1. ADICIONALES

Post on 15-Jul-2016

271 views 0 download

description

adicionales de obra

Transcript of 1. ADICIONALES

ADICIONALES

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ADICIONALES

Fecha: 03/03/2016

PRESUPUESTO: RESUMEN

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM DESCRIPCION UND

1.00 ADICIONALES

1.01 RAMPA UND

1.02 REFUERZO DE VIGA DE FACHADA UND 1.03 BAÑO 1ER PISO UND 1.04 DRYWALL UND

1.05 BARANDA 5 PISO UND

1.06 PUERTA MELAMINE VIDRIOS UND

1.07 ENCHAPES UND

1.08 PINTURA UND

1.09 ESCALERA DE GATO Y ESCOTILLA UND

1.10 IIEE UND

1.11 CLARABOYA UND

1.12 GRANITO UND

3.01.03

PRESUPUESTO: RESUMEN

Fecha: 03/03/2016

METRADO PARCIAL

1.00 S/. 5,209.65

1.00 S/. 5,562.50

1.00 S/. 5,167.50

1.00 S/. 43,932.00

1.00 S/. 375.00

1.00 S/. 8,835.00

1.00 S/. 9,790.88

1.00 S/. 6,771.75

1.00 S/. 1,320.00

1.00 S/. 17,650.00

1.00 S/. 30,025.96

1.00 S/. 2,090.00

COSTO DIRECTO S/. 136,730.24

UTILIDADES 10,254.77

SUB TOTAL S/. 146,985.00

IGV 18% 26,457.30

TOTAL S/. 173,442.30

PRESUPUESTO: ADICIONAL RAMPA 1 PISO

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM DESCRIPCION UND

ESTRUCTURA (ADICIONAL)

1.00 MOVIMIENTO DE TIERRAS

1.01 GLB

2.00 OBRAS PRELIMINARES 2.01 DEMOLICION DE CONCRETO SIMPLE GLB

2.02 DEMOLICION CONCRETO ARMADO (CIMIENTOS) GLB

3.00 OBRAS DE CONCRETO ARMADO

3.01 RAMPA DISCAPACITADOS 1 PISO

3.01.03 ENCOFRADO Y DESENCOFRADO DE RAMPA FONDO M2

3.01.04 ACERO FY=4200 KG/CM2 KG

4.00 VARIOS 4.01 TARRAJEO DE BORDES DE RAMPA ML

4.02 BARANDA ML

4.03 BRUÑADO DE RAMPA ML

4.04 CORTE DE PISO ML

4.05 ENCHAPE CERAMICO ESCALERA MAS ZOCALO GLB

4.06 CANTONERA ML

ELIMINACION DE MATERIAL EXCEDENTE PROCEDENTE DE LAS EXCAVACIONES

PRESUPUESTO: ADICIONAL RAMPA 1 PISO

Fecha: 03/03/2016

METRADO P.U. PARCIAL

1.00 S/. 220.00 S/. 220.00

1.00 S/. 300.00 S/. 300.00

1.00 S/. 450.00 S/. 450.00

3.00 S/. 95.00 S/. 285.00

50.00 S/. 6.50 S/. 325.00

8.00 S/. 25.00 S/. 200.00

9.50 S/. 250.00 S/. 2,375.00

37.00 S/. 8.00 S/. 296.00

10.70 S/. 7.00 S/. 74.90

1.00 S/. 500.00 S/. 500.00

7.35 S/. 25.00 S/. 183.75

COSTO DIRECTO S/. 5,209.65

UTILIDADES 7.50% 390.72

SUB TOTAL S/. 5,600.37

IGV 18% 1,008.07

TOTAL S/. 6,608.44

PRESUPUESTO: REFUERZO VIGA FACHADA

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM DESCRIPCION UND

ESTRUCTURA (METALICA)

