4.362.002 4.362.000 929.556 33.34 32.92

Catu-Pilar-04 82.46 81.46 4.359.997 4.360.000 14.163.696 32.71 32.70

Catu-Pilar-05 83.13 82.46 4.360.000 4.359.997 6.811.423 32.92 32.71

Linha UPGN-EDG Catu 32.00 32.00 -371.000 -371.000 64.469 33.00 33.00

San-Cam-18-01 43.00 43.08 1.095.481 1.095.481 348.961 28.63 30.29

San-Cam-18-02 43.08 42.64 1.095.481 1.095.481 1.995.583 30.29 32.74

San-Cam-14-01 43.00 43.08 564.519 564.519 210.018 28.63 30.79

San-Cam-14-02 43.08 42.64 564.519 564.519 1.200.378 30.79 32.92

Can-Cam-14-03 50.21 47.16 2.095.843 2.095.843 703.460 34.40 33.04

Can-Cam-14-02 47.16 46.10 1.808.843 1.808.843 308.085 33.04 32.74

Can-Cam-14-01 46.10 42.64 1.808.843 1.808.843 850.008 32.74 31.97

Can-Cam-12-01 48.41 42.64 1.555.157 1.555.157 961.751 33.49 31.87

Can-Cam-12-02 50.21 48.41 1.555.157 1.555.157 370.474 34.40 33.49

Candeias-Aratu-01 36.00 35.95 228.000 228.000 412.766 33.00 33.01

Candeias-Aratu-02 35.95 35.94 228.000 228.000 217.191 33.01 33.02

Page 32: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

32 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Equipment Hydraulic Summary Report : 0.000 hours

