FACHADA - bia.arq.br fileh=15 L129 L126 h=15 L133-110 h=15-30 L135 h=21 L140 h=15 35 L120 L111 h=17...

Post on 29-Oct-2019

1 views 0 download

Transcript of FACHADA - bia.arq.br fileh=15 L129 L126 h=15 L133-110 h=15-30 L135 h=21 L140 h=15 35 L120 L111 h=17...

h=15L126L129

h=15L133

-110

h=15

-30

L135h=21

L140h=15

35

L111L120h=17h=17

L115h=17

L106h=17

L118h=17 h=17

L107

L130h=21

L131

L132

h=21

h=17

L128h=21

L127h=21

h=17L136

L138h=17

L137h=17

L112h=17h=17

L121

L122h=17

L124h=17

h=17L125

h=17L116 L105

h=17

L139h=17

L134h=17

L109h=17

L117h=17

L119h=17

L110h=17

L101

L123

h=17

h=17

L104h=17

L102h=17

L113h=17

L108h=17

L114h=17

L103h=17

P1419/40

P919/60

19/50P3P36

19/60

P3719/4014/40 (sup)

P3319/4014/40 (sup)

P2919/4014/40 (sup)

P3219/4014/40 (sup)

P3019/4014/40 (sup)

PF1Ø30

P3819/4014/40 (sup)

P3419/4014/40 (sup)

P3119/4014/40 (sup)

P1014/40

P1519/4014/40 (sup)

P4115/53

P113Ø30

P2819/6014/60 (sup)

P3919/4014/40 (sup)

P2719/4014/40 (sup)P40

15/5315/40 (sup)

P4220/270

35

-110

P3519/6014/60 (sup)

19/40

19/40

19/56

19/6019/40

19/56

17/40

17/40

17/40

17/60

17/40

17/60

17/40

17/40

17/40

17/50

17/40

17/60

19/50

19/40

15/40

17/60

15/40

17/40

17/50

17/40

19/45

15/45

19/40

19/45

17/40

19/45

19/40

17/40

17/40

19/40

17/40

17/40

V120a

V115ab

V113a

b

b

b c

c d ef

g

V123a

b

V111a

b

V128a

V127a

V112a

bc

bd

ef

g

V118a bc

V119ab

V103a

bc

d

V130a

V125ab

c

V129a

V132a

V114a

de

f

g

V108a

b

V107a

bc

V109a

V124a b

V122ab c

V110a

b

V116a

cd

c

c d

V133ab

c

d

cd

e

aV101b

aV102c

aV104b

a

V105b

ba

V106c

ELEV.=35

aV121b

ELEV.=35

a

V126b

a V131b

PO: -0,05

PA: 0,00

9

P110 P103

V310

V306

P106

P106P110 P103

P9P14

V207

V208

V204V205

V203

V209

V215V215

P5

P106P110

P103

P9

P14

V101V105

V110V107

V108

V106

V125

V103

V102

V112V111

V123

B29

CT11CT11

CT1

V16

V12V12

V12V12

V12

V3V1V6

-2.750

-2.050

-0.050

3.010

4.330

5.130

6.16

0.30

2.76

3.46

ÁREA DE

(ver detalhe)

DEPÓSITO

(ver detalhe)

(ver detalhe)

HALL

DEPÓSITO

(ver detalhe)

(ver detalhe)

01SOBE

projeção depatamar superior

HALL EXTERNO

proj

eção

do

1° p

avim

ento

projeção do 1° pavimento

proj

eção

do

1° p

avim

ento

ESCADA 01

proj

eção

do

1° p

avim

ento

guar

da-

corp

o h

=110

/ co

rrim

ão h

=92c

m

(ver detalhe)

projeção do 1° pavimento projeção do 1° pavimento

SALA DE ESTAR

proj

eção

de

mar

quise

proj

eção

do

1° p

avim

ento

projeção de marquise

projeção de trilho superior (esquadrias)

seca piso

bord

a pr

ainh

a

DECK

projeção de marquise

seca piso

mur

eta

h=92

cm

(ver

det

alhe

)

borda prainha

mur

eta

h=92

cm

mur

eta

h=75

cm

I= 1%

mur

eta

h=75

cm

(ver detalhe)

borda prainha

(ver detalhe)(ver detalhe)

bord

a pr

ainh

a

(ver detalhe)