1.00 COLUMNA DE ACERO

1.01 COLUMNA DE ACERO 4"X4" KG

2.00 VIGAS DE ACERO

2.01 VIGAS DE ACERO 4"X4" KG

PRESUPUESTO: REFUERZO VIGA FACHADA

Fecha: 03/03/2016

METRADO P.U. PARCIAL

130.00 S/. 12.50 S/. 1,625.00

315.00 S/. 12.50 S/. 3,937.50

COSTO DIRECTO S/. 5,562.50

UTILIDADES (7.5%) 417.19

SUB TOTAL S/. 5,979.69

IGV 18% 1,076.34

TOTAL S/. 7,056.03

PRESUPUESTO: ADICIONAL BAÑO 1 PISO

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM DESCRIPCION UND

ESTRUCTURA (ADICIONAL)

1.00 MOVIMIENTO DE TIERRAS

1.01 EXCAVACION MANUAL GLB

1.02 GLB

2.00 OBRAS PRELIMINARES

2.01 DEMOLICION DE CONCRETO SIMPLE (PISO) M2

2.02 DEMOLICION CONCRETO ARMADO (PASE EN PLACA) GLB

3.00 OBRAS DE CONCRETO SIMPLE

3.01 PISO BAÑO

3.01.01 CONCRETO 210 KG/CM2, SIN BOMBA, DOSIF. EN OBRA M3

3.01.02 ENCOFRADO Y DESENCOFRADO DE PISO M2

4.00 VARIOS

4.01 SUMINISTRO E INSTALACION DE LAVADERO UND

4.04 SUMINISTRO E INSTALACION DE URINARIO UND

4.05 SUMINISTRO E INSTALACION DE INODORO UND

ELIMINACION DE MATERIAL EXCEDENTE PROCEDENTE DE LAS EXCAVACIONES

PRESUPUESTO: ADICIONAL BAÑO 1 PISO

Fecha: 03/03/2016

METRADO P.U. PARCIAL

1.00 S/. 200.00 S/. 200.00

1.00 S/. 250.00 S/. 250.00

9.75 S/. 40.00 S/. 390.00

1.00 S/. 150.00 S/. 150.00

1.50 S/. 415.00 S/. 622.50

3.00 S/. 75.00 S/. 225.00

1.00 S/. 250.00 S/. 250.00

4.00 S/. 320.00 S/. 1,280.00

4.00 S/. 450.00 S/. 1,800.00

COSTO DIRECTO S/. 5,167.50

UTILIDADES 387.56

SUB TOTAL S/. 5,555.06

IGV 18% 999.91

TOTAL S/. 6,554.97

PRESUPUESTO: DRYWALL

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM

1.00

1.01

1.02

1.03

2.00

2.01

2.02

2.03

2.04

2.05

2.06

3.00

3.01

3.02

3.03

3.04

3.05

3.06

3.07

3.08

3.09

3.10

4.00

4.01

4.02

4.03

4.04

4.05

4.06

5.00

5.01

5.02

5.03

5.04

5.05

5.06

6.00

6.01

6.02

6.03

6.04

6.05

6.06

6.07

6.08

7.00

7.01

PRESUPUESTO: DRYWALL

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

DESCRIPCION

ARQUITECTURA

DRYWALL

DRYWALL CAJA (CAFETERIA)

MUROS DE TABIQUE DE DRYWALL

INSTALACION DE PUERTA, VENTANAS, ETC.