Equipment Summary

Equipment Name

Mode of Control

Pressure kg/cm2g Flow

kSm3/d

Temperature Deg C Specific

Gravity

Heating Value

Up Down Up Down MJ/m3

GUAMARE PercentOpen 77.54 77.54 -4.000 50.00 50.00 0.6040 38.65

Blkv0105 PercentOpen 33.65 55.00 0.000 33.00 33.73 0.6135 38.95

Blkv0116 PercentOpen 35.95 47.16 0.000 33.01 33.04 0.6110 36.68

Blkv0114 PercentOpen 47.16 47.16 287.000 33.04 33.04 0.5972 37.43

Blkv0115 PercentOpen 35.94 35.94 -228.000 33.02 33.02 0.6110 36.68

Blkv0113 PercentOpen 35.94 46.10 0.000 33.02 32.74 0.6110 36.68

ERP Jaboatão

MaximumDownstreamPressure

80.35 56.00 266.000 32.20 22.65 0.5982 37.68

ERP Recife Closed 79.01 55.96 0.000 32.68 33.00 0.5982 37.68

ERP Aracati MaximumDownstreamPr

essure 79.74 39.00 9.000 32.79 16.31 0.5954 37.53

PE FAFEN-Sergás

MaximumDownstreamPressure

83.47 26.00 201.000 32.63 6.49 0.6136 38.95

Regu0048 MaximumDownstreamPr

essure 55.00 43.00 1.660.000 33.73 28.63 0.6135 38.95

SCOMP Macaiba

Bypass 77.34 77.34 160.000 33.05 33.03 0.5982 37.68

SCOMP Santa Rita

Bypass 77.29 77.29 176.000 32.99 32.99 0.5982 37.68

SCOMP Pilar II

MaximumDownstreamPressure

80.88 91.00 4.824.999 34.41 44.37 0.6115 38.77

SCOMP Aracati

Bypass 80.20 80.20 877.000 32.55 32.55 0.5954 37.53

SCOMP Catu MaximumDownstreamPr

essure 32.00 55.00 303.000 33.00 33.73 0.6142 38.95

ECOMP Catu MaximumDownstreamPr

essure 55.00 90.00 5.299.999 33.73 50.00 0.6135 38.95

SCOMP Candeias

MaximumFlow 36.00 50.21 415.000 33.00 34.40 0.6110 36.68

Accumulated Volume Summary

Equipment Name

Current Flow Rate kSm3/d

Current Accumulated Volume kSm3

Last Accumulated Volume kSm3

Timer Value hours

GUAMARE -40.000 0.0000 0.0000 24.000

Blkv0105 0.0000 0.0000 0.0000 24.000

Blkv0116 0.0000 0.0000 0.0000 24.000

Blkv0114 2.870.000 0.0000 0.0000 24.000

Blkv0115 -2.280.001 0.0000 0.0000 24.000

Blkv0113 0.0000 0.0000 0.0000 24.000

ERP Jaboatão 2.660.000 0.0000 0.0000 24.000

ERP Recife 0.0000 0.0000 0.0000 24.000

ERP Aracati 90.000 0.0000 0.0000 24.000

Page 33: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

33 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Equipment Name

Current Flow Rate kSm3/d

Current Accumulated Volume kSm3

Last Accumulated Volume kSm3

Timer Value hours

PE FAFEN-Sergás 2.010.000 0.0000 0.0000 24.000

Regu0048 16.599.999 0.0000 0.0000 24.000

SCOMP Macaiba 1.600.000 0.0000 0.0000 24.000

SCOMP Santa Rita 1.759.999 0.0000 0.0000 24.000

SCOMP Pilar II 48.249.993 0.0000 0.0000 24.000

SCOMP Aracati 8.770.000 0.0000 0.0000 24.000

SCOMP Catu 3.030.002 0.0000 0.0000 24.000

ECOMP Catu 52.999.993 0.0000 0.0000 24.000

SCOMP Candeias 4.150.000 0.0000 0.0000 24.000

Compressor Data Summary

Compressor Name Head

N.m/kg

Compressor Flow

kSm3/d

Actual Flow m3/d

Recycle Flow

kSm3/d

Speed RPM

Adiabatic Efficiency percent

Discharge Temperature

Deg C

Power Required

HP

Power Available

HP

SCOMP Macaiba 0.00 0.00 1928.45 0.00 100.00 33.05 0.00 0.00

SCOMP Santa Rita 0.00 0.00 2122.08 0.00 100.00 32.99 0.00 0.00

SCOMP Pilar II 14783.33 4825.00 55166.71 0.00 78.00 44.37 1066.40 1066.40

SCOMP Aracati 0.00 0.00 10185.56 0.00 100.00 32.55 0.00 0.00

SCOMP Catu 75090.52 303.00 9269.96 0.00 78.00 78.85 341.64 341.64

ECOMP Catu 66520.14 5300.00 91885.24 0.00 78.00 75.82 5288.01 5288.01

SCOMP Candeias 45459.69 415.00 11341.27 0.00 78.00 61.00 281.83 281.83

Xreg Hydraulic Summary Report : 0.000 hours

Xreg Summary

Xreg Name Mode of Control Pressure kg/cm2g

Flow kSm3/d

Temperature Deg C

Specific Gravity

Heating Value MJ/m3

PR UPGN Pilar MaximumFlow 80.90 -529.000 50.00 0.5945 37.36

PR Guamaré II MaximumFlow 77.54 -118.000 50.00 0.6040 38.65

PR GNL CE MaximumFlow 97.31 -3.351.000 33.00 0.5954 37.53

PR Guamaré I MaximumFlow 77.54 -682.000 50.00 0.6040 38.65

PR Atalaia I MaximumFlow 86.20 -249.000 50.00 0.6325 38.24

PR Atalaia II MaximumPressure 34.00 -300.000 33.00 0.6325 38.24

PR UPGN Santiago MaximumPressure 32.00 -371.000 33.00 0.6142 38.95

PR Int GASENE MaximumFlow 55.00 -6.809.000 33.00 0.6135 38.95

PR GNL BA MaximumFlow 50.21 -3.236.000 33.00 0.5954 37.52

PR EVF Manati MaximumFlow 36.00 -1.961.000 33.00 0.6164 36.81

PR UPGN Candeias MaximumPressure 36.00 -747.000 33.00 0.5971 36.35

PR Int Ipojuca MaximumFlow 83.57 -3.490.000 32.00 0.5945 37.36

Page 34: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

34 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Xreg Name Mode of Control Pressure kg/cm2g