02

AP 00

01

AP 00

05

AP 00

06

AP 00

PM04

PM02

PE01

PM05

PV01

PM02

PM01

PV01

PM02

01

AC

ESSO

DE

VEÍ

CUL

OS

AC

ESSO

DE

PED

ESTR

ES (S

OC

IAL)

AC

ESSO

DE

PED

ESTR

ES (S

ERV

IÇO

)

LIMITE DO TERRENO

LIM

ITE D

O T

ERRE

NO

LIMITE DO TERRENO

LIM

ITE D

O T

ERRE

NO JARDIM

JARDIM

JARDIM

JARDIM

JARDIM

JARDIM

PA: -1.80patamar

talude

talude

seca piso

proj

eção

de

esqu

adria

(1° p

avim

ento

)

forno de pizza

02

06

churrasqueira

03

05

07 0804PA: -1,283

PO: -1,283

PA: 0,00PO: -0,05

12

13

15

SALA DE JANTAR

SERVIÇO

03

AP 00

04

AP 00

07

AP 00

08

AP 00

VARANDA DE SERVIÇO

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

CA

LÇA

DA

EM

DEC

LIV

E

INC

LIN

ÃO

2.5

%

mei

o fio

h=2

0cm

PLANTA BAIXA: Pavimento Terreoescala 1:50

RAMPA DE VEÍCULOS

BANHO 01CIRCULAÇÃO SUITE 01

01

03

05

07

09

11

13

15

17

02

04

06

08

10

12

14

16

18

VARANDADEPÓSITOÁREA DE SERVIÇOCOZINHA

forro forro forro

forro

LAVABO JARDIIM

limite

do

terre

no

limite

do

terre

no

projeção da rampa de veículos

JARDIM

PAVIMENTO TÉRREO

PA: 0,00PO: -0,05

1° PAVIMENTO

PA: +3,06PO: +3,01

platibanda h=20cm

forro

CIRCULAÇÃO

forro forro forro

platibanda h=37cm

I=21%

TELHADO

PA: +5,98PO: +5,91

COBERTURA

PA: +3,51PO: +3,46

PA: -1,00PO: -1,00

CALÇADAlimite esquerdo do terrenoPA: -1,80

PO: -1,85CALÇADAlimite direito do terreno

SEMI-ENTERRADO

PA: -2,70PO: -2,75

muro lateral direita da rampa

limite natural do terreno (lateral direita)

limite natural do terreno (lateral esquerda)PO: -2,00PA: -2,00

FUNDO DO LOTElimite esquerdo do terreno

PA: -2,40

PA: 0,00

PAVIMENTO TÉRREO

PO: -2,40

PO: -0,05

limite direito do terrenoFUNDO DO LOTE

hidrômetro

muro lateral esquerda da rampa

calçada

CORTE 04escala 1:50

árvore existente a manter

árvore existente a manter

viga

árvore existente a manter

viga

viga

PA: +3,88

Mesa

Chaise

Sofá 100x260cmM

esaM

esa

PO: +3,86

PA: 0,00 PA: 0,00PO: -0,05

PA: 0,00

PO: -0,05

PO: -0,05

PA: 0,00PO: -0,05

PA: 0,00PO: -0,05

PA: 0,00PO: -0,05

PA: 0,00PO: -0,05

PA: 0,00

PA: 0,00PO: -0,05

PA: 0,00

PO: -0,05

PA: 0,00PO: -0,05PO: -0,05

PA: 0,00PO: -0,05

PA: 0,00PO: -0,05

PA: -1,13PO: -1,15

PA: -0,50PO: -0,52

PA: -1,00PO: -1,02

PA: -0,33PO: -0,35

6.01 .15 .77 .15 12.82 1.00 1.17 .19 5.75 .19 11.71 .10

7.08 14.98 6.13 11.81

40.00

6.01 1.07 1.29 .41 2.98 6.00 .20 .40 1.00 .40 .40 .75 1.17 .24 1.14 3.38 1.13 .24 .79