TECHO

PISO 5

DINTEL FACHADA MAMPARA DE 60CM

DINTEL PASADIZO PARA CLARABOYA

DINTEL ESCALERA PARA CLARABOYA

RECUBRIMIENTO CON DRYWALL COLUMNAS DE ACERO

MURO CON PLANCHA SUPER BOAR FACHADA

DETALLE DRYWALL INGRESO ESCALERA DE GATO

PISO 4

INSTALACION BALDOSA AULA 407

INSTALACION BALDOSA BAÑOS

INSTALACION DE TABIQUE DE DRYWALL BAÑO

INSTALACION DE FIBRA DE VIDRIO BAÑO

ABERTURA DE PUERTA Y RESANE BAÑO DISCAPACITADOS VARIOS

CERRAR CON DRYWALL PUERTA EXISTENTE BAÑO DAMAS

INSTALACION DE FIBRA DE VIDRIO BAÑO DAMAS

FORRADO DE VIGAS DE ACERO CON DRYWALL

DINTEL DESNIVEL DE BALDOSA AULA 407

REUBICAION DE VENTANA AULA 401

PISO 3

INSTALACION BALDOSA BAÑOS

INSTALACION DE TABIQUE DE DRYWALL BAÑO

INSTALACION DE FIBRA DE VIDRIO BAÑO

ABERTURA DE PUERTA Y RESANE BAÑO DISCAPACITADOS VARIOS

CERRAR CON DRYWALL PUERTA EXISTENTE BAÑO DAMAS

INSTALACION DE FIBRA DE VIDRIO BAÑO DAMAS

PISO 2

INSTALACION BALDOSA BAÑOS

INSTALACION DE TABIQUE DE DRYWALL BAÑO

INSTALACION DE FIBRA DE VIDRIO BAÑO

ABERTURA DE PUERTA Y RESANE BAÑO DISCAPACITADOS

CERRAR CON DRYWALL PUERTA EXISTENTE BAÑO DAMAS

INSTALACION DE FIBRA DE VIDRIO BAÑO DAMAS

PISO 1

INSTALACION BALDOSA BAÑOS

INSTALACION DE TABIQUE DE DRYWALL BAÑO

INSTALACION DE FIBRA DE VIDRIO BAÑO

ABERTURA DE PUERTA Y RESANE BAÑO DISCAPACITADOS

CERRAR CON DRYWALL PUERTA EXISTENTE BAÑO DAMAS

INSTALACION DE FIBRA DE VIDRIO BAÑO DAMAS

MODIFICACION DE PUERTA LABORATORIO

MURO ALINEACION CON PLACA

AZOTEA

PARAPETO ESTRUCTURA DE ACERO Y PLANCHA SUPER BOAR

PRESUPUESTO: DRYWALL

UND METRADO P.U. PARCIAL

M2 16.00 S/. 75.00 S/. 1,200.00

GLB 1.00 S/. 350.00 S/. 350.00

GLB 1.00 S/. 300.00 S/. 300.00

ML 18.00 S/. 72.00 S/. 1,296.00

ML 40.00 S/. 72.00 S/. 2,880.00

ML 20.00 S/. 72.00 S/. 1,440.00

ML 31.00 S/. 64.00 S/. 1,984.00

M2 6.00 S/. 90.00 S/. 540.00

M2 4.50 S/. 72.00 S/. 324.00

M2 52.00 S/. 65.00 S/. 3,380.00

M2 20.00 S/. 65.00 S/. 1,300.00

M2 7.00 S/. 78.00 S/. 546.00

M2 7.00 S/. 15.00 S/. 105.00

GLB 1.00 S/. 365.00 S/. 365.00

M2 2.00 S/. 85.00 S/. 170.00

M2 2.00 S/. 15.00 S/. 30.00

ML 20.00 S/. 72.00 S/. 1,440.00

ML 4.00 S/. 72.00 S/. 288.00

GLB 1.00 S/. 365.00 S/. 365.00

M2 20.00 S/. 65.00 S/. 1,300.00

M2 7.00 S/. 78.00 S/. 546.00

M2 7.00 S/. 15.00 S/. 105.00

GLB 1.00 S/. 365.00 S/. 365.00

M2 2.00 S/. 85.00 S/. 170.00

M2 2.00 S/. 15.00 S/. 30.00

M2 20.00 S/. 65.00 S/. 1,300.00

M2 7.00 S/. 78.00 S/. 546.00

M2 7.00 S/. 15.00 S/. 105.00

GLB 1.00 S/. 365.00 S/. 365.00

M2 2.00 S/. 85.00 S/. 170.00

M2 2.00 S/. 15.00 S/. 30.00

M2 20.00 S/. 65.00 S/. 1,300.00

M2 7.00 S/. 78.00 S/. 546.00

M2 7.00 S/. 15.00 S/. 105.00

GLB 1.00 S/. 365.00 S/. 365.00

M2 2.00 S/. 85.00 S/. 170.00

M2 2.00 S/. 15.00 S/. 30.00

GLB 1.00 S/. 500.00 S/. 500.00

M2 3.00 S/. 52.00 S/. 156.00

ML 85.00 S/. 205.00 S/. 17,425.00

COSTO DIRECTO S/. 43,932.00

UTILIDADES (7.5%) 3,294.90

SUB TOTAL S/. 47,226.90

IGV 18% 8,500.84

TOTAL S/. 55,727.74

PRESUPUESTO: DRYWALL

Fecha: 04/03/2016

PRESUPUESTO: BARAMDA 5 PISO

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM DESCRIPCION UND

ESTRUCTURA (METALICA)