Flow kSm3/d

Temperature Deg C

Specific Gravity

Heating Value MJ/m3

PE Ielmo Marinho MaximumFlow 77.17 1.000 33.03 0.6040 38.65

PE Macaíba MaximumFlow 77.34 281.000 33.03 0.6007 38.10

PE Goianinha MaximumFlow 77.30 9.000 33.04 0.5982 37.68

PE Santa Rita JP MaximumFlow 77.29 161.000 32.99 0.5982 37.68

PE Igarassu MaximumFlow 78.55 48.000 32.86 0.5982 37.68

PE Igarassu II MaximumFlow 78.55 26.000 32.74 0.5982 37.68

PE Paulista MaximumFlow 78.79 76.000 32.67 0.5982 37.68

PE Recife MaximumFlow 56.28 163.000 32.07 0.5982 37.68

PE Jaboatão MaximumFlow 56.00 103.000 22.65 0.5982 37.68

PE Cabo MaximumFlow 82.05 417.000 32.06 0.5982 37.68

PE Pedras de Fogo MaximumFlow 77.42 143.000 32.89 0.5982 37.68

PE Mamanguape MaximumFlow 76.88 7.000 32.98 0.5982 37.68

PE UTE Pernambuco MaximumFlow 82.93 1.441.000 32.36 0.5982 37.68

PE Rio Largo MaximumFlow 89.69 103.000 36.71 0.6115 38.77

PE Santa Rita CG MaximumFlow 77.29 56.000 32.99 0.5982 37.68

PE RNEST MaximumFlow 83.06 1.434.000 32.14 0.5982 37.68

PE Goiania II MaximumFlow 77.68 231.000 32.82 0.5982 37.68

PE Pecém MaximumFlow 97.29 6.000 33.00 0.5954 37.53

PE UTE Termoceará MaximumFlow 97.31 972.000 33.00 0.5954 37.53

PE Caucaia MaximumFlow 94.76 9.000 32.39 0.5954 37.53

PE Fortaleza MaximumFlow 90.62 362.000 31.97 0.5954 37.53

PE Pacajus MaximumFlow 86.84 40.000 32.31 0.5954 37.53

PE Aracati MaximumFlow 38.99 9.000 33.00 0.5954 37.53

PE Fazenda Belém MaximumFlow 78.38 0.000 32.72 0.5954 37.53

PE Mossoró MaximumFlow 76.56 72.000 32.82 0.5954 37.53

PE UTE Termofortaleza MaximumFlow 97.08 1.045.000 32.93 0.5954 37.53

PE UTE Termoaçu MaximumFlow 73.73 1.474.000 32.91 0.5994 38.05

PE UTE José de Alencar MaximumFlow 97.29 0.000 33.00 0.5954 37.53

PE Aquiraz MaximumFlow 88.91 40.000 32.11 0.5954 37.53

PE Marechal Deodoro MaximumFlow 80.90 0.000 50.00 0.5945 37.36

GUS SCOMP Pilar MaximumFlow 80.88 62.000 34.41 0.6115 38.77

GUS SCOMP Aracati MaximumFlow 80.20 0.000 32.55 0.5954 37.53

GUS SCOMP Macaíba MaximumFlow 77.34 0.000 33.05 0.5982 37.68

GUS SCOMP Santa Rita MaximumFlow 77.29 0.000 32.99 0.5982 37.68

PE Itaporanga MaximumFlow 85.86 23.000 33.04 0.6136 38.95

PE Socorro MaximumFlow 25.51 134.000 29.84 0.6136 38.95

PE Manguinhos MaximumFlow 25.49 67.000 32.36 0.6136 38.95

PE Estância MaximumFlow 86.60 60.000 33.45 0.6135 38.95

PE Araças MaximumFlow 89.23 0.000 41.23 0.6135 38.95

PE Águas Claras MaximumFlow 86.28 30.000 33.26 0.6135 38.95

Page 35: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

35 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Xreg Name Mode of Control Pressure kg/cm2g

Flow kSm3/d

Temperature Deg C

Specific Gravity

Heating Value MJ/m3

PE Fazenda Bálsamo MaximumFlow 88.66 0.000 36.63 0.6135 38.95

PE Fazenda Alvorada MaximumFlow 88.29 0.000 35.78 0.6135 38.95

PE Aracaju MaximumFlow 86.20 228.000 50.00 0.6325 38.24

PE FAFEN-SE MaximumFlow 83.47 612.000 32.63 0.6136 38.95

PE Carmópolis II - SERGÁS MaximumFlow 84.69 33.000 33.00 0.6136 38.95

PE Carmópolis II - UO-SEAL MaximumFlow 84.69 0.000 33.00 0.6136 38.95

PE Catu MaximumFlow 32.00 47.000 33.00 0.6142 38.95

PE São Miguel dos Campos MaximumFlow 82.20 2.000 33.31 0.6136 38.95

PE Penedo MaximumFlow 83.13 2.000 32.92 0.6136 38.95

GUS SCOMP Catu MaximumFlow 32.00 21.000 33.00 0.6142 38.95

GUS ECOMP Catu MaximumFlow 55.00 152.000 33.73 0.6135 38.95

PE Int GASENE MaximumFlow 55.00 0.000 33.73 0.6135 38.95

PE FAFEN-BA MaximumFlow 42.64 1.561.000 32.22 0.6026 37.93

PE UTE Chesf MaximumFlow 42.64 1.813.000 32.22 0.6026 37.93

PE Camaçari Residual MaximumFlow 42.64 720.000 32.22 0.6026 37.93

PE Camaçari Manati MaximumFlow 42.64 930.000 32.22 0.6026 37.93

PE Aratu Residual MaximumFlow 35.94 228.000 33.02 0.6110 36.68

PE Aratu Manati MaximumFlow 35.94 0.000 33.02 0.6110 36.68

PE Cexis MaximumFlow 48.41 0.000 33.49 0.5972 37.43

PE Candeias Manati MaximumFlow 36.00 0.000 33.00 0.6110 36.68

PE Candeias Residual MaximumFlow 36.00 177.000 33.00 0.6110 36.68

PE UTE Termobahia - RLAM 10''