1.29 11.78 1.91 6.13 .79

7.08 14.98 6.92 11.031.50

7.08 1.44 1.88 11.45 .17 1.14 .69 .17 .40 1.16 1.40 .17 .82.25

8.52 2.13 11.45 6.06 11.85

8.50 .25 1.48 .17 10.48 1.20 .172.42

.17 1.56 .17 1.40 .17

1.26 .80 .80 .80 .80 .80 .80 2.46 .25 1.48 .17 11.68 .17 .60 1.12 .70 .17 .60 .96 .17 1.40 .17

.172.62.162.506.06 .17 .19 2.20 1.12 .17 1.22 1.05 .17 1.40 .17 .82

8.55 2.94 9.18 3.32 2.43

8.55 1.43 12.13 6.86 11.03

40.00

.10

19.8

0.1

0

20.0

0

2.13

.89

1.83

6.59

.17

.76

5.01

1.70

4.84

6.59

6.87

1.70

.84

.10

2.13

.19

.66

.14

.70

1.02

6.59

.22

1.64

.17

3.20

.17

1.30

.17

1.701.70

.17

1.30

.17

.10

.86

2.24

.17

1.61

.26

8.30

1.01

2.13

.10

.20

.17

.10

.86

.35

.17

4.91

.32

8.30

1.01

2.13

1.29

.45

6.83

.19

6.23

.10

.40

2.50

.40

1.11

.40

.10

1.29

.56

1.15

1.60

.17

1.00

.17

1.63

1.01

.25

6.18

.10

3.30

1.61

.20

.91

.42

.20

1.92

4.06

.15

.71

.15

11.0

9.1

0.1

0

1.63

.62

1.50

4.06

12.2

0

2.72

1.50

3.21

9.07

3.50

20.0

0

97°

80°

2.54

.32

.20

2.70

.22

2.50

2.55

2.63

.13

.58

2.30

1.74

2.42

.80

.60

.25

.44

.21

.21

.59

1.02

2.67

2.75

.92

1.64

.20

1.12

05

AP 00

01

AP 00

02

AP 00

03

AP 00

06

AP 00

04

AP 00

08

AP 00

07

AP 00

FAC

HAD

A

FAC

HAD

A

FACHADA

FACHADA

PA01

vaziovazio

vazio

JA02

JA01

JA03

proj

eção

de

pila

r

SALA DE ESTAR SALA DE JANTAR

01 01 02 01 01 02

01 01 02

01 01 02

LAVABO

ESCADA 02

COZINHA

(ver detalhe)

02 03 02

02 03 02

03 01 02

03 04 02

04 00 00

04 00 00

04 00 00

VARANDA GOURMET

BH.SERVIÇO LAVABO

05 05 00

PISCINA SPA

05 05 0005 05 00

DECK MOLHADO

(ver detalhe)DUCHA

06 06 0207

JARD

INEI

RA

07 00 0007 00 00

ACESSO DE SERVIÇO

1.69 8.98 .22 1.77 2.32

.60 .17

1.57 .17

.47.17.47.17.47.17.47.17.47.17.47.17.47.18.47.17.47.17.47.17.47.17.47.17.47.17.49

câmera

câmera

câmera

câmera

sensor de alarme

câmera

câmera sensor de alarme

câmeracentral de comando

sensor de alarme

central de comando

sensor de alarme

sensor de alarme

QUADRO DE CFTV

câmera

câmera suspensa no teto

câmera

câmera

câmera

GARAGEM/ DEPÓSITO

PLATIBANDA

PA: +6,18PO: +6,16

3.51

2.54

.26

2.442.

70

fossa séptica

5.06

centrosumidouro

2.49

centro leito de secagem

muretah=50cm

nicho para inspeção de drenagem

grelha para captação de água pluvial (AP)

caixa sanitária

caixa sanitária caixa sanitária

caixa sanitária

caixa sanitária

caixa sanitária

caixa sanitáriacaixa sanitária

hidrômetro(entrada CAESB)

torneira de jardim

torneira de jardim

torneira de jardim

torneira de jardim

torneira de jardim

.90

.50

PA04

08 01

INSTALAÇÕES

elétrica(entrada CEB)

entrada CEB

01 02 03 04 05 06 07 08 09 10 11

SOBE

ESCADA 03(ver detalhe)

área de talude (seguir inclinação da escada)