1.00 BARANDA DE ACERO

1.01 BARANDA DE ACERO H=90CM ML

PRESUPUESTO: BARAMDA 5 PISO

Fecha: 03/03/2016

METRADO P.U. PARCIAL

2.50 S/. 150.00 S/. 375.00

COSTO DIRECTO S/. 375.00

UTILIDADES (7.5%) 28.13

SUB TOTAL S/. 403.13

IGV 18% 72.56

TOTAL S/. 475.69

PRESUPUESTO: PUERTA, MELAMINE Y VIDRIOS

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM

1.00

1.01

1.02

1.03

1.04

PRESUPUESTO: PUERTA, MELAMINE Y VIDRIOS

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

DESCRIPCION

ARQUITECTURA

PUERTA, MELAMINE Y VIDRIO

PUERTA DE MADERA BAÑO DISCAPACITADOS 1 AL 4 PISO

DIVISOR DE MELAMINE INODOROS BAÑO 1 PISO

DIVISOR DE VIDRIO URINARIO BAÑO 1 PISO

ESPEJO BAÑO DE VARONES 1 PISO

PRESUPUESTO: PUERTA, MELAMINE Y VIDRIOS

UND METRADO P.U. PARCIAL

UND 4.00 S/. 1,050.00 S/. 4,200.00

ML 7.00 S/. 480.00 S/. 3,360.00

UND 5.00 S/. 175.00 S/. 875.00

UND 1.00 S/. 400.00 S/. 400.00

COSTO DIRECTO S/. 8,835.00

UTILIDADES (7.5%) 662.63

SUB TOTAL S/. 9,497.63

IGV 18% 1,709.57

TOTAL S/. 11,207.20

PRESUPUESTO: PUERTA, MELAMINE Y VIDRIOS

Fecha: 03/03/2016

PRESUPUESTO: CERAMICO

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM DESCRIPCION UND

ARQUITECTURA

1.00 CERAMICO

1.01 BAÑO VARONES 1 PISO M2

1.02 BAÑO DISCAPACITADOS 1 AL 4 PISO M2

1.03 BAÑO VARONES 2 AL 4 PISO M2

1.04 DEMOLICION CERAMICO BAÑO 1 PISO M2

1.05 DESMONTAJE MELAMINE GLB

1.06

PRESUPUESTO: CERAMICO

Fecha: 03/03/2016

METRADO P.U. PARCIAL

49.7 S/. 66.00 S/. 3,280.20

77.3 S/. 66.00 S/. 5,100.48

13.5 S/. 66.00 S/. 891.00

7.6 S/. 42.00 S/. 319.20

1.0 S/. 200.00 S/. 200.00

S/. 0.00

COSTO DIRECTO S/. 9,790.88

UTILIDADES (7.5%) 734.32

SUB TOTAL S/. 10,525.20

IGV 18% 1,894.54

TOTAL S/. 12,419.73

PRESUPUESTO: PINTURA

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM DESCRIPCION UND

1.00 ARQUITECTURA

1.01 DINTELES DRYWALL 5 PISO M2

1.02 BAÑOS VARONES MURO INTER 1 AL 4 PISO M2

1.03 FACHADA BAÑOS VARONES 1 AL 4 PISO M2

1.04 AULA 401 TECHO Y MUROS M2