MaximumFlow 36.00 905.000 33.00 0.6110 36.68

PE RLAM 6” MaximumFlow 36.00 194.000 33.00 0.6110 36.68

PE UPGN Candeias MaximumFlow 36.00 0.000 33.00 0.6110 36.68

PE RLAM 14'' MaximumFlow 36.00 765.000 33.00 0.6110 36.68

PE UTE FAFEN-BA MaximumFlow 42.64 0.000 32.22 0.6026 37.93

PE Dow-Química MaximumFlow 47.16 287.000 33.04 0.5972 37.43

GUS SCOMP Candeias MaximumFlow 36.00 24.000 33.00 0.6110 36.68

PE Int FAFEN-GAL MaximumFlow 34.00 300.000 33.00 0.6325 38.24

PE Int Pilar MaximumFlow 91.00 3.737.000 44.37 0.6115 38.77

Accumulated Volume Summary

Xreg Name Current Flow

Rate kSm3/d

Current Accumulated Volume kSm3

Last Accumulated Volume kSm3

Timer Value hours

PR UPGN Pilar -5.290.000 0.0000 0.0000 24.000

PR Guamaré II -1.180.000 0.0000 0.0000 24.000

PR GNL CE -33.510.000 0.0000 0.0000 24.000

PR Guamaré I -6.820.000 0.0000 0.0000 24.000

Page 36: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

36 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Xreg Name Current Flow

Rate kSm3/d

Current Accumulated Volume kSm3

Last Accumulated Volume kSm3

Timer Value hours

PR Atalaia I -2.490.000 0.0000 0.0000 24.000

PR Atalaia II -3.000.000 0.0000 0.0000 24.000

PR UPGN Santiago -3.710.002 0.0000 0.0000 24.000

PR Int GASENE -68.090.000 0.0000 0.0000 24.000

PR GNL BA -32.360.000 0.0000 0.0000 24.000

PR EVF Manati -19.610.000 0.0000 0.0000 24.000

PR UPGN Candeias -7.469.999 0.0000 0.0000 24.000

PR Int Ipojuca -34.900.000 0.0000 0.0000 24.000

PE Ielmo Marinho 10.000 0.0000 0.0000 24.000

PE Macaíba 2.810.000 0.0000 0.0000 24.000

PE Goianinha 90.000 0.0000 0.0000 24.000

PE Santa Rita JP 1.610.000 0.0000 0.0000 24.000

PE Igarassu 480.000 0.0000 0.0000 24.000

PE Igarassu II 260.000 0.0000 0.0000 24.000

PE Paulista 760.000 0.0000 0.0000 24.000

PE Recife 1.630.000 0.0000 0.0000 24.000

PE Jaboatão 1.030.000 0.0000 0.0000 24.000

PE Cabo 4.170.000 0.0000 0.0000 24.000

PE Pedras de Fogo 1.430.000 0.0000 0.0000 24.000

PE Mamanguape 70.000 0.0000 0.0000 24.000

PE UTE Pernambuco 14.410.000 0.0000 0.0000 24.000

PE Rio Largo 1.030.000 0.0000 0.0000 24.000

PE Santa Rita CG 560.000 0.0000 0.0000 24.000

PE RNEST 14.340.000 0.0000 0.0000 24.000

PE Goiania II 2.310.000 0.0000 0.0000 24.000

PE Pecém 60.000 0.0000 0.0000 24.000

PE UTE Termoceará 9.720.000 0.0000 0.0000 24.000

PE Caucaia 90.000 0.0000 0.0000 24.000

PE Fortaleza 3.620.000 0.0000 0.0000 24.000

PE Pacajus 400.000 0.0000 0.0000 24.000

PE Aracati 90.000 0.0000 0.0000 24.000

PE Fazenda Belém 0.0000 0.0000 0.0000 24.000

PE Mossoró 720.000 0.0000 0.0000 24.000

PE UTE Termofortaleza 10.450.000 0.0000 0.0000 24.000

PE UTE Termoaçu 14.740.000 0.0000 0.0000 24.000

PE UTE José de Alencar 0.0000 0.0000 0.0000 24.000

PE Aquiraz 400.000 0.0000 0.0000 24.000

PE Marechal Deodoro 0.0000 0.0000 0.0000 24.000

GUS SCOMP Pilar 620.000 0.0000 0.0000 24.000

GUS SCOMP Aracati 0.0000 0.0000 0.0000 24.000

GUS SCOMP Macaíba 0.0000 0.0000 0.0000 24.000

Page 37: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

37 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Xreg Name Current Flow

Rate kSm3/d

Current Accumulated Volume kSm3

Last Accumulated Volume kSm3

Timer Value hours

GUS SCOMP Santa Rita 0.0000 0.0000 0.0000 24.000

PE Itaporanga 230.000 0.0000 0.0000 24.000

PE Socorro 1.340.000 0.0000 0.0000 24.000

PE Manguinhos 670.000 0.0000 0.0000 24.000

PE Estância 600.000 0.0000 0.0000 24.000

PE Araças 0.0000 0.0000 0.0000 24.000

PE Águas Claras 300.000 0.0000 0.0000 24.000

PE Fazenda Bálsamo 0.0000 0.0000 0.0000 24.000

PE Fazenda Alvorada 0.0000 0.0000 0.0000 24.000

PE Aracaju 2.280.000 0.0000 0.0000 24.000

PE FAFEN-SE 6.120.000 0.0000 0.0000 24.000

PE Carmópolis II - SERGÁS 330.000 0.0000 0.0000 24.000

PE Carmópolis II - UO-SEAL 0.0000 0.0000 0.0000 24.000

PE Catu 470.000 0.0000 0.0000 24.000

PE São Miguel dos Campos 20.000 0.0000 0.0000 24.000

PE Penedo 20.000 0.0000 0.0000 24.000

GUS SCOMP Catu 210.000 0.0000 0.0000 24.000

GUS ECOMP Catu 1.520.000 0.0000 0.0000 24.000

PE Int GASENE 0.0000 0.0000 0.0000 24.000

PE FAFEN-BA 15.610.000 0.0000 0.0000 24.000

PE UTE Chesf 18.130.000 0.0000 0.0000 24.000

PE Camaçari Residual 7.200.000 0.0000 0.0000 24.000

PE Camaçari Manati 9.300.000 0.0000 0.0000 24.000

PE Aratu Residual 2.280.000 0.0000 0.0000 24.000

PE Aratu Manati 0.0000 0.0000 0.0000 24.000

PE Cexis 0.0000 0.0000 0.0000 24.000

PE Candeias Manati 0.0000 0.0000 0.0000 24.000

PE Candeias Residual 1.770.000 0.0000 0.0000 24.000

PE UTE Termobahia - RLAM 10''

9.050.000 0.0000 0.0000 24.000

PE RLAM 6” 1.940.000 0.0000 0.0000 24.000

PE UPGN Candeias 0.0000 0.0000 0.0000 24.000

PE RLAM 14'' 7.650.000 0.0000 0.0000 24.000

PE UTE FAFEN-BA 0.0000 0.0000 0.0000 24.000

PE Dow-Química 2.870.000 0.0000 0.0000 24.000

GUS SCOMP Candeias 240.000 0.0000 0.0000 24.000

PE Int FAFEN-GAL 3.000.000 0.0000 0.0000 24.000

PE Int Pilar 37.370.000 0.0000 0.0000 24.000

Page 38: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

38 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Supply Hydraulic Summary Report : 0.000 hours