.29

01

05

09

11

13

15

04

06

08

10

12

14

16

02

.64

.42

DIREITOS AUTORAIS RESERVADOS

FOLHADESENHO

ARQUIVO

ESCALA

1016_EX_01_R00_Terreo_C04.dwg

CONTEÚDO

TIPO DE PROJETO

FASE DE PROJETO

ENDEREÇO

PROPRIETARIO

RESP. TECNICO

AUTOR

PROJETO DE ARQUITETURA

BEATRIZ TEIXEIRA SOUZA

DESCRIÇÃO 01DESCRIÇÃO 02DESCRIÇÃO 03

RUA DAS AMORAS, NÚMERO 1000

EMISSÃO INICIAL00

EXECUTIVO

FULANO DE TAL

CAU.A77463-4/DF

0701/INDICADABEATRIZ

01/01/2000

AutoCAD SHX Text
01
AutoCAD SHX Text
PR05
AutoCAD SHX Text
03
AutoCAD SHX Text
PR05
AutoCAD SHX Text
02
AutoCAD SHX Text
PR05
AutoCAD SHX Text
04
AutoCAD SHX Text
PR05
AutoCAD SHX Text
LEGENDA:
AutoCAD SHX Text
Início de Paginação de Revestimentos
AutoCAD SHX Text
- Parede
AutoCAD SHX Text
- Piso
AutoCAD SHX Text
ALVENARIAS/ FECHAMENTOS:
AutoCAD SHX Text
alvenaria com bloco cerâmico de 19 cm
AutoCAD SHX Text
placa cimentícia (moldada 'in loco')
AutoCAD SHX Text
alvenaria com bloco cerâmico de 14 cm
AutoCAD SHX Text
3,0 cm para granito e mármore revestimento interno
AutoCAD SHX Text
OBSERVAÇÕES:
AutoCAD SHX Text
1,5 cm para pintura; 1,5 cm para cerâmica;
AutoCAD SHX Text
- Para os revestimentos foram considerados :
AutoCAD SHX Text
- Todas as medidas deverão ser verificadas no local.
AutoCAD SHX Text
- P.A. = Piso Acabado
AutoCAD SHX Text
- P.O. = Piso Osso
AutoCAD SHX Text
- Medidas em centímetros.
AutoCAD SHX Text
- Níveis em metros.
AutoCAD SHX Text
tijolinho 8 cm
AutoCAD SHX Text
- Teto
AutoCAD SHX Text
alvenaria com bloco cerâmico de 11,5 cm
AutoCAD SHX Text
dry-wall de 7 cm
AutoCAD SHX Text
tijolo refratário 9 cm
AutoCAD SHX Text
concreto
AutoCAD SHX Text
ESTRUTURA:
AutoCAD SHX Text
estrutura superior
AutoCAD SHX Text
estrutura inferior
AutoCAD SHX Text
pilar
AutoCAD SHX Text
TABELA DE ACABAMENTOS
AutoCAD SHX Text
PISO
AutoCAD SHX Text
01
AutoCAD SHX Text
Madeira
AutoCAD SHX Text
02
AutoCAD SHX Text
Porcelanato
AutoCAD SHX Text
03
AutoCAD SHX Text
Cerâmica
AutoCAD SHX Text
04
AutoCAD SHX Text
Fulget
AutoCAD SHX Text
05
AutoCAD SHX Text
Pastilha
AutoCAD SHX Text
06
AutoCAD SHX Text
Concreto desempenado
AutoCAD SHX Text
07
AutoCAD SHX Text
Intertravado
AutoCAD SHX Text
PAREDE
AutoCAD SHX Text
01
AutoCAD SHX Text
Pintura acrílica semi-fosca
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
Porcelanato
AutoCAD SHX Text
04
AutoCAD SHX Text
Cerâmica
AutoCAD SHX Text
05
AutoCAD SHX Text
Pastilha
AutoCAD SHX Text
06
AutoCAD SHX Text
Concreto desempenado
AutoCAD SHX Text
Tijolinho
AutoCAD SHX Text
TETO
AutoCAD SHX Text
01
AutoCAD SHX Text
Pintura acrílica fosca
AutoCAD SHX Text
02
AutoCAD SHX Text
Concreto desempenado (cimentado)
AutoCAD SHX Text
08
AutoCAD SHX Text
Cimentado