1.05 AULA 407 PINTADO DE MUROS M2

1.06 PARAPETO 6 PISO SUPER WOOL M2

1.07 INGRESO AL INSTITUTO M2

PRESUPUESTO: PINTURA

Fecha: 03/03/2016

METRADO P.U. PARCIAL

40.0 12.50 S/. 500.00

60.0 12.50 S/. 750.00

98.0 12.50 S/. 1,225.50

132.2 12.50 S/. 1,652.50

85.5 12.50 S/. 1,068.75

106.0 12.50 S/. 1,325.00

20.0 12.50 S/. 250.00

COSTO DIRECTO S/. 6,771.75

UTILIDADES (7.5%) 507.88

SUB TOTAL S/. 7,279.63

IGV 18% 1,310.33

TOTAL S/. 8,589.96

PRESUPUESTO: ESCALERA DE GATO MAS ESCOTILLA

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM DESCRIPCION UND

1.00 ESTRUCTURA METALICA

1.01 ESCALERA DE GATO GLB

1.02 ESCOTILLA GLB

PRESUPUESTO: ESCALERA DE GATO MAS ESCOTILLA

Fecha: 15/02/2016

METRADO P.U. PARCIAL

1.0 870.00 S/. 870.00

1.0 450.00 S/. 450.00

COSTO DIRECTO S/. 1,320.00

UTILIDADES (7.5%) 99.00

SUB TOTAL S/. 1,419.00

IGV 18% 255.42

TOTAL S/. 1,674.42

PRESUPUESTO: II EE

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM DESCRIPCION UND

1.00 IIEE

1.01 SUMINISTRO E INSTALACION DE EXTRACTORES MIRAY Y/O SIMILARUND

1.02 SUMINISTRO E INSTALACION DE LUMINARIAS 2X36 O 4X18 UND1.03 SALIDA PARA EXTRACTOR UND1.04 SALIDA DE INTERRUPTOR SIMPLE PARA EXTRACTORES UND

AULA 407

1.05 DESMONTAJE DE LUMINARIAS DE 2X36 UND1.06 DESMONTAJE DE VENTILADORES DE TECHO UND1.07 SUMINISTRO E INSTALACION DE LUMINARIAS 2X36 O 4X18 UND1.08 INSTALACION DE VENTILADORES DE TECHO UND

BAÑOS

1.09 UND

1.10 UND

AULA 401

1.11 DESMONTAJE DE EXTRACTORES UND1.12 DESMONTAJE DE VENTILADORES DE PARED UND

BAÑOS DE 1 AL 4 (DESMONTAJE DE LUMINARIAS, INDEPENDIZACION DE CIRCUITOS, ENTUBADOS, COLOCACION DE CAJAS RETANGULARES, CABLEADOS PARA LUMINARIAS E LUMINARIAS E INTERRUPTORES, Y COLOCACION DE MANGA FLEXIBLE A DUCTO DE VENTILACION

BAÑOS DE 1 AL 4 DISCAPACITADOS (DESMONTAJE DE LUMINARIAS, INDEPENDIZACION DE CIRCUITOS, ENTUBADOS, COLOCACION DE CAJAS RETANGULARES, CABLEADOS PARA LUMINARIAS E LUMINARIAS E INTERRUPTORES, Y COLOCACION DE MANGA FLEXIBLE A DUCTO DE VENTILACION