Supply Summary

Supply Name Mode of Control Pressure kg/cm2g

Flow kSm3/d

Temperature Deg C

Specific Gravity Heating Value

MJ/m3

PR UPGN Pilar MaximumFlow 80.90 -529.000 50.00 0.5945 37.36

PR Guamaré II MaximumFlow 77.54 -118.000 50.00 0.6040 38.65

PR GNL CE MaximumFlow 97.31 -3.351.000 33.00 0.5954 37.53

PR Guamaré I MaximumFlow 77.54 -682.000 50.00 0.6040 38.65

PR Atalaia I MaximumFlow 86.20 -249.000 50.00 0.6325 38.24

PR Atalaia II MaximumPressure 34.00 -300.000 33.00 0.6325 38.24

PR UPGN Santiago MaximumPressure 32.00 -371.000 33.00 0.6142 38.95

PR Int GASENE MaximumFlow 55.00 -6.809.000 33.00 0.6135 38.95

PR GNL BA MaximumFlow 50.21 -3.236.000 33.00 0.5954 37.52

PR EVF Manati MaximumFlow 36.00 -1.961.000 33.00 0.6164 36.81

PR UPGN Candeias MaximumPressure 36.00 -747.000 33.00 0.5971 36.35

PR Int Ipojuca MaximumFlow 83.57 -3.490.000 32.00 0.5945 37.36

Accumulated Volume Summary

Supply Name Current Flow Rate

kSm3/d Current Accumulated Volume

kSm3 Last Accumulated Volume

kSm3 Timer Value

hours

PR UPGN Pilar -5.290.000 0.0000 0.0000 24.000

PR Guamaré II -1.180.000 0.0000 0.0000 24.000

PR GNL CE -33.510.000 0.0000 0.0000 24.000

PR Guamaré I -6.820.000 0.0000 0.0000 24.000

PR Atalaia I -2.490.000 0.0000 0.0000 24.000

PR Atalaia II -3.000.000 0.0000 0.0000 24.000

PR UPGN Santiago -3.710.002 0.0000 0.0000 24.000

PR Int GASENE -68.090.000 0.0000 0.0000 24.000

PR GNL BA -32.360.000 0.0000 0.0000 24.000

PR EVF Manati -19.610.000 0.0000 0.0000 24.000

PR UPGN Candeias -7.469.999 0.0000 0.0000 24.000

PR Int Ipojuca -34.900.000 0.0000 0.0000 24.000

Page 39: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

39 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Delivery Hydraulic Summary Report : 0.000 hours

Delivery Summary

Delivery Name Mode of Control Pressure kg/cm2g

Flow kSm3/d

Temperature Deg C

Specific Gravity Heating Value

MJ/m3

PE Ielmo Marinho MaximumFlow 77.17 1.000 33.03 0.6040 38.65

PE Macaíba MaximumFlow 77.34 281.000 33.03 0.6007 38.10

PE Goianinha MaximumFlow 77.30 9.000 33.04 0.5982 37.68

PE Santa Rita JP MaximumFlow 77.29 161.000 32.99 0.5982 37.68

PE Igarassu MaximumFlow 78.55 48.000 32.86 0.5982 37.68

PE Igarassu II MaximumFlow 78.55 26.000 32.74 0.5982 37.68

PE Paulista MaximumFlow 78.79 76.000 32.67 0.5982 37.68

PE Recife MaximumFlow 56.28 163.000 32.07 0.5982 37.68

PE Jaboatão MaximumFlow 56.00 103.000 22.65 0.5982 37.68

PE Cabo MaximumFlow 82.05 417.000 32.06 0.5982 37.68

PE Pedras de Fogo MaximumFlow 77.42 143.000 32.89 0.5982 37.68

PE Mamanguape MaximumFlow 76.88 7.000 32.98 0.5982 37.68

PE UTE Pernambuco MaximumFlow 82.93 1.441.000 32.36 0.5982 37.68

PE Rio Largo MaximumFlow 89.69 103.000 36.71 0.6115 38.77

PE Santa Rita CG MaximumFlow 77.29 56.000 32.99 0.5982 37.68

PE RNEST MaximumFlow 83.06 1.434.000 32.14 0.5982 37.68

PE Goiania II MaximumFlow 77.68 231.000 32.82 0.5982 37.68

PE Pecém MaximumFlow 97.29 6.000 33.00 0.5954 37.53

PE UTE Termoceará MaximumFlow 97.31 972.000 33.00 0.5954 37.53

PE Caucaia MaximumFlow 94.76 9.000 32.39 0.5954 37.53

PE Fortaleza MaximumFlow 90.62 362.000 31.97 0.5954 37.53

PE Pacajus MaximumFlow 86.84 40.000 32.31 0.5954 37.53

PE Aracati MaximumFlow 38.99 9.000 33.00 0.5954 37.53

PE Fazenda Belém MaximumFlow 78.38 0.000 32.72 0.5954 37.53

PE Mossoró MaximumFlow 76.56 72.000 32.82 0.5954 37.53

PE UTE Termofortaleza MaximumFlow 97.08 1.045.000 32.93 0.5954 37.53

PE UTE Termoaçu MaximumFlow 73.73 1.474.000 32.91 0.5994 38.05

PE UTE José de Alencar MaximumFlow 97.29 0.000 33.00 0.5954 37.53

PE Aquiraz MaximumFlow 88.91 40.000 32.11 0.5954 37.53

PE Marechal Deodoro MaximumFlow 80.90 0.000 50.00 0.5945 37.36

GUS SCOMP Pilar MaximumFlow 80.88 62.000 34.41 0.6115 38.77

GUS SCOMP Aracati MaximumFlow 80.20 0.000 32.55 0.5954 37.53

GUS SCOMP Macaíba MaximumFlow 77.34 0.000 33.05 0.5982 37.68

GUS SCOMP Santa Rita MaximumFlow 77.29 0.000 32.99 0.5982 37.68

PE Itaporanga MaximumFlow 85.86 23.000 33.04 0.6136 38.95

PE Socorro MaximumFlow 25.51 134.000 29.84 0.6136 38.95

PE Manguinhos MaximumFlow 25.49 67.000 32.36 0.6136 38.95

Page 40: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

40 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Delivery Name Mode of Control Pressure kg/cm2g