1.13 DESMONTAJE DE VENTILADORES DE TECHO UND

ENTUBADO DE RED

1.14ML

INSTALACION DE CAJA PASE DE 10 X 10 ENTUBADO CON TUBERIA DE 2"DESDE EL 5TO AL 2DO PISO

PRESUPUESTO: II EE

Fecha: 03/03/2016

METRADO P.U. PARCIAL

3.0 240.00 S/. 720.00

26.0 210.00 S/. 5,460.005.0 80.00 S/. 400.003.0 90.00 S/. 270.00

10.0 30.00 S/. 300.002.0 35.00 S/. 70.0011.0 210.00 S/. 2,310.002.0 50.00 S/. 100.00

4.0 650.00 S/. 2,600.00

4.0 850.00 S/. 3,400.00

2.0 35.00 S/. 70.002.0 35.00 S/. 70.00

2.0 65.00 S/. 130.00

50.0 35.00 S/. 1,750.00

COSTO DIRECTO S/. 17,650.00

UTILIDADES (7.5%) 1,323.75

SUB TOTAL S/. 18,973.75

IGV 18% 3,415.28

TOTAL S/. 22,389.03

PRESUPUESTO: CLARABOYA

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM DESCRIPCION UND

1.00 Tragaluz Pasadizo 1.01 Estructura Metálica Kg.

1.02 Canaleta de drenaje ML.

1.03 Cobertura de Policarbonato m2

1.04 Accesorio en T ML.

1.05 Accesorio en U ML.

1.06 Instalacion de policarbonato y accesorios m2

1.07 Puntos de drenaje pluvial unidad

1.08 Ventanas m2

Tragaluz Escalera 1.09 Estructura Metálica Kg.

1.10 Canaleta de drenaje ML.

1.11 Cobertura de Policarbonato m2

1.12 Accesorio en T ML.

1.13 Accesorio en U ML.

1.14 Instalacion de policarbonato y accesorios m2

1.15 Puntos de drenaje pluvial unidad

1.16 Ventanas m2

PRESUPUESTO: CLARABOYA

Fecha: 03/03/2016

METRADO P.U. PARCIAL

460.8 11.50 S/. 5,299.20

14.5 60.00 S/. 870.00

15.2 83.72 S/. 1,274.22

2.1 19.80 S/. 41.58

30.6 20.68 S/. 632.81

15.2 102.30 S/. 1,557.01

3.0 185.00 S/. 555.00

24.5 320.00 S/. 7,833.60

405.8 11.50 S/. 4,666.70

3.9 60.00 S/. 235.20

17.8 83.72 S/. 1,493.56

10.5 19.80 S/. 207.90

14.8 20.68 S/. 306.06

15.2 102.30 S/. 1,552.91

1.0 185.00 S/. 185.00

10.4 320.00 S/. 3,315.20

COSTO DIRECTO S/. 30,025.96

UTILIDADES (7.5%) 2,251.95

SUB TOTAL S/. 32,277.90

IGV 18% 5,810.02

TOTAL S/. 38,087.92

PRESUPUESTO: DRYWALL

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

ITEM

1.00

1.01

2.00

2.10

3.00

3.01

4.00

4.01

2.04

PRESUPUESTO: DRYWALL

PROPIETARIO: INSTITUTO SISE ATE

PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE

DESCRIPCION

ARQUITECTURA

DRYWALL

PISO 4

GRANITO EN MESA DE BAÑO DE 4TO PISO

PISO 3

GRANITO EN MESA DE BAÑO DE 3TO PISO

PISO 2

GRANITO EN MESA DE BAÑO DE 2TO PISO

PISO 1

GRANITO EN MESA DE BAÑO DE 1ER PISO

PRESUPUESTO: DRYWALL

UND METRADO P.U. PARCIAL

GBL 1.00 S/. 230.00 S/. 230.00

GBL 1.00 S/. 230.00 S/. 230.00

GBL 1.00 S/. 230.00 S/. 230.00

GBL 1.00 S/. 1,400.00 S/. 1,400.00

S/. 0.00

COSTO DIRECTO S/. 2,090.00

UTILIDADES (7.5%) 156.75

SUB TOTAL S/. 2,246.75

IGV 18% 404.42

TOTAL S/. 2,651.17

PRESUPUESTO: DRYWALL

Fecha: 03/03/2016