Flow kSm3/d

Temperature Deg C

Specific Gravity Heating Value

MJ/m3

PE Estância MaximumFlow 86.60 60.000 33.45 0.6135 38.95

PE Araças MaximumFlow 89.23 0.000 41.23 0.6135 38.95

PE Águas Claras MaximumFlow 86.28 30.000 33.26 0.6135 38.95

PE Fazenda Bálsamo MaximumFlow 88.66 0.000 36.63 0.6135 38.95

PE Fazenda Alvorada MaximumFlow 88.29 0.000 35.78 0.6135 38.95

PE Aracaju MaximumFlow 86.20 228.000 50.00 0.6325 38.24

PE FAFEN-SE MaximumFlow 83.47 612.000 32.63 0.6136 38.95

PE Carmópolis II - SERGÁS MaximumFlow 84.69 33.000 33.00 0.6136 38.95

PE Carmópolis II - UO-SEAL MaximumFlow 84.69 0.000 33.00 0.6136 38.95

PE Catu MaximumFlow 32.00 47.000 33.00 0.6142 38.95

PE São Miguel dos Campos MaximumFlow 82.20 2.000 33.31 0.6136 38.95

PE Penedo MaximumFlow 83.13 2.000 32.92 0.6136 38.95

GUS SCOMP Catu MaximumFlow 32.00 21.000 33.00 0.6142 38.95

GUS ECOMP Catu MaximumFlow 55.00 152.000 33.73 0.6135 38.95

PE Int GASENE MaximumFlow 55.00 0.000 33.73 0.6135 38.95

PE FAFEN-BA MaximumFlow 42.64 1.561.000 32.22 0.6026 37.93

PE UTE Chesf MaximumFlow 42.64 1.813.000 32.22 0.6026 37.93

PE Camaçari Residual MaximumFlow 42.64 720.000 32.22 0.6026 37.93

PE Camaçari Manati MaximumFlow 42.64 930.000 32.22 0.6026 37.93

PE Aratu Residual MaximumFlow 35.94 228.000 33.02 0.6110 36.68

PE Aratu Manati MaximumFlow 35.94 0.000 33.02 0.6110 36.68

PE Cexis MaximumFlow 48.41 0.000 33.49 0.5972 37.43

PE Candeias Manati MaximumFlow 36.00 0.000 33.00 0.6110 36.68

PE Candeias Residual MaximumFlow 36.00 177.000 33.00 0.6110 36.68

PE UTE Termobahia - RLAM 10'' MaximumFlow 36.00 905.000 33.00 0.6110 36.68

PE RLAM 6” MaximumFlow 36.00 194.000 33.00 0.6110 36.68

PE UPGN Candeias MaximumFlow 36.00 0.000 33.00 0.6110 36.68

PE RLAM 14'' MaximumFlow 36.00 765.000 33.00 0.6110 36.68

PE UTE FAFEN-BA MaximumFlow 42.64 0.000 32.22 0.6026 37.93

PE Dow-Química MaximumFlow 47.16 287.000 33.04 0.5972 37.43

GUS SCOMP Candeias MaximumFlow 36.00 24.000 33.00 0.6110 36.68

PE Int FAFEN-GAL MaximumFlow 34.00 300.000 33.00 0.6325 38.24

PE Int Pilar MaximumFlow 91.00 3.737.000 44.37 0.6115 38.77

Accumulated Volume Summary

Delivery Name Current Flow

Rate kSm3/d

Current Accumulated Volume kSm3

Last Accumulated Volume kSm3

Timer Value hours

PE Ielmo Marinho 10.000 0.0000 0.0000 24.000

PE Macaíba 2.810.000 0.0000 0.0000 24.000

PE Goianinha 90.000 0.0000 0.0000 24.000

PE Santa Rita JP 1.610.000 0.0000 0.0000 24.000

Page 41: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

41 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Delivery Name Current Flow

Rate kSm3/d

Current Accumulated Volume kSm3

Last Accumulated Volume kSm3

Timer Value hours

PE Igarassu 480.000 0.0000 0.0000 24.000

PE Igarassu II 260.000 0.0000 0.0000 24.000

PE Paulista 760.000 0.0000 0.0000 24.000

PE Recife 1.630.000 0.0000 0.0000 24.000

PE Jaboatão 1.030.000 0.0000 0.0000 24.000

PE Cabo 4.170.000 0.0000 0.0000 24.000

PE Pedras de Fogo 1.430.000 0.0000 0.0000 24.000

PE Mamanguape 70.000 0.0000 0.0000 24.000

PE UTE Pernambuco 14.410.000 0.0000 0.0000 24.000

PE Rio Largo 1.030.000 0.0000 0.0000 24.000

PE Santa Rita CG 560.000 0.0000 0.0000 24.000

PE RNEST 14.340.000 0.0000 0.0000 24.000

PE Goiania II 2.310.000 0.0000 0.0000 24.000

PE Pecém 60.000 0.0000 0.0000 24.000

PE UTE Termoceará 9.720.000 0.0000 0.0000 24.000

PE Caucaia 90.000 0.0000 0.0000 24.000

PE Fortaleza 3.620.000 0.0000 0.0000 24.000

PE Pacajus 400.000 0.0000 0.0000 24.000

PE Aracati 90.000 0.0000 0.0000 24.000

PE Fazenda Belém 0.0000 0.0000 0.0000 24.000

PE Mossoró 720.000 0.0000 0.0000 24.000

PE UTE Termofortaleza 10.450.000 0.0000 0.0000 24.000

PE UTE Termoaçu 14.740.000 0.0000 0.0000 24.000

PE UTE José de Alencar 0.0000 0.0000 0.0000 24.000

PE Aquiraz 400.000 0.0000 0.0000 24.000

PE Marechal Deodoro 0.0000 0.0000 0.0000 24.000

GUS SCOMP Pilar 620.000 0.0000 0.0000 24.000

GUS SCOMP Aracati 0.0000 0.0000 0.0000 24.000

GUS SCOMP Macaíba 0.0000 0.0000 0.0000 24.000

GUS SCOMP Santa Rita 0.0000 0.0000 0.0000 24.000

PE Itaporanga 230.000 0.0000 0.0000 24.000

PE Socorro 1.340.000 0.0000 0.0000 24.000

PE Manguinhos 670.000 0.0000 0.0000 24.000

PE Estância 600.000 0.0000 0.0000 24.000

PE Araças 0.0000 0.0000 0.0000 24.000

PE Águas Claras 300.000 0.0000 0.0000 24.000

PE Fazenda Bálsamo 0.0000 0.0000 0.0000 24.000

PE Fazenda Alvorada 0.0000 0.0000 0.0000 24.000

PE Aracaju 2.280.000 0.0000 0.0000 24.000

PE FAFEN-SE 6.120.000 0.0000 0.0000 24.000

Page 42: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

42 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Delivery Name Current Flow

Rate kSm3/d

Current Accumulated Volume kSm3

Last Accumulated Volume kSm3

Timer Value hours

PE Carmópolis II - SERGÁS 330.000 0.0000 0.0000 24.000

PE Carmópolis II - UO-SEAL 0.0000 0.0000 0.0000 24.000

PE Catu 470.000 0.0000 0.0000 24.000

PE São Miguel dos Campos 20.000 0.0000 0.0000 24.000

PE Penedo 20.000 0.0000 0.0000 24.000

GUS SCOMP Catu 210.000 0.0000 0.0000 24.000

GUS ECOMP Catu 1.520.000 0.0000 0.0000 24.000

PE Int GASENE 0.0000 0.0000 0.0000 24.000

PE FAFEN-BA 15.610.000 0.0000 0.0000 24.000

PE UTE Chesf 18.130.000 0.0000 0.0000 24.000

PE Camaçari Residual 7.200.000 0.0000 0.0000 24.000

PE Camaçari Manati 9.300.000 0.0000 0.0000 24.000

PE Aratu Residual 2.280.000 0.0000 0.0000 24.000

PE Aratu Manati 0.0000 0.0000 0.0000 24.000

PE Cexis 0.0000 0.0000 0.0000 24.000

PE Candeias Manati 0.0000 0.0000 0.0000 24.000

PE Candeias Residual 1.770.000 0.0000 0.0000 24.000

PE UTE Termobahia - RLAM 10''

9.050.000 0.0000 0.0000 24.000

PE RLAM 6” 1.940.000 0.0000 0.0000 24.000

PE UPGN Candeias 0.0000 0.0000 0.0000 24.000

PE RLAM 14'' 7.650.000 0.0000 0.0000 24.000

PE UTE FAFEN-BA 0.0000 0.0000 0.0000 24.000

PE Dow-Química 2.870.000 0.0000 0.0000 24.000

GUS SCOMP Candeias 240.000 0.0000 0.0000 24.000

PE Int FAFEN-GAL 3.000.000 0.0000 0.0000 24.000

PE Int Pilar 37.370.000 0.0000 0.0000 24.000

Pressure/Flow Violation Reports : 0.000 hours

Xreg Pressure/Flow Violation

Xreg Name Node Name Pressure Flow Mode Violation Status

kg/cm2g kSm3/d

ALL XREGS FALL WITHIN PRESSURE BOUNDS

Equipment Pressure/Flow Violation

Equipment Name Up Node Name Down Node Name Up Pressure Down Pressure Flow Mode Violation Status

kg/cm2g kg/cm2g kSm3/d

ALL EQUIPMENTS FALL WITHIN PRESSURE BOUNDS

Page 43: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

43 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Pipe Pressure/Flow Violation

Pipe Name Up Node Name Down Node Name Distance From Head Pressure Flow Velocity Violation Status

km kg/cm2g kSm3/d kSm3/d

ALL INTERNAL KNOTS FALL WITHIN PRESSURE BOUNDS

Equipment Setpoint/Constraint Violation

Equipment Name Mode Setpoint Value Computed Value Mode Lock Status

SCOMP Santa Rita MaximumDownstreamPressure 70.00 77.29 LOCKED

SCOMP Catu Max Discharge Temp 50.00 78.85 LOCKED

ECOMP Catu Max Discharge Temp 50.00 75.82 LOCKED

SCOMP Candeias MaximumDownstreamPressure 50.00 50.21 LOCKED

SCOMP Candeias Max Discharge Temp 45.00 61.00 LOCKED

Device Locked Modes

Type Name Mode

XREG PR UPGN Pilar MaximumFlow

XREG PR Guamaré II MaximumFlow

XREG PR GNL CE MaximumFlow

XREG PR Guamaré I MaximumFlow

XREG PR Atalaia I MaximumFlow

XREG PR Atalaia II MaximumPressure

XREG PR UPGN Santiago MaximumPressure

XREG PR Int GASENE MaximumFlow

XREG PR GNL BA MaximumFlow

XREG PR EVF Manati MaximumFlow

XREG PR UPGN Candeias MaximumPressure

XREG PR Int Ipojuca MaximumFlow

XREG PE Ielmo Marinho MaximumFlow

XREG PE Macaíba MaximumFlow

XREG PE Goianinha MaximumFlow

XREG PE Santa Rita JP MaximumFlow

XREG PE Igarassu MaximumFlow

XREG PE Igarassu II MaximumFlow

XREG PE Paulista MaximumFlow

XREG PE Recife MaximumFlow

XREG PE Jaboatão MaximumFlow

XREG PE Cabo MaximumFlow

XREG PE Pedras de Fogo MaximumFlow

XREG PE Mamanguape MaximumFlow

XREG PE UTE Pernambuco MaximumFlow

XREG PE Rio Largo MaximumFlow

XREG PE Santa Rita CG MaximumFlow

XREG PE RNEST MaximumFlow

Page 44: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

44 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Type Name Mode

XREG PE Goiania II MaximumFlow

XREG PE Pecém MaximumFlow

XREG PE UTE Termoceará MaximumFlow

XREG PE Caucaia MaximumFlow

XREG PE Fortaleza MaximumFlow

XREG PE Pacajus MaximumFlow

XREG PE Aracati MaximumFlow

XREG PE Fazenda Belém MaximumFlow

XREG PE Mossoró MaximumFlow

XREG PE UTE Termofortaleza MaximumFlow

XREG PE UTE Termoaçu MaximumFlow

XREG PE UTE José de Alencar MaximumFlow

XREG PE Aquiraz MaximumFlow

XREG PE Marechal Deodoro MaximumFlow

XREG GUS SCOMP Pilar MaximumFlow

XREG GUS SCOMP Aracati MaximumFlow

XREG GUS SCOMP Macaíba MaximumFlow

XREG GUS SCOMP Santa Rita MaximumFlow

XREG PE Itaporanga MaximumFlow

XREG PE Socorro MaximumFlow

XREG PE Manguinhos MaximumFlow

XREG PE Estância MaximumFlow

XREG PE Araças MaximumFlow

XREG PE Águas Claras MaximumFlow

XREG PE Fazenda Bálsamo MaximumFlow

XREG PE Fazenda Alvorada MaximumFlow

XREG PE Aracaju MaximumFlow

XREG PE FAFEN-SE MaximumFlow

XREG PE Carmópolis II - SERGÁS MaximumFlow

XREG PE Carmópolis II - UO-SEAL MaximumFlow

XREG PE Catu MaximumFlow

XREG PE São Miguel dos Campos MaximumFlow

XREG PE Penedo MaximumFlow

XREG GUS SCOMP Catu MaximumFlow

XREG GUS ECOMP Catu MaximumFlow

XREG PE Int GASENE MaximumFlow

XREG PE FAFEN-BA MaximumFlow

XREG PE UTE Chesf MaximumFlow

XREG PE Camaçari Residual MaximumFlow

XREG PE Camaçari Manati MaximumFlow

XREG PE Aratu Residual MaximumFlow

XREG PE Aratu Manati MaximumFlow

XREG PE Cexis MaximumFlow

Page 45: Í N D I C E D E R E V I S Õ E S R E V . D E S C R I Ç Ã O ... · O sistema de transporte referente ao Segundo Contrato de Transporte de Gás da Malha Nordeste, compreende diversos

RELATÓRIO Nº

RL-9550.00-6521-940-PR2-001 REV.

0

FOLHA

45 de 45 TÍTULO:

RELATÓRIO DE SIMULAÇÃO TERMO-HIDRÁULICA DA MALHA NORDESTE

NP-1

Type Name Mode

XREG PE Candeias Manati MaximumFlow

XREG PE Candeias Residual MaximumFlow

XREG PE UTE Termobahia - RLAM 10'' MaximumFlow

XREG PE RLAM 6” MaximumFlow

XREG PE UPGN Candeias MaximumFlow

XREG PE RLAM 14'' MaximumFlow

XREG PE UTE FAFEN-BA MaximumFlow

XREG PE Dow-Química MaximumFlow

XREG GUS SCOMP Candeias MaximumFlow

XREG PE Int FAFEN-GAL MaximumFlow

XREG PE Int Pilar MaximumFlow

EQUIP ERP Jaboatão MaximumDownstreamPressure

EQUIP ERP Recife Closed

EQUIP PE FAFEN-Sergás MaximumDownstreamPressure

EQUIP Regu0048 MaximumDownstreamPressure

EQUIP SCOMP Santa Rita Bypass

EQUIP SCOMP Pilar II MaximumDownstreamPressure

EQUIP SCOMP Aracati Bypass

EQUIP SCOMP Catu MaximumDownstreamPressure

EQUIP ECOMP Catu MaximumDownstreamPressure

EQUIP SCOMP Candeias MaximumFlow